Attachment_7-_IH_QASP.pdf
PDF 226 KB Posted
- Attached to
- Industrial Hygiene (IH) and Ergonomic Program Support Services for DLA Distribution San Joaquin, CA (DDJC)
- Solicitation number
- SP3300-17-Q-0060
- Issued by
-
Defense Logistics Agency Distribution
About this file
Attachment 7- IH QASP
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 7
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Industrial Hygiene Services at
Defense Logistics Agency Distribution San Joaquin California
A. The Quality Assurance Surveillance Plan (QASP) is the Government’s plan to ensure the Contractor provides the required support services, and adheres to the quality standards as specified in the Performance Work Statement (PWS). Both the Contractor and the Government will agree to the terms of the contract. During the life of the contract, administrative procedures such as inspections, documentation and retention of records, which reflect the Contractor’s performance, will be retained.
B. The Contractor shall also maintain all records of performance for a minimum of six (6) months after the completion of this contact.
C. The Contracting Officer’s Representative (COR) will monitor performance to ensure services are received and carried out in accordance with the standards set forth in the PWS. This monitoring shall be done via Government inspection and review of the various reports and documentation generated in performance of the support requirements. This QASP will be used to monitor compliance with contract terms and conditions, identify nonconforming services to determine appropriate action. This plan sets forth the method and manner by which the Government intends to conduct surveillance of work under the contract, and is subject to the unilateral change by the Government without modification of the contract. All work required by the contract is subject to surveillance whether or not specifically included in the plan. When the Contractor performance fails to achieve the acceptable performance standards and is clearly the fault of the Contractor, the COR will prepare a Contract Discrepancy Report (CDR) and forward it to the Contracting Officer (KO) to issue to the Contractor. In response to the CDR, the Contractor shall explain within seven working days, in writing, why performance was unacceptable, how performance will be returned to acceptable standards and how recurrence of the problem will be prevented in the future. The KO will evaluate the Contractor’s explanation and determine the appropriate action(s).
1. Inspections: The COR is responsible for technical oversight of the Contractor’s performance. The COR’s duties shall include, but are not limited to, assurance of the completion of work in a quality manner, resolution of quality concerns, and payment for services rendered. This responsibility includes the determination of adequacy of services performed by the contractor in accordance with the terms and conditions of the contract. The COR will perform inspections on behalf of the Government and will confer with the Contractor regarding any problems encountered in the performance of the work.
2. Deficiencies: Once an inspection has been conducted, the Contractor and KO will be notified via electronic mail of its results. Inspections will be documented on a pass/fail basis. When a failed inspection occurs, the Contractor shall be allowed the time to correct all noted deficiencies. The Contractor should resolve the deficiencies as documented by the COR in the failed inspection report. The COR will perform a re-inspection and further assess the area or item of concern once again on a pass/fail basis.
SP3300-17-Q-0060
3. Re-Performance of Work: When the Contractor re-performs services as a result of the inspections defined in this section, and the Contractor does not meet the standards identified in the PWS, the Government may desire that the work be re-performed prior to the completion of the contract. If this is the case, the Contractor shall perform the service at no additional cost to the Government.
4. Performance Measures. Performance Measures will be assessed on a Pass and Fail Grading System as defined below:
Rating Definitions Pass When performance complies with the PWS Fail When performance does not comply with the PWS
D. Method of Surveillance. There are various surveillance methods used to monitor contract performance and compliance. When selecting the appropriate method, the COR will take into consideration task criticality, task complexity, time availability, and mission requirements. The following methods of surveillance will be used to assess contract performance under this contract:
1. Periodic Surveillance (daily, weekly, monthly, quarterly, etc.) of Contractor performance, reports and other deliverable documentation will be conducted by the COR. The COR will determine the frequency necessary to ensure the Contractor’s performance and work product complies with the standards set forth in the PWS.
2. Customer Complaints will be used by the COR to evaluate Contractor performance. Upon receipt of a customer complaint, the COR will conduct an investigation to validate the complaint and to confirm whether the Contractor’s reported performance constituted a discrepancy.
DI. Procedures. The COR will perform inspections to ensure Contractor compliance with the appropriate paragraphs in the PWS, other government requirements, and the Contractor’s own procedures, and will record the results of the inspections, noting the date and time. If inspection indicates a performance standard is not met, the KO will notify the Contractor of the deficiency for correction. The Contractor will be given a reasonable time after notification to correct the unacceptable performance. The length of time allowed to correct the problem will depend upon the requirement, complexity of corrective action(s) and the deficiency. The Contractor will notify the KO if the time allowed for correction is not adequate. The COR will not consider the correction action(s) until all deficiencies have been corrected and determined by the COR to be adequate (Government follow-up). Contractor non-responsiveness, deficiencies not adequately addressed or corrected after notification of such, or estimated dates of completion that are not acceptable to the COR will be forwarded to the KO for action.
DII. The chart below provides timely and quality performance standards for specific requirements already stated in the PWS:
TIMELINESS AND QUALITY
PWS
Paragraph Reference
Performance Objective
Performance Standard
Method of Surveillance
1.1.A IH support services Contractor provides the IH personnel required to perform the tasks identified in the PWS.
COR
surveillance
Customer complaints
5.1.B. Meetings Contractor medical personnel meets with COR weekly.
COR
surveillance
5.1.A. Scheduling IH services Contractor contacts COR service requested surveillance within 1 workday of the request. Customer complaints
5.1.B. Meetings Contractor IH personnel attend meetings as specified in the
PWS.
COR
surveillance
5.2.1.A. Emergent IH Support Contractor provides IH support for emergent issues and provides written report within the time specified in the
PWS.
COR
surveillance
Customer complaints
5.2.1.C. Asbestos Contractor provides asbestos consultation support as specified in the
PWS.
COR
surveillance
Customer complaints
5.2.1.H IH based Employee Contractor COR Complaints investigates surveillance
Government personnel Customer complaints within complaints 1 workday of receipt.
5.2.2 IH Implementation Contractor COR
Plan submits and surveillance implements the plan within 30 Customer calendar days complaints after contract award.
5.2.3 IH Training Contractor
conducts IH training as specified in the PWS.
COR
surveillance
Customer complaints
5.2.4.C. Respirator Protection Contractor administers the respirator protection program as specified in the
PWS.
COR
Program surveillance
Customer complaints
5.2.4.D. Personal Protective Contractor COR Equipment (PPE) evaluates work surveillance Program site operations, provides Customer recommendations complaints for operational changes and/or
PPE.
5.2.4.E. Confined Space Contractor COR Program administers the surveillance confined space program IAW Customer regulatory complaints requirements.
5.2.4.F. Hearing Contractor COR Conservation administers the surveillance Program hearing conservation Customer program IAW complaints regulatory requirements.
5.2.C-6.F Customer Service Contractor consistently meets customer/co-worker expectations
COR
Surveillance
Customer complaints
ATTACHMENT 7
File details come from the government source that posted it. Updated .