Submittal Register

SUBMITTAL REGISTERCONTRACT NO:
TITLE: Task Order Construction ServicesCONTRACTOR:
LOCATION: Defense Distribution Depot San Joaquin
JOB NAME: Warehouse 13 & 14 LED Lighting Upgrades
ACTIVITY NO.TRANSMITTAL NO.SPEFICIATION SECTIONSUBMITTAL DOCUMENT TYPESUBMITTAL DOCUMENT DESCRIPTION01: PS - PRECONSTRUCTION SUBMITTALS

02: SD - SHOP DRAWING

03: PD - PRODUCT DATA

04: S - SAMPLES

05: DD - DESIGN DATA

06: TR - TEST REPORTS

07: C - CERTIFICATES

08: MI - MANUFACTURER'S INSTRUCTIONS

09: MFR - MANUFACTURER'S FIELD REPORTS

10: O&M - OPERATING AND MAINTENANCE

11: CS - CLOSE-OUT SUBMITTALSPARAGRAPH
NUMBERCLASSIFICATION

GOVERNMENT

OR A/E REVIEWERCONTRACTOR
SCHEDULE DATESCONTRACTOR ACTIONDATE RECEIVED FROM
CONTRACTORDATE FORWARDED TO
APPROVING AUTHORITYAPPROVING AUTHORITYDATE RECEIVED FROM
APPROVING AUTHORITYDATE MAILED TO
CONTRACTORREMARKS
SUBMITAPPROVAL NEEDED BY:MATERIAL NEEDED BY:ACTION CODEDATE OF ACTIONDATE FORWARDED
TO REVIEWERDATE RECEIVED

FROM

REVIEWERACTION CODEDATE OF ACTION
DESCRIPTION OF ITEM SUBMITTED
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l1)(l2)(m)(n)(o)(p)(q1)(q2)(r)
Division 1 - General Requirements
01 32 01.00 10, Project Schedule
01PSProject Schedule3.4G
01 33 00, Submittal Procedures
01PSSubmittal Register1.9G
01 35 26, Government Safety Requirements
01PSAccident Prevention Plan (APP)1.6G,A
01PSActivity Hazard Analysis (AHA)1.7G,A
01 45 00.00, Quality Control
01PSQuality Control Plan3.2G
01 57 20.00 10, Environmental Protection
01CSConstruction Waste, Pollution Prevention Spreadsheet1.6G
01 74 19, Construction and Demolition Waste Management
01PSWaste Management Plan1.6G
01CSRecords1.7G
01 78 00, Close-Out Submittals
03PDAs-Built Record of Equipment and Materials1.3.1G
03PDFinal Approved Shop Drawings1.3.2G
03PDWarranty Management Plan1.4G
03PDPerformance Bond1.4.2G
03PDWarranty Tag1.4.5
11CSRecord Drawings (CAD Drawings)1.2G
11CSRecord Drawings (PDF Drawings)1.2
11CSRecord Drawings (Full Size Prints)1.2
11CSRecord Drawings (Color Scan of Red Line Drawings)1.2
Division 2 - Existing Conditions
02 41 00, Demolition and Deconstruction
01PSExisting Conditions1.6G
07CDemolition Plan1.6G
07CNotifications1.6G
11CSReceipts1.6
DIVISION 26 - Electrical
26 05 00.00 40, Common Work Results for Electrical
01PSMaterial, Equipment, and Fixture List1.3G
03PDWires and Cables2.2G
03PDSplices and Connectors, Receptacles2.3, 2.5G
03PDOutlet, Outlet Boxes, and Pull Boxes2.6G
03PDLamps and Lighting Fixtures2.9G
02PDConduites, Raceways and Fittings2.1, 3.1G
08MIManufacturer's Instructions1.3G
26 20 00, Interior Distribution
03SDConduit and Fittings2.2G
03SDOutlet Boxes and Covers2.4G
03PDWires and Cables2.6G
03PDFuses2.17G
03PDReceptacles2.18G
26 51 00, Interior Lighting
03PDLED Luminaires2.2G
03PDLED Drivers2.3G
03PDLight Sources2.4G
03PDLighting Control2.5G
03PDLuminaire Support Hardware2.7G
03PDPower Hook Luminaire Hangers2.8G
03PDEquipment Identification2.9G
03PDFactory Applied Finish2.10G
03PDRecess and Flush-Mounted Luminaires2.11G
03PDSuspended Luminaires2.12G

Page &P of &N

Sheet2

01 32 01.00 10, Project Schedule
01 33 00, Submittal Procedures
01 35 26, Government Safety Requirements
01 45 00.00, Quality Control
01 57 20.00 10, Environmental Protection
01 74 19, Construction and Demolition Waste Management
01 78 00, Close-Out Submittals
02 41 00, Demolition and Deconstruction
26 00 00.00 20, Basic Electrical Materials and Methods
26 05 00.00 40, Common Work Results for Electrical
26 20 00, Interior Distribution
26 51 00, Interior Lighting

Sheet3