ATTACHMENT 3 - SUBMITTAL REGISTERS

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION OF ITEM SUBMITTED

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2)

01 PS Construction Sequence 1 G

01 PS List of Contact Personnel 8 G

01 PS Project Schedule 4 G

01 PS Submittal Register 3 G

01 PS Accident Prevention Plan (APP) 2 G 01 PS Activity Hazard Analysis (AHA) 2 G 07 C Certificate of Compliance 2 G 07 C License Certificates 2

01 PS QC Plan 2 G

02 PS Construction Site Plan 7 G 02 PS Traffic Control Plans 7 G

01 PS Performance Bond 3 G 03 PD As-Built Record of Equipment and Materials 3 G 03 PD Final Approved Shop Drawings 3 03 PD Warranty Management Plan 3 G 03 PD Warranty Tags 3 03 PD Spare Parts Data 3 08 MI Manufacturer's Instructions 3 10 O&M Operation and Maintenance Manuals 3 11 CS List of Installed Equipment 3 G 11 CS Interim Form DD1354 3 G 11 CS Checklist for Form DD1354 3 G

SUBMIT

APPROVAL

NEEDED

BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DAT

E OF

ACTI

ON

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY D

A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRA

CTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I O N

S E C T I O N

S U B M I T T A L

D O C U M E

T

Y P E

S U B M I T T A L

D O C U M E

D

S C R I P T I O N

SUBMITTAL REGISTER CONTRACT NO:

TITLE: Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Center, San Joaquin, Tracy Depot, Warehouse 57 and 56

JOB NAME: Upgrade/Install Motorized Door Hardware

26 20 00 Interior Distribution DIVISION 26 - Electrical

Division 1 - General Requirements 01 11 00, Summary of Work

01 14 00, Work Restrictions

01 78 00, Close-Out Submittals

01 50 00, Temporary Construction Facilities and Controls

01 32 01.00 10, Project Schedule

01 33 00, Submittal Procedures

01 35 26, Government Safety Requirements

01 45 00.10 20, Quality Control for Minor Construction

SP330016Q0164

ATTACHMENT-3

SUBMITTAL REGISTERS

DESCRIPTION OF ITEM SUBMITTED

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2)

SUBMIT

APPROVAL

NEEDED

BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DAT

E OF

ACTI

ON

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY D

A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRA

CTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I O

S

C T I O N

S U B M I T T A L

D O C U M E

Y P E

S U B M I T T A L

D O C U M E

D

S C R I P T I O N

SUBMITTAL REGISTER CONTRACT NO:

TITLE: Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Center, San Joaquin, Tracy Depot, Warehouse 57 and 56

JOB NAME: Upgrade/Install Motorized Door Hardware

03 SD Conduit and Fittings 1.2.f G 03 SD Wires and Cables 1.2.f G

03 SD Circuit Breakers 1.2.f G 26 28 00.00 10 MCCs, Switchboards, Panels

SP330016Q0164

ATTACHMENT-3

SUBMITTAL REGISTERS