AMENDMENT 0001.pdf
PDF 146 KB Posted
- Attached to
- Panel Saw for Defense Distribution Center Tobyhanna Federal contract opportunity
- Solicitation number
- SP330010Q0074
- Issued by
- Defense Logistics Agency Distribution
About this file
AMENDMENT 00001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Final SOW.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11, CONTRACT ID CODE PAGESIPAGEl OFAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
2, AMENDMENT/MODIFICAITON NO 3, EFFECTIVE DATE 4, KEQUI~IIION!PURCHASE REQ, NO, 10' PROJECT NO, (It applicb,e)
00001 May 3 f 010 6, ISSUED BY CODE SP3100 7, ADMINISTERED BY (If other than Item 6) CODE I Defense Distribution Center Acquisition Operations, DDC-AB Bryan Nice, 717-770-4485- }1.venue, Building 404 New Cumberland, FA 17070-5000 w
9A, AMENDI'\llENT OF SOLICIATION NO,8, NA.'~;: A"D ADDRESS OF CON"ACTCR (No" street. county, State and ZIP Code) (Xl t-
SP3300- 0-Q-0074~ 9B, DATED (SEE ITEM 11)
Apr 5, 2010 lOA MODIFICATION OF CONTRACT10RDER NO.
D lOB. DATED (SEE ITEM 13)
CODE IFACILITY CODE
11. . T APPLlt:::, I U :N I::' Ut- ::'ULll.l A IIU N::'
IE] The above n"mbered solicitat;on is amended as set forth in Item 14. The hour and date specified forreceipt of Offers IE] is extended, 0 is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing iteMs 8 and 15. and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy althe offer submitted;
or (c) By sepa'ate letter or te:egram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFi'ERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER If by virtue of this amendment your desire to change an offer
~~e:~d'~~g\:,~t~ad(s5r~~~i~~~n8cTo':'tci t~;r, '6'~~~i ~~ i,eJ~? ~an'd ~~\~t~preBH;,~ded each telegram or letter makes reference to the solicitation and this
12, ACCOUNTING AND APPROPIRATION DATi'. (If requirea)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANTTO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER n NO. IN ITEM lOA, THE ABOVE NUMBERED CONTRACTIORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES :such as [Ilanges in paying office, appropriatio;, date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43,1 03(b), THIS SUPPLEMENT,\L AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
OTHER ISpecirj type 01 modification and authority)
E.IMPORTANT: Contractor C is not, 0 is required to sign this document and return copies to the issuing office, 14, DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including soUcltotiankontroet subject matter where feasibleJ
SEE CONTINUATION SHEET
Except as provided herein, all terms and conditio,15 of the document referenced in Item 9A or lOA, as heretofore changed, remains unchanged and in full force and effect
15A, NAME AND TITLE OF SIGNER (Type or print) 16A, NAME AND TITl E OF CONTRACTING OFFiCER (Type or print)
15B, CONTRACTOR/OFFEROii
(Signoture ofperson authorized to sign)
15(, DATE SIGNED 166, UNITED STATES OF AMERICA
(Signature at, .. ;l0ftieer)
16C DATE SIGNED
NSN 7540-01-'152,8070 STANDARD FORM 30 (REV, 10-83)
Previous edition unusable Prescribed by GSA FAR (48 CFR) 53,243
Amendment 0001
SP330-1 0-0-0074
1. Amendment 0001 is hereby incorporated into Request for Ouote (RFO) number SP3300-1 0-0-0074 and shall become a part of any resultant contract.
2. Statement of Work (SOW) is revised to remove Holzma Model HEE 33/16 or equal. Panel Saw shall include the saw and a rear support table, the automatic rear feed table is not needed. Revised SOW is attached.
3. The closing date for submission of quotes has been extended to MAY 13, 2010, 3:30 PM EST.
Revised May 3,2010 Attachment 1
STATEMENT OF WORK (SOW)
Place of Perform~1llce: D<:tense Distribution Center Tobyhanna L3 T
Must be equivalent to or greater than the Salient Characteristics of the HOLZMA Panel saw model #HHP 380-3100 listed in the dl'suiptioll below.
DESCIUPTIOl\ OF
Contract Line ltem (CLlN) OUO 1: Pn)vlde and Install (I) Each Panel Saw, Holzma Mode HPP 380-3100 (or Equal), as turnkey instal1at1011 to include CADPlan HT software (or equal); six (6) main saw blades; six (6) scoring saw blades; one week 3dditional on-site provided for government personnel; two (2) sets manuals in hard copy format on-site instiJllation, to mclude 1TI3chinist grout to grout in saw and optilift after installation; rigging;
and ulle (I ) yC~H lllJllut~lclmer warranty.
SALIENT FI::.ATlIU.S
1.
2.
3,
4. 3.7inch max oj" 111[] in S3W blade;
5. 0.426 fccl.l11l!l. in the forward direction;
6. 426 feefill1ill. sa\\ C~\l in reverse direction;
7. 262 feet mill prugL!l11 knee forward and reverse direction.
l.
a, Industrial PC Intel P-4 2.66 GHz processor;
b. 512 DDR RA\;l memory;
c. 40 (jB I'lard Drive:
d. I ,14 \1B me It disc drive;
[)\ RU\\ Dm
L AI I Ratieoll (nOO \'ideo graphics carel:
() 4 $c'rial m1erfaces:
11 II11crfacc:
I. [themet Illtl'ridCl':
I'CMCI!\ "in\:
k ILl! S~IIt'CII I en color monitor with TOLlch Screen;
COll i,el,'lI () 11.
2. rcal-tillll' l11<lcilillC control;
4. Perso118ii;,cd c()l~lml
I. Errors 1I1 text;
2. Cadmalic 4J) rmintllins rile for the last 15 errors to occm on the machine;
3. Steps to correct tile crwi l~rc' dispbyed on the monitor;
4. Photos and videos to sho\V actual locatIon of the error;
Revised May 3, 2010
Attachment 1
5, 6, l'vlmlltl'1l311Cl' prompts operator when saw needs maintenance and tracks dates when mallllcnancc \\ \\ a~
1, Steel construction;
2, Monorail guide system constructed of chromed and hardened steel guide rods and V-groove rollers;
], Automatic COl1tlllllt1U., culU]:", adjustment;
4, I'" i'Lhtahlc hom the control
6. 'CI,'\:lllUlUf and rack and pinion.
I, Rear slIppnrtlablc \\ ilh narru\\ pilch rollers;
2. .i~ir tahles :l1l' i'ro:"d oJ' lb-.:
~ ~VIZlcllin~ b'.:d ha'l {~"i.:t1u!:. pi:lles over the surface;
4, Cutlmg 122 ir:,'1
5, Ille'h,,'s,
6. located dl inch, i lll1Ch, 19inch,41inch. 73inch, and 104inch;
7, air tables (8Smch\ 25· Inch):
8, 480V/
9, 6inch dust COlieCI!On (o:medol on pressure beam;
10, 8inch dust collcctlun 'CUI 111\;', 101 011 saw caniage,
File details come from the government source that posted it. Updated .