(15)_Task_Order_0001_Project_Number_4032,_Drainage_Improvements_-_Eastern_Perimeter_Submittal_Registers.pdf
PDF 100 KB Posted
- Attached to
- Miscellaneous Paving and Utilities Requirements Contract Federal contract opportunity
- Solicitation number
- SP3300-17-R-0008
- Issued by
- Defense Logistics Agency Distribution
About this file
(15) Task Order 0001 Project Number 4032, Drainage Improvements - Eastern Perimeter Submittal Registers
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION OF ITEM SUBMITTED
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)
01 PS DLA Dig Permit 1.5.1 G 11 CS Salvage Plan 1.7 G
01 PS List of Contact Personnel 1.4.1.1 G
01 PS Contractor Visitor Badge Request Form (Short Form) 1.4.1.2.a.(1) G
01 PS DDSP Security Infomration Form (Long Form) 1.4.1.2.a.(1) G
01 PS Camera Pass Request Form 1.4.1.3.a G
01 PS Project Scheduler Qualifications 1.3 G 01 PS Preliminary Project Schedule 3.4.1 G 01 PS Initial Project Schedule 3.4.2 G 01 PS Periodic Schedule Update 3.4.3 G
01 PS Submittal Register 1.3 G
01 PS Accident Prevention Plan (APP) 1.7 G 06 TR Monthly Exposure Reports 1.4 06 TR Notifications and Reports 1.12 06 TR Accident Reports 1.12.2 G 06 TR LHE Inspection Reports 1.12.3 07 C Crane Operators/Riggers 1.6.1.4 07 C Standard Lift Plan 1.12.4 G 07 C Cristical Lift Plan 1.7.2.3 G 07 C Activity Hazard Analysis (AHA) 1.8 G 07 C Hot work permit 1.13.1 07 C Certificate of Compliance 1.12.4
SUBMITTAL REGISTER
Division 1 - General Requirements
CONTRACT NO:
TITLE: PRC Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna
JOB NAME: Drainage Improvements - Eastern Perimeter
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E F I C I A T I O N
S E C T I O N
S U B M I T T A L
D O C U M E
T
Y P E
S U B M I T T A L
D O C U M E
D
S C R I P T I O N
PS - PRECONSTRUCTION SUBMITTALS
SD - SHOP DRAWING
PD - PRODUCT DATA
S - SAMPLES
DD - DESIGN DATA
TR - TEST REPORTS
C - CERTIFICATES
MI - MANUFACTURER'S INSTRUCTIONS
MFR - MANUFACTURER'S FIELD
REPORTS
O&M - OPERATING AND MAINTENANCE
CS - CLOSE-OUT SUBMITTALS
P A R A G R A P H
N U M B E R
C L A S S I F I C A T I O N
G O V E R N M E N T
O R
A E
R E V I E W E R
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
REMARKSSUBMIT
APPROVAL
NEEDED BY:
MATERIAL
NEEDED
BY:
A C T I O N
C O D E
DATE OF
ACTION
D A T E
F O R W A R D E D
T O
R E V I E W E R
D A T E
R E C E I V E D
F R O M
R E V I E W E R
A C T I O N
C O D E
DATE OF
ACTION
D A T E
R E C E I V E D
F R O M
C O N T R A C T O R
D A T E
F O R W A R D E D
T O
A P P R O V I N G
A U T H O R I T Y
APPROVING AUTHORITY D
A T E
R E C E I V E D
F R O M
A P P R O V I N G
A U T H O R I T Y
D A T E
M A I L E D
T O
C O N T R A C T O R
01 11 00, Summary of Work
01 14 00, Work Restrictions
01 32 01.00 10, Project Schedule
01 33 00, Submittal Procedures
01 35 26, Government Safety Requirements
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)
SUBMITTAL REGISTER
Division 1 - General Requirements
CONTRACT NO:
TITLE: PRC Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna
JOB NAME: Drainage Improvements - Eastern Perimeter
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E F I C I A T I
C T I O N
S U B M I T T A L
D O C U M E
P E
S U B M I T T A L
D O C U M E
S C R I P T I O N
PS - PRECONSTRUCTION SUBMITTALS
SD - SHOP DRAWING
PD - PRODUCT DATA
S - SAMPLES
DD - DESIGN DATA
TR - TEST REPORTS
C - CERTIFICATES
MI - MANUFACTURER'S INSTRUCTIONS
MFR - MANUFACTURER'S FIELD
REPORTS
O&M - OPERATING AND MAINTENANCE
CS - CLOSE-OUT SUBMITTALS
P A R A G R A P H
N U M B E R
C L A S S I F I C A T I O N
G O V E R N M E N T
O R
A E
R E V I E W E R
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION
REMARKSSUBMIT
APPROVAL
NEEDED BY:
MATERIAL
NEEDED
BY:
A C T I O N
C O D E
DATE OF
ACTION
D A T E
F O R W A R D E D
T O
R E V I E W E R
D A T E
R E C E I V E D
F R O M
R E V I E W E R
A C T I O N
C O D E
DATE OF
ACTION
D A T E
R E C E I V E D
F R O M
C O N T R A C T O R
D A T E
F O R W A R D E D
T O
A P P R O V I N G
A U T H O R I T Y
APPROVING AUTHORITY D
A T E
R E C E I V E D
F R O M
A P P R O V I N G
A U T H O R I T Y
D A T E
M A I L E D
T O
C O N T R A C T O R
07 C License Certificates (Radiation) 1.14
07 C Radiography Operation Planning Worksheet 1.14.1 G
07 C Portable Gauge Operations Planning Worksheet 1.14.1 G
01 PS QC Plan 1.5 G
01 PS Dirt and Dust Control Plan 1.6.9.1 G 06 TR Solid Waste Management Report 1.10.1 G
11 CS Record Drawings (Full Size Red Line Drawings) 1.4.3.1
01 78 00, Close-Out Submittals
01 57 19, Temporary Environmental Controls
01 45 00.10 20, Quality Control for Minor Construction
4/26/2017 Page 1 of 1
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)
01 PS Existing Conditions 1.10 G 07 C Notifications 1.7 G
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E F I C I A T I
C T I O N
S U B M I T T A L
D O C U M E
P E
S U B M I T T A L
D O C U M E
S C R I P T I O N
SUBMITTAL REGISTER
Division 2 - Existing Conditions
TITLE: PRC Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna
JOB NAME: Drainage Improvements - Eastern Perimeter
CONTRACT NO:
D A T E
M A I L E D
T O
C O N T R A C T O
R REMARKS
D A T E
F O R W A R D E D
T O
R E V I E W E R
02 41 00, Demolition and Deconstruction
PS - PRECONSTRUCTION SUBMITTALS
SD - SHOP DRAWING
PD - PRODUCT DATA
S - SAMPLES
DD - DESIGN DATA
TR - TEST REPORTS
C - CERTIFICATES
MI - MANUFACTURER'S INSTRUCTIONS
MFR - MANUFACTURER'S FIELD
REPORTS
O&M - OPERATING AND MAINTENANCE
CS - CLOSE-OUT SUBMITTALS
DATE OF
ACTION
APPROVING AUTHORITY D
A T E
R E C E I V E D
F R O M
A P P R O V I N G
A U T H O R I T Y
P A R A G R A P H
N U M B E R
C L A S S I F I C A T I O N
G O V E R N M E N T
O R
A E
R E V I E W E R
CONTRACTOR
SCHEDULE DATES
CONTRA
CTOR D
A T E
R E C E I V E D
F R O M
C O N T R A C T O R
D A T E
R E C E I V E D
F R O M
R E V I E W E R
A C T I O N
C O D
ESUBMIT
APPROVAL
NEEDED BY:
MATERIAL
NEEDED
BY:
A C T I O N
C O D E
DAT
E OF
ACTI
ON
D A T E
F O R W A R D E D
T O
A P P R O V I N G
A U T H O R I
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)
03 PD Welded Wire Reinforcing 2.4 G 03 PD Wire Ties 2.4 G 03 PD Supports 2.6 G
02 SD Quality Control Plan 1.4.2 G 02 SD Laboratory Accreditation 1.4.1 02 SD Sampling Plan 3.9.2.6 G 03 PD Cementitious Materials 2.2 03 PD Chemical Admixtures 2.4 05 DD Mixture Proportions 2.1.1 G 05 DD Lightweight Aggregate Concrete 2.3.3 06 TR Mixture Proportions 2.1.1 G 06 TR Testing and Inspection For CQC 3.9 G 06 TR Fly Ash 2.2.4 06 TR Ground Granulated Balst-Furnace
(GGBF) 2.2.7
06 TR Air Content 2.1.8 06 TR Slump 2.1.9 06 TR Compressive Strength 2.1.6.1 07 C Contractor Quality Control Personnel 1.4 07 C Ready-Mix Plant 3.2.1
07 C Portland Cement 2.1.1 G 07 C Expansive Admixtures 2.1.4 G 07 C Expansive Grout 2.1.5 G 07 C Aggregates 2.1.2 G
A C T I O N
C O D E
DAT
E OF
ACTI
ON
LOCATION: Defense Distribution Center, Susquehanna JOB NAME: Drainage Improvements - Eastern Perimeter
D A T E
R E C E I V E D
F R O M
A P P R O V I N G
A U T H O R I T Y
D A T E
M A I L E D
T O
C O N T R A C T O
R REMARKS
D A T E
R E C E I V E D
F R O M
R E V I E W E R
A C T I O N
C O D E
DATE OF
ACTION
APPROVING AUTHORITY
D A T E
F O R W A R D E D
T O
R E V I E W E R
CONTRA
CTOR D
A T E
R E C E I V E D
F R O M
C O N T R A C T O R
D A T E
F O R W A R D E D
T O
A P P R O V I N G
A U T H O R I T
YSUBMIT
APPROVAL
NEEDED BY:
MATERIAL
NEEDED
BY:
CONTRACTOR:
CONTRACT NO:
TITLE: PRC Task Order Construction Services
03 62 16, Metallic Non-Shrink Grout
SUBMITTAL REGISTER
Division 3 - Concrete
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E F I C I A T I
C T I O N
S U B M I T T A L
D O C U M E
P E
S U B M I T T A L
D O C U M E
S C R I P T I O N
P A R A G R A P H
N U M B E R
C L A S S I F I C A T I O N
G O V E R N M E N T
O R
A E
R E V I E W E R
CONTRACTOR
SCHEDULE DATES
03 20 00.00 10, Concrete Reinforcing
03 30 00.00 10, Cast-In-Place Concrete
PS - PRECONSTRUCTION SUBMITTALS
SD - SHOP DRAWING
PD - PRODUCT DATA
S - SAMPLES
DD - DESIGN DATA
TR - TEST REPORTS
C - CERTIFICATES
MI - MANUFACTURER'S INSTRUCTIONS
MFR - MANUFACTURER'S FIELD
REPORTS
O&M - OPERATING AND MAINTENANCE
CS - CLOSE-OUT SUBMITTALS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)
01 PS Dewatering work plan 1.6.2 G 03 PD Buried Warning and Identification Tape 2.5 G 03 PD Temporary Barrier Fence 2.3 G
03 PD Compost Filter Sock 2.6 G 03 PD Pumped Water Filter Bag 2.9 G
31 32 11, Soil Surface Erosion Control
APPROVING AUTHORITY
P A R A G R A P H
N U M B E R
C L A S S I F I C A T I O N
G O V E R N M E N T
O R
A E
R E V I E W E R
PS - PRECONSTRUCTION SUBMITTALS
SD - SHOP DRAWING
PD - PRODUCT DATA
S - SAMPLES
DD - DESIGN DATA
TR - TEST REPORTS
C - CERTIFICATES
MI - MANUFACTURER'S INSTRUCTIONS
MFR - MANUFACTURER'S FIELD
REPORTS
O&M - OPERATING AND MAINTENANCE
CS - CLOSE-OUT SUBMITTALS
31 23 00.00 10, Trenching and Backfill
D A T E
R E C E I V E D
F R O M
A P P R O V I N G
A U T H O R I T Y
D A T E
M A I L E D
T O
C O N T R A C T O
R REMARKSSUBMIT
APPROVAL
NEEDED BY:
MATERIAL
NEEDED
BY:
A C T I O N
C O D E
DAT
E OF
ACTI
ON
D A T E
F O R W A R D E D
T O
R E V I E W E R
CONTRACTOR
SCHEDULE DATES
CONTRA
CTOR D
A T E
R E C E I V E D
F R O M
C O N T R A C T O R
D A T E
F O R W A R D E D
T O
A P P R O V I N G
A U T H O R I T Y
D A T E
R E C E I V E D
F R O M
R E V I E W E R
A C T I O N
C O D E
DATE OF
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E F I C I A T I
C T I O N
S U B M I T T A L
D O C U M E
P E
S U B M I T T A L
D O C U M E
S C R I P T I O N
SUBMITTAL REGISTER
Division 31 - Earthwork
CONTRACT NO:
TITLE: PRC Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Center, Susquehanna
JOB NAME: Drainage Improvements - Eastern Perimeter
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)
07 C Aggregates 2 G
03 PD Expansion Joint Filler 2.5 G 05 DD Concrete Mix Design 2.2 G 06 TR Field Quality Control 3.10 G 07 C Subbase 2.1 G
03 PD Mulch 2.3 G 07 C Soil Supplements 2.1 G 07 C Seed 2.2 G
APPROVING AUTHORITY
32 11 16.16 10, Subbase for Rigid and Flexible Paving
32 92 19, Seeding
32 16 13.00 10, Concrete Sidewalks, Curbs, and Gutters
P A R A G R A P H
N U M B E R
C L A S S I F I C A T I O N
G O V E R N M E N T
O R
A E
R E V I E W E R
PS - PRECONSTRUCTION SUBMITTALS
SD - SHOP DRAWING
PD - PRODUCT DATA
S - SAMPLES
DD - DESIGN DATA
TR - TEST REPORTS
C - CERTIFICATES
MI - MANUFACTURER'S INSTRUCTIONS
MFR - MANUFACTURER'S FIELD
REPORTS
O&M - OPERATING AND MAINTENANCE
CS - CLOSE-OUT SUBMITTALS
D A T E
R E C E I V E D
F R O M
A P P R O V I N G
A U T H O R I T Y
D A T E
M A I L E D
T O
C O N T R A C T O
R REMARKSSUBMIT
APPROVAL
NEEDED BY:
MATERIAL
NEEDED
BY:
A C T I O N
C O D E
DAT
E OF
ACTI
ON
D A T E
F O R W A R D E D
T O
R E V I E W E R
CONTRACTOR
SCHEDULE DATES
CONTRA
CTOR D
A T E
R E C E I V E D
F R O M
C O N T R A C T O R
D A T E
F O R W A R D E D
T O
A P P R O V I N G
A U T H O R I T Y
D A T E
R E C E I V E D
F R O M
R E V I E W E R
A C T I O N
C O D E
DATE OF
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E F I C I A T I
C T I O N
S U B M I T T A L
D O C U M E
P E
S U B M I T T A L
D O C U M E
S C R I P T I O N
SUBMITTAL REGISTER
Division 32 - Exterior Improvements
CONTRACT NO:
TITLE: PRC Task Order Construction Services
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2) (r)
03 PD Pipe 2.1 G 03 PD Structures 2.2 G
P A R A G R A P H
N U M B E R
C L A S S I F I C A T I O N
G O V E R N M E N T
O R
A E
R E V I E W E R
PS - PRECONSTRUCTION SUBMITTALS
SD - SHOP DRAWING
PD - PRODUCT DATA
S - SAMPLES
DD - DESIGN DATA
TR - TEST REPORTS
C - CERTIFICATES
MI - MANUFACTURER'S INSTRUCTIONS
MFR - MANUFACTURER'S FIELD
REPORTS
O&M - OPERATING AND MAINTENANCE
CS - CLOSE-OUT SUBMITTALS
33 40 00, Storm Drainage Utilities
D A T E
R E C E I V E D
F R O M
R E V I E W E R
D A T E
R E C E I V E D
F R O M
A P P R O V I N G
A U T H O R I T Y
D A T E
M A I L E D
T O
C O N T R A C T O
R REMARKSSUBMIT
APPROVAL
NEEDED BY:
MATERIAL
NEEDED
BY:
A C T I O N
C O D E
DAT
E OF
ACTI
ON
D A T E
F O R W A R D E D
T O
R E V I E W E R
CONTRACTOR
SCHEDULE DATES
CONTRA
CTOR D
A T E
R E C E I V E D
F R O M
C O N T R A C T O R
D A T E
F O R W A R D E D
T O
A P P R O V I N G
A U T H O R I T Y
APPROVING AUTHORITY
A C T I O N
C O D E
DATE OF
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E F I C I A T I
C T I O N
S U B M I T T A L
D O C U M E
P E
S U B M I T T A L
D O C U M E
S C R I P T I O N
SUBMITTAL REGISTER
Division 33 - Utilities
CONTRACT NO:
TITLE: PRC Task Order Construction Services
| TOC 2018, Submittal Register, Division 1 |
| Submittal Register |
| TOC 2018, Submittal Register, Division 2 |
| Submittal Register |
| TOC 2018, Submittal Register, Division 3 |
| Submittal Register |
| TOC 2018, Submittal Register, Division 31 |
| Submittal Register |
| TOC 2018, Submittal Register, Division 32 |
| Submittal Register |
| TOC 2018, Submittal Register, Division 33 |
| Submittal Register |
File details come from the government source that posted it. Updated .