tjc0831 Typewritten Text
REPLACE SOLAR PHOTO VOLTAIC & WATER HEATER BUILDING 100 DDJC
tjc0831 Typewritten Text G1
DAK0013
Typewritten Text
PROJECT LOCATION
DAK0013
Line
B L A
C K
V
E A
T C
H
S P
E C
I A
L
P
R O
J E
C T
S
C
O R
P
O V
E R
L A
N D
P
A R
K
K
A N
S A
S tjc0831 Typewritten Text
REPLACE SOLAR PHOTO VOLTAIC & WATER HEATER BUILDING 100 DDJC
tjc0831 Typewritten Text
DRWG # E1
DAK0013
Typewritten Text
BUILDING ELECTRICAL SYSTEM & SOLAR PV INTERCONNECTION PANEL HDP
DAK0013
Line
Rectangle
TO DDJCT-B201A
SHEET 1 OF 1
CBL-B100-2-4D-1
Demand 20.24 kVA
(1) 1/0 AWG/kcmil
Copper , 3-1/C , 600 V
20.0 ft
CBL-B100-2-4D-3
Demand 20.24 kVA
(1) 500 AWG/kcmil Copper , 4-1/C , 600 V
6.0 ft
CBL-B100-WH XFMR0
Demand 4.34 kVA
(1) 1/0 AWG/kcmil
Copper , 3-1/C+G , 600 V
4.0 ft
CBL-B100-LDP-2
Demand 51.41 kVA
(1) 350 AWG/kcmil
Copper , 4-1/C , 600 V
4.0 ft
CBL-0679
Demand 20.24 kVA
(1) 750 AWG/kcmil
Copper , 3-1/C+G , 600 V
0.1 ft
BUS-B100-2-4D(LINE SIDE)
208.0V
S
P
XF2-B100-T-2-4D
112.5 kVA, NL 480 V - 208 V
3.7000 %
Demand 20.24 kVA
SCH-B100-100E-10
Demand 1.63
SCH-B100-WH-1
Demand 4.34
SCH-B100-2H
Demand 6.82
SCH-B100-1H
Demand 4.70
SCH-B100-H
Demand 10.01
SCH-B100-2-3D
Demand 0.73
SCH-B100-2-2D
Demand 0.65
SCH-B100-100
Demand 2.43
SCH-B100-2-1D
Demand 7.04
SCH-B100-2-4D
Demand 20.24
SCH-B100-K SECT II
Demand 3.62
SCH-B100-K SECT I
Demand 9.59
SCH-B100-M
Demand 2.30
SCH-B100-2L
Demand 1.86
SCH-B100-1L
Demand 3.02
SCH-B100-PNL L
Demand 0.00
SCH-B100-LDP
Demand 51.41
SCH-B100-HDP
Demand 97.51
BUS-B100-PNL L
208.0V
CBL-B100-PNL L
Demand 0.00 kVA
(1) 6 AWG/kcmil
Copper , 3-1/C+G , 600 V
85.0 ft
CB-B100-PNL L
70.0 A
BUS-B100-100E-10
208.0V
CBL-B100-100E-10
Demand 1.63 kVA
(1) 6 AWG/kcmil
Copper , 3-1/C+G , 600 V
188.0 ft
CB-B100-WH-1
225.0 A
BUS-B100-WH-1
208.0V
S
P
XF2-B100-WAREHOUSE XFMR
112.5 kVA, NL
480 V - 208 V
3.7000 % Demand 4.34 kVA
CBL-B100-WH XFMR
Demand 4.34 kVA
(1) 2 AWG/kcmil
Copper , 3-1/C , 600 V
120.0 ft
CB-B100-WH XFMR
100.0 A
BUS-B100-2-4D
208.0V
CB-B100-2-4D-2
400.0 A
CB-B100-100-2
100.0 A
BUS-B100-100
208.0V
CBL-B100-100
Demand 2.43 kVA
(1) 1 AWG/kcmil
Copper , 3-1/C+G , 600 V
195.0 ft
CB-B100-100-1
100.0 A
CB-B100-2-3D-2
100.0 A
BUS-B100-2-3D
208.0V
CBL-B100-2-3D
Demand 0.73 kVA
(1) 2 AWG/kcmil
Copper , 3-1/C+G , 600 V
175.0 ft
CB-B100-2-3D-1
20.0 A
CB-B100-2-2D-2
225.0 A
BUS-B100-2-2D
208.0V
CBL-B100-2-2D
Demand 0.65 kVA
(1) 4/0 AWG/kcmil
Copper , 3-1/C+G , 600 V
160.0 ft
CB-B100-2-2D-1
20.0 A
CB-B100-2-1D-2
225.0 A
BUS-B100-2-1D
208.0V
CBL-B100-2-1D
Demand 7.04 kVA
(1) 4/0 AWG/kcmil
Copper , 3-1/C+G , 600 V
180.0 ft
CB-B100-2-1D-1
100.0 A
BUS-B100-K SECT II
208.0V
CBL-B100-K SECT II
Demand 3.62 kVA
(1) 1/0 AWG/kcmil
Copper , 3-1/C+G , 600 V
75.0 ft
CB-B100-K SECT II
150.0 A
BUS-B100-K SECT I
208.0V
CBL-B100-K SECT I
Demand 9.59 kVA
(1) 1/0 AWG/kcmil
Copper , 3-1/C+G , 600 V
70.0 ft
CB-B100-K SECT I
150.0 A
BUS-B100-M
208.0V
CBL-B100-M
Demand 2.30 kVA
(1) 6 AWG/kcmil
Copper , 3-1/C+G , 600 V
20.0 ft
CB-B100-M
50.0 A
BUS-B100-2L
208.0V
CBL-B100-2L
Demand 1.86 kVA
(1) 6 AWG/kcmil
Copper , 3-1/C+G , 600 V
260.0 ft
CB-B100-2L
70.0 A
BUS-B100-2H
480.0V
CBL-B100-2H
Demand 6.82 kVA
(1) 4 AWG/kcmil
Copper , 3-1/C+G , 600 V
270.0 ft
CB-B100-2H
60.0 A
BUS-B100-1L
208.0V
CBL-B100-1L
Demand 3.02 kVA
(1) 6 AWG/kcmil
Copper , 3-1/C+G , 600 V
245.0 ft
CB-B100-1L
70.0 A
BUS-B100-1H
480.0V
CBL-B100-1H
Demand 4.70 kVA
(1) 6 AWG/kcmil
Copper , 3-1/C+G , 600 V
250.0 ft
CB-B100-1H
100.0 A
BUS-B100-H
480.0V
CBL-B100-H
Demand 10.01 kVA
(1) 6 AWG/kcmil
Copper , 3-1/C+G , 600 V
110.0 ft
CB-B100-H
70.0 A
BUS-B100-LDP
208.0V
S
P
XF2-B100-TRANSFORMER T1
112.5 kVA, NL
480 V - 208 V
3.7000 % Demand 51.41 kVA
CBL-B100-LDP-1
Demand 51.41 kVA
(1) 2/0 AWG/kcmil
Copper , 3-1/C , 600 V
4.0 ft
CB-B100-LDP
150.0 A
BUS-B100-HDP
480.0V
CB-B100-HDP
500.0 A
CBL-0579
Demand 97.51 kVA
(1) 500 AWG/kcmil Copper , 3-1/C , 600 V
125.0 ft
BUS-B100-HDP (LINE SIDE)
480.0V
CBL-0650
Demand 97.51 kVA
(1) 750 AWG/kcmil
Copper , 4-1/C , 600 V
0.1 ft
BUS-B100-WH-1 (LINE SIDE)
208.0V
CBL-0673
Demand 4.34 kVA
(1) 750 AWG/kcmil
Copper , 4-1/C , 600 V
0.1 ft
CB-B100-2-4D-1
175.0 A
CBL-B100-2-4D-2
Demand 20.24 kVA
(1) 2 AWG/kcmil
Copper , 3-1/C , 600 V
8.0 ft
BUS-B100-2-1D (LINE SIDE)
208.0V
CBL-0712
Demand 7.04 kVA
(1) 750 AWG/kcmil
Copper , 4-1/C , 600 V
0.1 ft
BUS-B100-100 (LINE SIDE)
208.0V
CBL-0713
Demand 2.43 kVA
(1) 750 AWG/kcmil
Copper , 4-1/C , 600 V
0.1 ft
BLACK & VEATCH
SPECIAL PROJECTS CORP
OVERLAND PARK, KANSAS
ARC FLASH ANALYSIS
DDJC TRACY
DDJCT-B100 SHEET 5 OF 5
SINGLE LINE DIAGRAM
EXISTING
June 26, 2013
DAK0013
Typewritten Text
REPLACE SOLAR PHOTOVOLTAIC & WATER HEATER BUILDING 100 DDJC
DAK0013
Typewritten Text E 2
DAK0013
Rectangle
DAK0013
Typewritten Text
DRWG # E 2
BUILDING ELECTRIC PANEL HDP
SINGLE LINE
55'-6.2"
9'-0.4"
1'
5'-1.4"
14'-1.4" 3'-10.6" 9'
S.
C
H
IS
M
AN
R
OA
D N
TRUE
NORTH
55'-6.2"
9'-0.4"
1'
5'-1.4"
14'-1.4" 3'-10.6" 9' iBOS
TYPICAL
SEE NOTE 1
SUNPACK-6M
SEE NOTE 2
RTU
TYPICAL
4' MAINTENANCE
SETBACK
TYPICAL
4' FIRE SETBACK
TYPICAL
DETAIL A & B
202'-3.8"
221'-1.2"
296'-5.7"
9'-0.4"
RL-1
RO
OF
L
AY
OU
T
DRAWING NUMBER
CHECKED BY: CT
DRAWN BY: MCL
JOB No:
REV DWG DATE
COGENRA SOLAR
365 E. MIDDLE FIELD RD.
MOUNTAIN VIEW, CA 94043
(P) 650-230-3400
(F) 650-967-2445
A INITIAL 12/16/11
SCALE: NTS
SHEET:
S.
C H
RI
SM
AN
R
D
TR
AC
Y, C
A
B
TR
AC
Y
AR
M Y
D
EP
OT
GENERAL SHEET NOTES
REFERENCE SHEET NOTES
A. ALL CONSTRUCTION AND
WORKMANSHIP TO CONFORM TO
ALL 2011 NEC AND LOCAL
BUILDING CODES.
B. THE CONTRACTOR SHALL VERIFY
EXISTING DIMENSIONS,
ELEVATIONS, AND CONDITIONS
PRIOR TO STARTING
CONSTRUCTION. PRIOR TO
CONTINUING WORK, NOTIFY
COMPREHENSIVE ENGINEERING
OF ANY DEVIATIONS FROM THE
PLAN WHICH ARE NECESSITATED
BY FIELD CONDITIONS
DIFFERENT THAN THOSE
INDICATED ON PLAN.
1. iBOS IS LOCATED ON WEST SIDE
OF ARRAY TO MINIMIZE THE
CONDUIT AND WIRE LENGTH
RUNS TO MECHANICAL ROOM.
2. ARRAY SIZE IS 1 QTY 2X6
SUNPACK-12M FOR TOTAL OF 12
MODULES. PV SYSTEM SIZE IS
5.16 KW DC.
3. COGENRA SUNPACK-6M
ORIENTATED FACING 180° SOUTH
AZIMUTH.
DETAIL A: SUNPACK-12M
TRACY ARMY DEPOT DETAIL B: 12 MODULE RACKING
Joe B Rectangle
Joe B Rectangle
Joe B Text Box New location
Joe B Line
Joe B Line
Joe B Text Box AS-Builts 4/24/2013
Joe B Text Box Parshall Construction
DAK0013
Typewritten Text
REPLACE SOLAR PHOTOVOLTAIC & WATER HEATER BUILDING 100 DDJC
DAK0013
Typewritten Text
DRWG # PV1
DAK0013
Rectangle
DAK0013
Rectangle
DAK0013
Polygon
DAK0013
Typewritten Text
DEMOLISH AND REMOVE
NORMALLY CLOSED
M2
M2
M2
M2
<E> CW(S)
M2
M2
SOLAR SUPPLY & RETURN 1" DIA
TR
AC
Y
AR
M Y
D
EP
OT
SO
LA
R
CO
G
EN
ER
AT
IO
N P
RO
JE
CT
S.
C
H
RI
SM
AN
R D
TR
AC
Y, C A
GENERAL SHEET NOTES
REFERENCE SHEET NOTES
MECH-1
SO
LA
R
TH
ER
M
AL
RO
OF
P
IP
E
LA
YO
UT
PIPING IS DRAWN DIAGRAMMATICALLY FOR
CLARITY AND DOES NOT SHOW EVERY OFFSET,
BEND, AND 90. THE INSTALLING CONTRACTOR IS
TO CONFIRM THE ROUTING BASED ON FIELD
CONDITIONS AND ROUTE ACCORDINGLY TO BEST
SUIT FIELD CONDITIONS.
VERIFY ALL EXISTING CONDITIONS AND NOTIFY
ENGINEER OF ANY DISCREPANCIES FOUND.
FIELD INSTALLED EQUIPMENT SHALL NOT CARRY
THE WEIGHT OF THE PIPING, SUPPORT
ACCORDINGLY.
ALL WORK TO BE IN ACCORDANCE
UNIFORM SOLAR ENERGY CODE - 2009
CALIFORNIA MECHANICAL CODE - 2010
CALIFORNIA PLUMBING CODE - 2010
CALIFORNIA ELECTRICAL CODE -2010
NFPA 70 -2011
CONTRACTOR SHALL HAND OVER A FULLY
FUCNTIONAL AND OPERABLE SYSTEM TO THE
CUSTOMER.
A.
B.
C.
D.
E.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
ROUTE SUPPLY AND RETURN PIPING TO SOLAR
MODULES. PIPING SHALL MEET ASTM B88
TYPE M, HARD DRAWN, FITTINGS SHALL MEET
ASTM B16.
BUILDING CITY WATER AND DOMESTIC HOT
WATER SHALL MEET NSF 61, IN ADDITION TO
MEETING ASTM B88 TYPE L HARD DRAWN,
FITTINGS SHALL BE ASTM B16.
INSULATE AND JACKET ALL NEW PIPING.
INSULATION THICKNESS SHALL MEET THE
FOLLOWING;
PIPE 1 INCH OR LESS = 1/2 INCH
PIPE 1-1/4 TO 2 INCH = 1 INCH
PIPE 2.5 TO 4 = 1-1/2 INCH
INSULATION INSTALLED OUTDOOR SHALL HAVE
ALUMINUM JACKETING WITH THE SEAM
INSTALLED ON THE LOWER HALF OF THE PIPE
AND SEALED TO PROTECT FROM WATER
DAMAGE.
SOLAR THERMAL WATER SHALL BE CLEARLY
IDENTIFIED WITH BLACK LETTERS AND
YELLOW BACKGROUND AND SHALL READ
“CAUTION: NON-POTABLE WATER, DO NOT
DRINK” LETTER SIZING SHALL FOLLOW UPC
TABLE 6-1.
MAXIMUM PIPE SUPPORT SPACING
1-1/2 INCH & SMALLER SHALL NOT EXCEED
6FT. 2 INCH & LARGER SHALL NOT EXCEED 10
FT.
MAINTAIN MIN 4 FT CLEARANCE FROM ANY
PARAPET WALL.
PROVIDE ETHERNET CAT 5 CABLE FROM
BUILDING OWNER TO FIRST iBOS UNIT.
CO-ORDINATE WITH OWNER'S I.T.
ADMINISTRATOR FOR A I.P. ADDRESS.ROUTE
CAT 5 TO ROOF TOP iBOS UNIT.
SUPPLY AIR VENTS AT ALL SYSTEM HIGH
POINTS AND DRAINS AT ALL SYSTEM LOW
POINTS
CLEAN, PURGE, AND FILL SYSTEM WITH 20%
PROPYLENE GLYCOL BY VOLUME.
CHECKED BY:
DRAWN BY: AC
JOB No: TRACY DEPOT
SCALE: 1/8" = 1'
DRAWING NUMBER
A
REV DATE
100% CD 12/29/2011
For Reference Only
TJC0908
Text Box
TJC0908
Line
TJC0908
Text Box N
Joe B Text Box See sheet Roof Layout for revised location
Joe B Text Box As-Builts 4/24/2013
Joe B Text Box Parshall Construction
DAK0013
Typewritten Text
REPLACE SOLAR PHOTOVOLTAIC & WATER HEATER BUILDING 100 DDJC
DAK0013
Typewritten Text
DRWG # PV2
DAK0013
Rectangle
DAK0013
Typewritten Text
SEE DRWG# PV1 FOR NEW LOCATION
LEVEL INDICATOR
SOLAR HEAT EXCHANGER IN
DOMESTIC HEAT EXCAHNGER IN
DOMESTIC HEAT
SOLAR HEAT EXCHANGER OUT
EXCHANGERS OUT
MANUAL AIR VENT (TYP X 2)
SOLAR HEAT EXCHANGER
(TYP x1)
SEE EQUIPEMENT SCEDULE
DOMESTIC HEAT EXCHANGER
(TYP x2)
SEE EQUIPEMENT SCHEDULE
(TYP x4)
DRAIN/PURGE
MANUAL AIR VENTS
(TYP x2)
P.O.C.
<E> WATER HEATER
<E> CW(S), VERIFY SIZE IN FEILD
N.C.
DOMESTIC HOT WATER
CITY WATER TO
FROM SOLAR TANK HEAT EXCHANGER
TANK HEAT EXCHANGER
P.O.C.
<E> RE-CIRC PUMP
MAKE-UP WATER
<E> DHW (S)
TB
L
TB
L
TB
N
TB
G
N D
TB
L
TB
L
TB
N
TB
G
N D
TB
L
TB
L
TB
N
TB
G
N D
INPUT POWER
208/240VAC
15 AMP MAX
OUTPUT POWER
208/240VAC
5 AMP MAX
OUTPUT POWER
208/240VAC
5 AMP MAX
SOLAR BOOSTER PUMP
BUILDING POWER CONNECTION
D C
CO
M
D C
CO
M
D C
CO
M
D C
CO
M 24
+V D
C
+V D
C
BO
OS
TE
R
TB
G
N D
BOOSTER PUMP START STOP SIGNAL
& ROUTER RESET SINGAL
24 AWG 2 PAIR
8 PORT SWITCH
TO/FROM
M
ASTER iBOS
CAT 5 ETHERNET CABLE
NOT USED
PUMP#1 PUMP#2
COMMUNICATION BOX
JUNIPER VPN GATEWAY
CAT 5 ETHERNET CABLE
TO/FROM
BLD
G
MFGREQUIPEMENT TAG MODEL POWEROPERATING WIEGHT
TK
SR
PS
SOLAR TANK
SOLAR RECEIVERS
HAASE
COGENRA SUNDECK
iBOS
T413-22
UN-PRESSUREIZED SOLAR TANKS - HEAT EXCHANGERS PER TANK
CONNECTION SIZE NOTES
DN40 BST TO
1-1/2 INCH MPT W/ ADAPTER
VOLUME
4750 LBS 560 GAL NONE
208-240V iBOS CONNECTS TO SOLAR RECEIVERS USING SUPPLIED
CORRUGATED STAINLESS STEEL TUBING
SOLAR THERMAL
PUMP STATION
3/4 INCH (S) & (R)
(2) DOMESTIC WATER HX MODEL (B4)
(1) SOLAR HX (MODEL S4)
HEAT TRANSFER FLUID & POTABLE WATER SEPARATED BY VENTED
TANK STORAGE WATER (DOUBLE WALL HEAT EXCHANGER)
SOLAR
SOLAR
COGENRA CONTAINS UL 508 RATED CONTROLS ENCLOSURE
SEE ELECTRICAL DWGS FOR DETAILS 3/4 INCH NPT (S) &1 INCH (R)
SEE ELECL
DWGS
75 LBS
300 LBS 0.9 GAL
1.0 GAL 1PH/60HZ
CM COMMUNICATION
BOX SOLAR
COGENRA COMM BOX NONE 25 LBS NONE
208-240V
1PH/60HZ
UL 508 RATED CONTROLS ENCLOSURE
CONTROLS SOLAR BOOSTER PUMP
PRESSURE RELEIF
AIR
SEPERATOR
P.O.C.
PRUGE FILL
FLOW &
TEMP
PRES &
TEMP
(TYP 2)
EXPAN
SION
TAN
K
SOLAR RETURNS 3/4" NPT
SOLAR SUPPLY & RETURN 1" NPT
2.1 G
AL
SOLAR SUPPLY 1" NPTP.O.C.
UL 508 LISTED CONTROLS CABINET
CALCIUM SILICATE INSERT
B-LINE DURA BLOCK OR EQUAL
EXISTING ROOF
W/ PRE-GALVANIZED STEEL OR ALUMINUM JACKETING
SOLAR SUPPLY & RETURN
(SEE ROOF LAYOUT FOR SIZING)
SOLAR AC CONDUIT
W/ P1000 STRUT OR EQUAL
EITHERNET & CONTROLS
ROOF SUPPORT
TR
AC
Y
AR
M Y
D
EP
OT
SO
LA
R
CO
G
EN
ER
AT
IO
N P
RO
JE
CT
S.
C
H
RI
SM
AN
R D
TR
AC
Y, C A
CALCIUM SILICATE INSERT
W/ PRE-GALVANIZED STEEL OR ALUMINUM JACKETING
SOLAR SUPPLY & RETURN
(SEE ROOF LAYOUT FOR SIZING)
SOLAR AC CONDUIT
P1000 STRUT OR EQUAL
EITHERNET & CONTROLS
STRUCTURAL MEMBER, SSD
SOLAR RACK SUPPORT
GENERAL SHEET NOTES
REFERENCE SHEET NOTES
M-2
M
EC
H D
ET
AI
LS
DRAWING NUMBER
CHECKED BY:
DRAWN BY: AC
REV DWG DATE
COGENRA SOLAR
365 E. MIDDLE FIELD RD.
MOUNTAIN VIEW, CA 94043
(P) 650-230-3400
(F) 650-967-2445
A 100% 12/29/11
SCALE: NOTED
1. ROUTE IBOS PRESSURE RELIEF TO
WITHIN 6 INCHES OF ROOF.
2. SUPPLY MANUAL AIR VENTS AT
SYSTEM HIGH POINTS AND DRAINS AT
SYSTEM LOW POINTS.
3. PROVIDE ISOLATION VALVES SO
SOLAR TANK CAN BE ISOLATED AND
BY-PASSED.
4. FURNISH AND INSTALL SOLAR TANKS
AS SCHEMATICALLY SHOWN IN DETAIL
#1.
5. SEAL ALL BUILDING & ROOF
PENETRATIONS.
6. ALL NEW HYDRONIC PIPING SHALL BE
PRESSURE TESTED TO A PRESSURE
NOT LESS THAN 100 PSI. THIS
PRESSURE SHALL BE MAINTAINED
FOR AT LEAST 30 MINS. REQUIRED
TESTING SHALL BE DONE IN THE
PRESENCE OF THE INSPECTOR OF
THE AHJ IF REQUIRED. PIPING TO BE
PRESSURE TESTED MUST REMAIN
UN-INSULATED UNTIL AFTER
PRESSURE TESTING IS COMPLETED.
7. PROVIDE STRUT SUPPORTS FOR THE
SUPPLY & RETURN PIPING TO THE
STORAGE TANKS AS SHOWN IN
DETAIL #5&6.
A. PIPING IS DRAWN DIAGRAMMATICALLY
FOR CLARITY AND DOES NOT SHOW
EVERY OFFSET, BEND, AND 90. THE
INSTALLING CONTRACTOR IS TO CONFIRM
THE ROUTING BASED ON FIELD
CONDITIONS AND ROUTE ACCORDINGLY
TO BEST SUIT FIELD CONDITIONS.
B. VERIFY ALL EXISTING CONDITIONS AND
NOTIFY ENGINEER OF ANY
DISCREPANCIES FOUND.
C. FIELD INSTALLED EQUIPMENT SHALL NOT
CARRY THE WEIGHT OF THE PIPING,
SUPPORT ACCORDINGLY.
D. ALL WORK TO BE IN ACCORDANCE WITH:
UNIFORM SOLAR CODE - 2010
CALIFORNIA MECHANICAL CODE - 2010
CALIFORNIA PLUMBING CODE - 2010
NPFA 70 - 2011
SCALE: NOT TO SCALE1 2
3 4
SCALE: NOT TO SCALESCALE: NOT TO SCALE
SCALE: NOT TO SCALE
6SCALE: NOT TO SCALE
For Reference Only
Joe B Text Box
GAL
Joe B Text Box Trendsetter
Joe B Text Box As-Builts 4/24/13
Joe B Text Box Parshall Construction
DAK0013
Typewritten Text
REPLACE SOLAR PHOTOVOLTAIC & WATER HEATER BUILDING 100 DDJC
DAK0013
Typewritten Text
DRWG # PV3
DAK0013
Rectangle
MAIN SERVICE PANEL
600A, 3PH, 4W,
480Y/277
TO BE CONFIRMED
EXISTING
GROUNDING
ELECTRODE
SEE NOTE 6
30 A BACKFED BREAKER
SEE NOTE 4
Cogenra Design Calculations (See Note 5)
Project Name: Facebook Building #18 Address: Network Circle, Menlo Park, CA
System Components Component Units Manufactucter and Model Number
1. Photovoltaic Modules 12 Congenra 1 Qty SunPack-12M
2. Inverters 1 SMA Sunnyboy 5000US
3. AC Disconnect SW 1 Square D HU361RB 30 A
Module Specs: Inverter Specs: SunPack 12M Strings:
Isc = 13.1 A Max AC Out = 24 A Mods per string = 12 Voc = 43.9 V CEC eff.= 95.5% # of Strings = 1 Imp = 12.2 A AC output= 208 V Vmp = 35.2 V
STC= 430 W
GENERAL SHEET NOTES
REFERENCE SHEET NOTES
SL-1
SI
N
G
LE
L
IN
E
TR
AC
Y
AR
M
Y D
EP
OT
SO
UT
H
C H
RI
SM
AN
R
D
TR
AC
Y, C
A
CHECKED BY: CT
DRAWN BY: MCL
JOB No:
SCALE: NTS
DRAWING NUMBER
12/16/2011A
REV DATE
.B
INITIAL
TITLE
C:\Users\miller.lai\Downloads\Cogenra-LogoM-RGB.png
Joe B Text Box 277V
Joe B Text Box Breaker # 1
Joe B Text Box 2 # 8 thhn, 1 # 10 Thhn in 3/4" EMT
Joe B Text Box
Joe B Line
Joe B Line
Joe B Text Box Rated maximum power-point current 12.2 A Rated maximum power-point voltage 422.4 V Maximum system voltage 526.8 V Short circuit current 13.1 V
Joe B Text Box Tracy DDJC
Joe B Text Box Panel "HDP"
Joe B Text Box As-Builts 4/24/13
Joe B Text Box Parshall Construction
DAK0013
Typewritten Text
REPLACE SOLAR PHOTOVOLTAIC & WATER HEATER BUILDING 100 DDJC
DAK0013
Rectangle
WG #
DAK0013
Sticky Note
DAK0013
Typewritten Text
DRWG # PV4
DAK0013
Polygon
DAK0013
Typewritten Text
DEMOLISH AND REMOVE
DAK0013
Line
DAK0013
Polygon
DAK0013
Line
DAK0013
Rectangle
MECHANICAL EQUIPMENT SCHEDULE
DRAWING NUMBER
REV DWG DATE
A INITIAL
365 E. MIDDLEFIELD RD.
MOUNTAIN VIEW, CA 94043
(P) 650-230-3400
(F) 650-967-2445
SO
LA
R
CO
-G
EN
ER
AT
IO
N
S
YS
TE
M
IN
ST
AL
LA
TI
ON
T
RA
CY
A
RM
Y
D
EP
OT
SO
UT
H C
H
RI
SM
AN
R
OA
D T
RA
CY
C A, B MISSING
PARTS
M
EC
H
AN
IC
AL
D
ET
AI
LS
M-200
GENERAL SHEET NOTES
REFERENCE SHEET NOTES
DAK0013
Typewritten Text
REPLACE SOLAR PHOTOVOLTAIC & WATER HEATER BUILDING 100 DDJC
DAK0013
Rectangle
DAK0013
Typewritten Text
DRWG # PV5
DAK0013
Polygon
DAK0013
Typewritten Text
DEMOLISH AND REMOVE
Drawing Report
10/6/2015 Page 1
Section: Tracy DD Bldgs.
Page: E-4910_1 - Tracy Defense Depot - Bldg. 100 - South Section Lower / Upper Area
13' 6"
50' 0"
90' 6"
300' 6"
296' 6"
N.I.C.
Lower Area
Upper Area
N.I.B.
135' 0"
Walkpads
Walkpads
70' 6"
Legend Description SF LF EA
Roof Area (613 sqs) 61,292.750 Cricket 1' Base Flashing / Expansion Joint 70.500 1' Counter Flashing 316.500 1' Base Flashing 1,258.000 Walkpads 1,060.000 Roof Drain 35.000
Julio.Ponce Rectangle
Julio.Ponce Rectangle
Julio.Ponce Line
DAK0013
Rectangle
DAK0013
Typewritten Text
DRWG # S1
DAK0013
Rectangle
DAK0013
Typewritten Text
EXISTING ROOF LAYOUT
DAK0013
Rectangle
DAK0013
Rectangle
DAK0013
Typewritten Text
REPLACE SOLAR PHOTOVOLTAIC & WATER HEATER BUILDING 100 DDJC
DAK0013
Typewritten Text
NEW SOLAR PV SYSTEM TO BE INSTALLED ON UPPER ROOF AREA
DAK0013
FOR REFERENCE ONLY
DRWG # S2
DAK0013
Rectangle
DAK0013
Typewritten Text
REPLACE SOLAR PHOTOVOLTAIC & WATER HEATER BUILDING 100 DDJC
DAK0013
Rectangle
DAK0013
BUILDING 100 ROOF DETAILS
DAK0013
Typewritten Text
DRWG # S3
DAK0013
BUILDING 100 ROOF DETAILS
| E 1 Panel HDP Location |
| E 2 Panel HDP SinleLine |
| G 1 General Project Location |
| PV 1 Existing Solar PV and Water Heater Asbuilt Drawing1 |
| PV 2 Existing Solar PV and Water Heater Asbuilt Drawing2 |
| PV 3 Existing Solar PV and Water Heater Asbuilt Drawing3 |
| PV 4 Existing Solar PV and Water Heater Asbuilt Drawing4 |
| PV 5 Existing Solar PV and Water Heater Asbuilt Drawing5 |
| S 1 RoofLayout |
| S 2 Roof Structure 1 |
| S 3 Roof Structure 2 |