AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
SP3300-16-R-0028
Amendment 0004
1. The purpose of Amendment 0004 is to answer vendor questions, incorporate a Revised Technical
Specification Dated January 3, 2017 (Attachment 1), and extending the deadline for proposals to January
9, 2017 1:00 PM EST.
Question 1:
I am checking back on drawing SPP16B5-1. This drawing is identified in the bid documents, however was not included with any of the information we received from your office to date. Please send this drawing today.
Answer 1:
Drawing SPP16B5-1 is referenced in error. This is a reference from a previous project. Please disregard that drawing reference.
The quantity/location of the new cameras is not predetermined for this spec. The contractor is required to provide cameras sufficient to cover the replaced conveyor paths. The exact locations will be a joint determination with the contractor and COR after award.
The first sentence of Paragraph 3.12 should read as follows: "The Contractor shall provide a Video Monitoring System for real time monitoring of the operations along the entire length of the replaced conveyor." The portion of the sentence that reads "of the elevated section" should be removed.
Please see ATTACHMENT 1 – revised Technical Specification Dated January 3, 2017.
2. Due to the late posting of Amendment 0004, Vendors who have already mailed their proposals for this effort are required to email the contract specialist at mogen.gilson@dla.mil acknowledging Amendment
0004. The proposals themselves cannot be emailed.
3. All other terms and conditions remain unchanged.
END OF AMENDMENT 0004
mailto:mogen.gilson@dla.mil
| Amend 0004 SP330016R0028 page 1 |
| SP3300-15-R-5004 0003 page 1 |
Amend 0004 Page 2 -
| IDCode: |
| Page: 1 |
| Pages: 2 |
| Text4: AMENDMENT/MODIFICATION NO. |
| AmendNo: 0004 |
| ReqNo: |
| ProjNo: |
| IssCode: SP3300 |
| IssuedBy: DLA Distribution |
Acquisition Operations, J-7 J Avenue, Bldg 404 New Cumberland, PA 17070
| AdmCode: MPGADM |
| AdminBy: POC: Mogen Gilson |
717-770-4757 (P)
MOGEN.GILSON@DLA.MIL
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolChgYs: Yes |
| SolChgNo: Off |
| SolAmdNo: SP3300-16-R-0028 |
| AmendDate: 07/1/16 |
| ModNo: |
| ModDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Yes |
| OffrNoEx: Off |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: |
SEE CONTINUATION PAGE(S)
| SignName: |
| SignTitl: |
| ContDate: |
| CoName: |
| CoTitle: |
| CODate: |
| Text1: January 3, 2017 |
| Text2: |
| Text3: |
File details come from the government source that posted it. Updated .