SP330010B5010 Amendment 0002.pdf

PDF 197 KB Posted

Attached to
Upgrade Car Wash Building 749, Defense Distribution Depot Susquehanna PA (DDSP), New Cumberland PA 17070
Solicitation number
SP3300-10-B-5010
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
ITEMS DISCUSSED AT THE PREPROPOSAL CONFERENCE.pdf PDF
Site Visit Attendance Sheet.pdf PDF
3704-Specifications-06012010.pdf PDF
SP330010B5010 Amendment 0001.pdf PDF
3704-Specifications-06012010.pdf PDF
3704-Submittal Registers-06032010.pdf PDF
SF25A —
SP330010B5010.pdf PDF
SF25 —
Security Attachments A through E.pdf PDF
3704-Drawings-06032010.pdf PDF
SF24 - Bid Bond.pdf PDF
Davis Bacon Wage Determination.htm HTM file
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

SP3300-10-B-5010

Amendment 0002

Amendment 0002 is hereby incorporated into solicitation SP3300-10-B-5010 and shall become part of any resulting contract.

Amendment 0002 is being issued to answer vendor questions.

Question 1: The drawings that are uploaded to fbo.gov are not aligned correctly. ½ of the page is cut off.

Answer 1: The drawings are aligned properly and pdf file is correct. The car wash bays (Rooms 102 and

103) are annexed to an existing building. The new mechanical room (Room 101) will be built inside the existing building and in the drawings is shown as part of the existing building and not the entire area of it.

Question 2: What trade is responsible for the new concrete catch basin?

Answer 2: The Government cannot tell a contractor what trade to use. Be advised that the Davis Bacon Act applies. Labor categories and wage rates are included in the applicable wage determination. It is the contractor’s responsibility to determine the appropriate labor category for the type of work being performed.

Question 3: Who supplies the low and high pressure piping and pumps?

Answer 3: All equipment and material required for this requirement is supplied by the contractor.

Question 4: Who provides the following equipment for the carwash?

A. High Pressure System B. Low Pressure System C. Control Panel D. Weep Miser E. Air Compressor

Answer 4: See Answer #3 above.

Question 5: I’m looking through the spec and the drawings and cannot find anything on the roof other than the decking. The drawing shows built-up roof deck but makes no mention of any rubber nor does it say anything about any kind of metal roof system. Could we please have some clarification on the type of roof system they want?

Answer 5: There is no mention of any roofing on this project. The mechanical room is receiving a metal decking only. The mechanical room is under the existing roof. Details of the roof for the mechanical room are shown on drawing No. A-301.

All other terms and conditions remain unchanged.

END OF AMENDMENT 0002

ADP21A.tmp
Question 29: Drawing Sheet 7 Building 1
Statement – Question
Question 30: Drawing Sheet 7 Building 1 Zone 2, Zone 3, and Zone 5
ADP10.tmp
Question 29: Drawing Sheet 7 Building 1
Statement – Question
Question 30: Drawing Sheet 7 Building 1 Zone 2, Zone 3, and Zone 5
ADP1D.tmp
Question 29: Drawing Sheet 7 Building 1
Statement – Question
Question 30: Drawing Sheet 7 Building 1 Zone 2, Zone 3, and Zone 5
IDCode:
Page: 1
Pages: 2
AmendNo: 0002
EffDate: 23 JUL 2010
ReqNo:
ProjNo:
IssCode: SP3300
IssuedBy: DEFENSE DISTRIBUTION CENTER

ACQUISITION OPERATION DDC J7-AB

J AVENUE BUILDING 404

NEW CUMBERLAND PA 17070-5001

AdmCode: DAKADM
AdminBy: DONNA KAUTZ

717-770-6563 FX 717-770-7591

donna.kautz@dla.mil

ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolAmdNo: SP3300-10-B-5010
AmendDate: 30 JUN 2010
ModNo:
ModDate: 05 JUL 20
NoCopies: 1
Amended: Yes
ApprData:
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript: See Page 2.
SignName:
SignTitl:
ContDate:
CoName:
CoTitle:
CODate:
SolChgYs: Yes
SolChgNo: Off
OffrExt: Off
OffrNoEx: No
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off

File details come from the government source that posted it. Updated .