Amendment 0002.pdf

PDF 173 KB Posted

Attached to
Panel Saw for Defense Distribution Center Tobyhanna Federal contract opportunity
Solicitation number
SP330010Q0074
Issued by
Defense Logistics Agency Distribution

About this file

AMENDMENT 0002

View the file

Other files for this federal contract opportunity

Other files attached to Panel Saw for Defense Distribution Center Tobyhanna, newest first.
File Type Posted
AMENDMENT 0001.pdf PDF
Final SOW.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00002

PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

-::6-,I"'SS"'U.,.,E"'O,.,B"'Y;---------~---......,CO"';D"'Er--+-S-P-3-1-0-0------+7"-."A"'O::t"MrrIN"'I""ST'"E"'R"'W""BvY-'(I"'fo:"Cr"'he"'r:-:thLa:"Cn"r7:re"'m:"C6"')----'==--...,--------

Defense Distribution Center f D:JC·AB Bryan Nice, 717-770 4485 c- 000

X 9A. AMENDMENT OF SOLICIATION NS. NAME AND ADDRESS OF CONTRACTOR :tVo, street, county, State and ZIP Code)

1><1 SP3300-10-Q-0074

[9B.DATED (SEE/TEM 11) .--------

Apr 5, 2010 lOA. MOOIFICATI N OF ""CO"'N"'T""R"'A""'CT""/""O"'RD"'E""R'"'N""O"".---

D lOB. DATED (S E ITEM 13)

CODE

11.

IE] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers o is extended, IE] is not extended.

Oflers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and: 5, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Of (c) By separate letter or tele9ram which ncludes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE

DESIGNATED FOR THE RECEIPT OF OfFE% PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer each telegram or letter makes reference to the 50~icitation and this

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE 'A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specliyauthority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, ) SET FORTh IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.1 03(b).

NO.IN ITE.\1101\.

oporopno'!On dote, ele

THIS SUPPLEMENT,\L AGREEMENT IS ENTERED INTO PURSUANTTO AUTHORITY OF:

E.IMPORTANT: Contractor [] is not, is required to sign this document and return ____ copies to the issuing office, 0

SEE CONTINUAT:ON SHEET

Except as provided herein, a,1 terms and condit;ons of the document referenced In Item 9A or lOA, as heretofore changed, remains unchanged and in full force and effect

15A. NAME AND TITLE OF SIGNER (Type or prinrj 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

_l_SB_._C_O_N_T_RA_C"'T..,O-:-R"'IO....F."F...,ER"t'Q,..R=======.,..-_____ 115c DATE SIGNED

;S'gr:aw(t' ofperson aulhori22d 10 sign)

16B. UNITED STATES OF AMERICA

(Signature of 'v.."",,, ',j Officer)

16C. DATE SIGNED

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

Amendment 0002

SP330-1 0-0-0074

1. Amendment 0002 is hereby incorporated into Request for Ouote (RFO) number SP3300-10-0-0074 and shall become a part of any resultant contract.

2. The following is a response to contractor submitted questions:

QUESTION 1 We would like to know the nature of the material. Plastic, Wood, Non-Ferrous metal?

What are the thickness and dimensions of the material to be cut? This will help provide the correct saw blades to be included.

ANSWER 1 - The Material DDTP uses on this saw is WOOD. Plywood Sheets are used, 48" X 96";

3/8",1/4" 1/2" and 3/4".

QUESTION 2 - Is the Optilift that is being refered to, a loading or unloading devise. If its a loading devise, would they consider a proper, self loading machine, in a rear loading saw? This would be a far more effective solution. If its for off loading what are the smallest and largest pieces to be unloaded?

ANSWER 2 OPTILIFT is not needed and has been removed from the Statement of Work.

QUESTION 3 - I have a question regarding the description of requirement where it states to include machinist grout to grout in saw and optilift after installation. Can you find out what they are looking for there?

ANSWER 3 - It is a leveling compound used to level the machine if the floor is uneven. The statement of work has been revised to read that contractors shall insure that the saw is installed level and secure.

3. The Statement of Work (SOW) is replaced with the attached revised SOW dated May 6,2010 and shall become a part of any resultant contract.

4. The closing date for submission of offers will remain as MAY 13, 2010, 3:30 PM EST.

Revised May 6, 2010 Attachment 1

STATEMENT OF WORK (SOW)

Place of Performance: Defense Distribution Center Tobyhanna Bldg .55, Bay 3 Tobyhanna, PA 18466

Must be equivalent to or greater than the Salient Characteristics of the HOLZMA Panel saw model #HHP 380-3100 listed in the description below.

DESCRIPTION OF REQUIREMENT:

Contract Line Item (CLIN) 0001: Contractor shall provide all labor, material equipment and supervision necessary to provide and install (l) Each Panel Saw, Holzma Mode HPP 380-3100 (or Equal), as turnkey installation to include: CADPlan JIT software (or equal); six (6) main saw blades; six (6) scoring saw blades; one week additional on-site traimng provided for government personnel; two (2) sets manuals in hard copy format; on-site installation.

Contractor shall insure the saw is installed level and secured to the floor. All rigging to remove and install the saw shall be supplied by the contractor. The saw shall come with a standard manufacturer's warranty not less than one

(1) year.

SALIENT FEATURES:

1. 28 horsepower main saw motor;

2. 3 horsepower scoring saw motor;

3, 3,9 inch 111J x. opening of clamps;

4. 3.7 inch max. projection of main saw blade;

5. 0.426 feet/min. saw carriage speed in the forward direction;

6. 426 feet/min. saw carriage speed in reverse direction;

7. 262 feet/min. program fence speed forward and reverse direction.

I. Computer

a. Industrial PC, Intel P-4 2.66 GHz processor;

b. 512 DDR RAM working memory;

c. 40 GB Hard Drive;

d. 1.44 MB 3.5inch floppy disc drive;

e. DVD ROM Drive;

f. A TI Radeoll 9700 video graphics card;

g. 4 serial interfaces;

h. 1 parallel interface;

i. 1 Ethernet interface;

.I. 1 PCMCIA slot;

k. 17inch flat screen LCD color monitor with Touch Screen;

I. Keyboard connectioll.

2. PC to provide real-time machine control;

3. 3D graphics;

4. Personalized operator control settings.

!;rrOr DiagnostlcsiJ2:l!:LQJ the Cadmatic 4.0 control system);

, 1. Errors displayed in plain text;

2. Cadmatic 4.0 maintains file for the last 15 errors to occur on the machine;

Revised May 6, 2010 Attachment 1

Steps to correct the error are displayed on the monitor;

4.Photos and videos displayed to show actual location of the error;
5.Modem hardware for remote diagnostics;
6.Maintenance display and tracking prompts operator when saw needs maintenance and tracks dates when

maintenance is/was performed.

1.Steel construction;
2.Monorail guide system constructed of chromed and hardened steel guide rods and V-groove rollers;
3.Automatic continuous cutting length adjustment;
4.Automatic continuous cutting length;
5.Cutting speed is variably adjustable from the control panel;
6.Drive is by way of AC servomotor and rack and pinion.
1.Rear support table with narrow pitch rollers;
2.Air tables at the front of the machine;
3.Machine bed has friction-free plates over the surface;
4.Cuttmg length is 122 inches;
5.CUlting width is 122 inches;
6.6 clamps located at 3inch, l1i11ch, 19inch, 4 linch, 73inch, and 104inch;
7.3 air tables (B5inchx 25 Y2 inch);

8.

9.6inch dust collection connector on pressure beam;
10.8inch dust collection cormector on saw carriage.

File details come from the government source that posted it. Updated .