ATTACHMENT_7_-Project_Submittal_Registers _Combined.pdf

PDF 592 KB Posted

Attached to
Z2--Other Warehouse Buildings, REPAIR OR
Solicitation number
SP330016B0016
Issued by

About this file

ATTACHMENT 7 - SUBMITTAL REGISTER

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORM Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE OF PAGES

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Paint Exteriors of Warehouses 14, 15, 17 and 18

01 11 00 Submittals Quality Control Plan 3.0 G Hazard Analysis 3.0 G Safety/Health Plan 3.0 G

1 6

ATTACHMENT 7

SP330016B0016

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Paint Exteriors of Warehouses 14, 15, 17 and 18

01 57 20.00 10 Submittals DLA Environmental Management 14

Data Call

2 6

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Paint Exteriors of Warehouses 14, 15, 17 and 18

02 83 13 Submittals SD-01 Preconstruction Submittals Lead Compliance Plan including 1.4 G CP approval

Competent Person qualifications 1.4 G Training Certification of workers 1.4 and supervisors Lead waste management plan 1.4 Written evidence that TSD is 1.4 approved for lead disposal Certification of Medical Exami- 1.4 nations Accident Prevention Plan (APP) 1.4 G Activity Hazard Analyses 1.4 G

SD-06 Test Reports Sampling results 1.4 Occupational and Environmental 1.4

Assessment Data Report

SD-07 Certificates Licenses, permits and notifications 1.4 Testing laboratory qualifications 1.4 Clearance Certification 1.4 G

3 6

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Paint Exteriors of Warehouses 14, 15, 17 and 18

02 83 13 Submittals (continued) SD-11 Closeout Submittals Completed and signed hazardous 1.4 waste manifest from treatment or disposal facility

Waste turn-in documents or weight 1.4 ticket for non-hazardous wastes that are disposed of at sanitary or construction and demolition landfills

4 6

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Paint Exteriors of Warehouses 14, 15, 17 and 18

07 92 00 Submittals SD-03 Product Data 1.2 G Sealants Primers Bond breakers Backstops Manufacturer's descriptive data including storage requirements, shelf life, curing time, instructions for mixing and application, and primer data (if required). Provide a copy of the Material Safety Data Sheet for each solvent, primer or sealant material.

SD-07 Certificates 1.2 G Sealant Certificates of compliance stating that the materials conform to the specified requirements

5 6

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Paint Exteriors of Warehouses 14, 15, 17 and 18

09 90 00 Submittals SD-03 Product Data Certification 1.2 Environmental Data 1.2 Materials 1.2 Coating 1.2 G

SD-04 Samples Color 1.2 G

SD-07 Certificates Applicator's qualifications 1.2 Qualification Testing laboratory for 1.2 G coatings

SD-08 Manufacturer's Instructions Application instructions 1.2 Mixing 1.2 Manufacturer's Material Safety 1.2

Data Sheets

SD-10 Operation and Maintenance Data

Coatings 1.2 G

6 6