3704-Submittal Registers-06032010.pdf

PDF 94 KB Posted

Attached to
Upgrade Car Wash Building 749, Defense Distribution Depot Susquehanna PA (DDSP), New Cumberland PA 17070
Solicitation number
SP3300-10-B-5010
Issued by

About this file

Submittal Register

View the file

Other files

File Type Posted
SP330010B5010 Amendment 0002.pdf PDF
ITEMS DISCUSSED AT THE PREPROPOSAL CONFERENCE.pdf PDF
Site Visit Attendance Sheet.pdf PDF
3704-Specifications-06012010.pdf PDF
SP330010B5010 Amendment 0001.pdf PDF
3704-Specifications-06012010.pdf PDF
SF25A —
SP330010B5010.pdf PDF
SF25 —
Security Attachments A through E.pdf PDF
3704-Drawings-06032010.pdf PDF
SF24 - Bid Bond.pdf PDF
Davis Bacon Wage Determination.htm HTM file
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

01011 SPECIAL REQUIREMENTS

SD-01 Schedule of Values 1.2 G

SD-11 List of Recycled Materials 1.2

01140 WORK RESTRICTIONS

SD-01 Special Access Determination Form 1.1 G

01330 SUBMITTAL PROCEDURES

SD-01 Preconstruction Submittals Submittal Register 1.8 G

01525 SAFETY AND OCCUPATIONAL HEALTH REQTS.

SD-01 Preconstruction Submittals Accident Prevention Plan (APP) 1.6 G

Activity Hazard Analysis (AHA) 1.7 G

Crane Critical Lift Plan 1.2 G

Proof of Current Qualification for Crane Operators 1.2 G

Occupant Protection Plan 1.2 G

Site Demolition Plan 1.2 G

Excavation Plan 1.2 G SD-06 Text Reports Accident Reports (if necessary) 1.11.1 G Crane Reports 1.11.4 G SD-07 Certificates Hot Work Permit 1.12

01780 PROJECT CLOSEOUT

SD-02 Shop Drawings As-Built Drawings 1.2.1 G SD-10 O&M Data Operation and Maintenance Data 1.5 G Warranty/Guaranty 1.3 G

REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION: Upgrade Car Wash, Building 749, DDSP, New Cumberland, PA CONTRACTOR

MAILED TO

CONTR/

DATE RCD

FROM APPR

AUTH

ENG FORM 4288, May 91 EDITION OF AUG 89 IS OBSOLETE Page 1 of 3

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION: Upgrade Car Wash, Building 749, DDSP, New Cumberland, PA CONTRACTOR

MAILED TO

CONTR/

DATE RCD

FROM APPR

AUTH

02220 DEMOLITION

SD-01 Preconstruction Submittals Demolition Plan 1.4 G Notifications 1.4 SD-11 Closeout Submittals Bills of Laden 1.4

02230 EXCAVATION AND COMPACTION FOR PVMTS.

SD-06 Test Reports Aggregate Material Tests 1.4 G Compaction Density Reports 1.4 SD-07 Certificates Aggregate Certificates 1.4

03100 STRUCTURAL CONCRETE FORMWORK

SD-02 Shop Drawings Formwork 1.2 G SD-03 Product Data Form Material 1.2 Form Releasing Agents 1.2 SD-05 Design Data Form Analysis and Design Calculations 1.2 G

03200 CONCRETE REINFORCEMENT

SD-02 Shop Drawings Reinforcement 1.2 G SD-03 Product Data Dowels 1.2 G Reinforcing Steel 1.2 G Wire Ties 1.2 G Anchors 1.2 G SD-07 Certificates Reinforcing Steel 1.2

ENG FORM 4288, May 91 EDITION OF AUG 89 IS OBSOLETE Page 2 of 3

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION: Upgrade Car Wash, Building 749, DDSP, New Cumberland, PA CONTRACTOR

MAILED TO

CONTR/

DATE RCD

FROM APPR

AUTH

03300 CIP STRUCTURAL CONCRETE

SD-03 Product Data Chemical Admixtures 1.3 Curing Materials 1.3 G Latex Modified Agent 1.3 Latex Bonding Agent 1.3 Perimeter Insulation 1.3 Vapor Barrier 1.3 G Joint Materials 1.3 G SD-05 Design Data Design Mix 1.3 G SD-06 Test Reports Testing & Inspection for Contractor Quality Control 1.3 G SD-07 Certificates Qualification 1.3 G Ready-Mixed Concrete 1.3 Documentation from Batch Mixing Plant 1.3 SD-11 Closeout Submittals Delivery Tickets 1.3 G

ENG FORM 4288, May 91 EDITION OF AUG 89 IS OBSOLETE Page 3 of 3

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

04200 MASONRY

SD-03 PRODUCT DATA

Clay or Shale Brick 2.2 G

Concrete Brick 2.3 G

Insulation 2.14 G

Flashing 2.16 G

Water-Repellant Admixture 2.8 G

Cold Weather Installation 3.1.2 G

SD-04 SAMPLES

Concrete Masonry Units (CMU) 2.4 G

Concrete Brick 2.3 G

Clay or Shale Brick 2.2 G

Anchors, Ties and Bar Positioners 2.10 G

Expansion Joint Materials 2.15 G

Joint Reinforcement 2.11 G

Insulation 2.14 G

SD-05 DESIGN DATA

Pre-mixed Mortar 2.7.5 G

SD-06 TEST REPORTS

Efflorescence Test 3.23.3 G

Field Testing of Mortar 3.23.1 G

Field Testing of Grout 3.23.2 G

Prism Test 3.23.4 G

Masonry Cement 2.7.4 G

Fire-rated CMU 2.4.3 G

REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Task Order Construction Services - Division 4 Masonry CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM APPR

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

05120 STRUCTURAL STEEL

SD-02 SHOP DRAWINGS

Fabrication drawings 1.4 G

SD-03 PRODUCT DATA

Shop primer 1.4

SD-07 CERTIFICATES

Steel 1.4 G

Shop primer 1.4

Welding electrodes and rods 1.4 G

AISC Quality Certification 1.4

Welding procedures and qualifications 1.4 G

Galvanizing 1.4

REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Task Order Construction Services - Division 5 Metals CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

05310 STEEL DECKS

SD-02 SHOP DRAWINGS

Fabrication Drawings 1.4.4 G

Deck Units 2.3.1 G

Sound Absorbing Material 2.1.3 G

Accessories 2.2

SD-04 SAMPLES

Deck Units 2.3.1

Accessories 2.2

Deck Units 2.3.1

SD-07 CERTIFICATES

Deck Units 2.3.1

Qualification of Welders 1.4.2

Fire Safety 1.4.3.1

Wind Storm Resistance 1.4.3.2

REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Task Order Construction Services - Division 5 Metals CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

07212 MINERAL FIBER BLANKET INSULATION

SD-03 PRODUCT DATA

Blanket insulation 2.1 G

Vapor retarder 2.4 G

Pressure sensitive tape 2.5

Accessories 2.6

SD-08 MANUFACTURER'S INSTRUCTIONS

Insulation 3.3.1

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

SUBMITTAL REGISTER CONTRACT NO.

#REF! CONTRACTOR

A C T I V I T Y

N O

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

07413 METAL WALL PANELS

SD-02 SHOP DRAWINGS 2.1

Siding 1.3 G

SD-03 PRODUCT DATA

Wall panels 2.1 G

Closures 3.1.1 flashing 3.1.1

Accessories 2.3

Fasteners 2.4

Gaskets and Insulating Compounds 2.6

SD-04 SAMPLES

Wall Panel 2.1 G

Accessories 2.3

Fasteners 2.4

Insulation 2.7

Gaskets and Insulating Compounds 2.6

Sealant 2.5 G

SD-05 DESIGN DATA

Wind Load Caclulation 1.3 G

SD-06 TEST REPORTS

Salt Spray Test 2.2.1 G

SD-07 CERTIFICATES

Wall Panels 2.1 G

Accessories 2.3

Insulation 2.7

SD-08 MANUFACTURER'S INSTRUCTIONS

Installation 3.1 G

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

SUBMITTAL REGISTER CONTRACT NO.

#REF! CONTRACTOR

A C T I V I T Y

N

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

07600 FLASHING AND SHEET METAL

SD-02 SHOP DRAWINGS

Expansion joints 3.1.25 G

Base flashing 3.1.10 G

Counterflashing 3.1.11 G

Eave flashing 3.1.23 G

SD-04 SAMPLES

Expansion joints 3.1.25 G

Base flashing 3.1.10 G

Counterflashing 3.1.11 G

SD-11 CLOSEOUT SUBMITTALS

Quality Control Plan 3.5

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

SUBMITTAL REGISTER CONTRACT NO.

#REF! CONTRACTOR

A C T I V I T Y

N

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

07840 FIRE STOPPING

SD-02 SHOP DRAWINGS

Firestopping Materials 2.1 G

SD-07 CERTIFICATES

Firestopping Materials 2.1 G

Installer Qualifications 1.5 G

Inspection 3.3 G

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

DDSP Task Order Construction Services - Division 7 Thermal and Moisture Protection CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

07920 JOINT SEALANTS

SD-03 PRODUCT DATA

Sealants 2.1 G

Primers 2.2

Bond breakers 2.3

Backstops 2.4

SD-07 CERTIFICATES

Sealant 3.3.6

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

SUBMITTAL REGISTER CONTRACT NO.

#REF! CONTRACTOR

A C T I V I T Y

N

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

08110 STEEL DOORS AND FRAMES

SD-02 SHOP DRAWINGS

Doors 2.1 G

Frames 2.7 G

Accessories 2.5

Weatherstripping 2.9

Schedule of doors 1.4 G

Schedule of frames 1.5 G

SD-03 PRODUCT DATA

Doors 2.1 G

Frames 2.7 G

Accessories 2.5

Weatherstripping 2.9

REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

#REF! CONTRACTOR

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

08361 SECTIONAL OVERHEAD DOORS

SD-02 SHOP DRAWINGS

Doors 2.2 G

SD-03 PRODUCT DATA

Doors 2.2 G

Electric operators 2.5 G

SD-08 MANUFACTURER'S INSTRUCTIONS

Doors 2.2

SD-10 OPERATION AND MAINTENANCE DATA

Doors 2.2 G

REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

#REF! CONTRACTOR

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

08710 DOOR HARDWARE

SD-02 SHOP DRAWINGS

Hardware schedule 1.3 G

SD-03 PRODUCT DATA

Hardware items 2.3 G

SD-08 MANUFACTURER'S INSTRUCTIONS

Installation 3.1

SD-10 OPERATION AND MAINTENANCE DATA

Hardware Schedule 1.3 G

REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

#REF! CONTRACTOR

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

09250 GYPSUM BOARD

SD-03 PRODUCT DATA

Gypsum board 2.1.1 G

Gypsum backing board 2.1.2

Joint treatment materials 2.1.9

Impact Resistant Gypsum Board 2.1.6

Accessories 2.1.14

SD-07 CERTIFICATES

Asbestos Free Materials 2.1 G

REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

#REF! CONTRACTOR

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

09900 PAINTS AND COATINGS

SD-02 SHOP DRAWINGS

Piping identification 3.12

Color Stencil Codes 1.8

SD-03 PRODUCT DATA

Coating 2.1 G

Manufacturer's technical data sheets 2.1 G

Sealant 3.3.5

SD-04 SAMPLES

Color 1.8

SD-07 CERTIFICATES

Applicator's qualifications G

Qualification Testing 1.3.1.2 G

SD-08 MANUFACTURER'S INSTRUCTIONS

Application instructions 3.4.1

Mixing 3.8.2

Manufacturer's Material Safety Data Sheets 1.6.2

SD-10 OPERATION AND MAINTENANCE DATA

Coatings 2.1

REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

#REF! CONTRACTOR

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

15050 BASIC MECHANICAL MATERIALS AND METHODS

None

15080 THERMAL INSULATION FOR MECHANICAL SYSTEMS

SD-03 PRODUCT DATA

General Materials 2.1

Adhesives 2.1.1

Sealants 2.1.1.3

Blanket Insulation 2.3.1 G

Pipe Insulation Materials 2.2 G

Jackets 2.1.8 G

15400 PLUMBING

Pipe material 2.1 G

Pipe hangers 2.2 G

Valves 2.3 G

Backflow preventer 2.4 G

Water Heater 2.5 G

Compress air system 2.6 G

High pressure system 2.8.1 G

Low pressure system 2.8.2 G

Softening system 2.8.3 G

SD-10 OPERATION AND MAINTENANCE DATA

Compress air system 2.6

High pressure system 2.8.1

Low pressure system 2.8.2

Softening system 2.8.3

SD-06 TEST REPORTS

Test of Backflow Prevention Assemblies 3.7.1.1 G

15768 ELECTRIC SPACE HEATING

Electric unit heater 2.1

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

Upgrate Car Wash at Building 749 DDSP New Cumberland, PA. CONTRACTOR

A C T I V I T Y

N

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

16301 OVERHEAD TRANSMISSION AND DISTRIBUTION

SD-03 PRODUCT DATA

Conductors 1.4 G

Insulators 1.4 G

Wood Poles 1.4 G

Cutouts 1.4 G

Transformers 1.4 G

Surger Arrestors 1.4 G

Guy Strand 1.4 G

Anchors 1.4 G

SD-06 TEST REPORTS

Wood Crossarm Inspection Report 1.4 G

Field Test Plan 1.4 G

Field Quality Control 1.4 G

Ground Resistance Test Reports 1.4 G

SD-07 CERTIFICATES

Wood Poles 1.4 G

Wood Crossarms 1.4 G

SD-09 MANUFACTURER'S FIELD REPORTS

Overhead-type distribution transformer tests 1.4

SD-11 CLOSEOUT SUBMITTALS

Transformer test schedule 1.4 G

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

Division 16 ELECTRICAL CONTRACTOR

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

16402 INTERIOR DISTRIBUTION

SD-02 SHOP DRAWINGS

Wiring Diagrams 1.3 G

Installation Details 1.3

SD-03 PRODUCT DATA

Receptacles 1.3 G

Switches 1.3 G

Wires and Cables 1.3 G

Switch and Receptacle Cover Plates 1.3 G

Car Wash Control Station Dwg. E-

102 G

Conduit and Fitting 1.3 G

Outlet Boxes 1.3 G

SD-06 TEST REPORTS

600-volt wiring test 1.3 G

Grounding System Test 1.3 G

SD-10 OPERATION AND MAINTENANCE DATA

Electrical Systems, Data Package 1.3 G

REMARKS

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

Division 16 ELECTRICAL CONTRACTOR

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

CONTRACTOR

ACTION APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

16510 INTERIOR LIGHTING

SD-03 PRODUCT DATA

Fluorescent lighting fixtures 1.4 G Fluorescent electronic ballasts 1.4 G Fluorescent lamps 1.4 G

SD-06 TEST REPORTS

Operating Test 1.4

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

Division 16 ELECTRICAL CONTRACTOR

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

01-Submittal Register
DIV04TOCSPECsubmittal reg
05310submittal reg
07-submittal reg
07840submittal reg
08-submittal reg
DIV08-submittal reg
DIV091-submittal reg
DIV09-submittal reg
Submittal Register DIV 15
DIV16 submittal reg
DIV16 2submittal reg
DIV16 -402submittal reg

File details come from the government source that posted it. Updated .