Amendment_0001.pdf

PDF 75 KB Posted

Attached to
Miscellaneous Paving and Utilities Requirements Contract Federal contract opportunity
Solicitation number
SP3300-17-R-0008
Issued by
Defense Logistics Agency Distribution

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 3

0001 08-Jun-2017 N/A

SP3300

DLA DISTRIBUTION

ACQUISITION OPERATIONS J7-AB

430 MIFFLIN AVE, SUITE 3102A

NEW CUMBERLAND PA 17070-5008

SP3300

JOSHUA WOODWORTH

717-770-4192 joshua.woodworth@dla.mil

✘ SP3300-17-R-0008

15-May-2017

See Page 2

SP3300-17-R-0008

Amendment 0001

Amendment 0001 is incorporated into solicitation SP3300-17-R-0008.

Amendment 0001 is being issued to answer vendor questions seen below.

Vendor Questions:

Question 1: Attachment B and C are password protected and can't be opened without password.

Do you have the password?

Answer 1: These forms are not required for proposal purposes. When a contract is issued, they are required to request construction badges for contractor personnel. Password will be provided at time of award.

Question 2: Has a contractor performed similar work to this for the government in the past?

If available, please provide the incumbent contract number.

Answer 2: This is a follow on contract. Previous contract holders are York Excavating Company -contract SP3300-12-D-0007, Rogele, Inc. - contract SP3300-12-D-0008 and Senate Builders and Construction Managers, Inc. - contract number SP3300-12-D-0009.

Question 3: If you are unable to provide a contract number, is it safe to assume this is a new requirement for the government?

Answer 3: See answer 2.

Question 4: Can I do a site visit?

Answer 4: The site visit was held as established in the solicitation, there will only be that one site visit.

Question 5: Does the guaranteed minimum of $5,000.00 apply for each yr. or only the first yr.?

Answer 5: The minimum guarantee applies to only the first year. The guaranteed minimum of $5,000.00 will be awarded within one (1) year from the date of the initial ID/IQ contract, provided the ID/IQ Contractor does not receive any task orders meeting the minimum contract guarantee during that period of time, and the contractor submits a proposal on at least forty (40) percent of the Notice of Proposed Task Order Request for Proposal Forms issued during year one.

Question 6: How many three ring binders do we need to submit for Volume I? Proposal Preparation Requirements states that Volume I needs 1EA original and 3 EA copies. Should we submit Volume I in one binder or separate binders for the original and three copies?

SP3300-17-R-0008

Amendment 0001

Answer 6: Volume I needs 4 three ring binders, 1 original and 3 copies. The original and copies should be separate binders for each Volume I.

Question 7: Task Order 0001: Please confirm that the extent of the proposed perimeter roadway is to match the limits of the existing roadway? Sheet 5 of 5, Perimeter Access Typical Section Detail, Note 2- indicates that the existing roadway widths should remain unchanged.

Answer 7: It is the intent of the design to maintain the width of the existing Perimeter Access.

Question 8: Task Order 0001: Sheet 5 of 5, Concrete Lined Swale Detail, Note 2- references specification section 32 16 13.00 10, concrete sidewalks, curbs and curbs and gutters. This section is missing from the standard specification.

Answer 8: Section 32 16 13.00 10 – Concrete Sidewalks, Curbs, and Curbs and Gutters is in the Standard Specifications, Attachment J, page 427.

All other terms and conditions remain unchanged.

Amendment 0001