SP3300-26-Q-5009.docx
DOCX document 53 KB Posted
- Attached to
- Wooden Gates Federal contract opportunity
- Solicitation number
- SP330026Q5009
- Issued by
- Defense Logistics Agency Distribution
About this file
This is a Request for Quotation (RFQ) for wooden gates issued by the Defense Logistics Agency (DLA) Distribution in San Joaquin, Tracy, California. The solicitation number is SP3300-26-Q-5009, and it is set aside as a 100% small business set-aside under NAICS code 321999 with a 500-employee size standard. The government seeks to procure 1,200 wooden gates measuring 84 inches by 88 inches, with each gate to be fabricated in accordance with provided drawings using wood products constructed with rustproof nails (minimum three nails at each cross-section point). Heat treatment of wood products must comply with ISPM 15 guidelines. The gates are to be delivered FOB destination to SB3200 DLA Distribution San Joaquin Base Supply, 25600 S Chrisman Road, Boss Warehouse 29-5, Tracy, CA 95304. This is a firm-fixed-price purchase order award anticipated to result from this solicitation.
Quotations must be submitted electronically via email to Sharon.stine@dla.mil by 12:00 PM EST on March 6, 2026, with the deadline for questions being 12:00 PM EST on February 26, 2026. Quoters must hold prices firm for 60 calendar days from the quote submission date. Submission requirements include three separate files covering technical capability (demonstrating understanding of ASTM-B-660-23 specifications), past performance (or three relevant references within three years), and pricing with administrative documentation. Packaging and packing must comply with ASTM D3951-10 and MIL-STD-129R standards, and materials must be shipped on serviceable, winged pallets certified in accordance with DOD Manual 4140.65-M specifications. Invoicing and payment will be processed through Wide Area WorkFlow (WAWF). The quoter must mark the contract number on all correspondence and shipments and maintain supply chain traceability documentation for six years after final payment. The point of contact is Acquisition Specialist Sharon Stine at 717-580-8769 or Sharon.stine@dla.mil.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001.docx | DOCX document | |
| Attachment Wooden Gate Pallet Drawing.xls | XLS spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTRODUCTION:
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR Part 12 for Wooden Gates for DLA Distribution San Joaquin, Tracy, CA. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued.
POINT OF CONTACT:
Acquisition Specialist Name: Sharon Stine Acquisition Specialist Email Address: Sharon.stine@dla.mil Acquisition Specialist Phone Number: 717-580-8769 KO Name: Erik J. Smith KO Address: 5430 Mifflin Avenue, New Cumberland, PA 17070 KO Email Address: erik.smith@dla.mil KO Phone Number: 614-693-3137
SECTION ONE: NOTICE TO QUOTERS
1. Solicitation number SP3300-26-Q-5009 is issued as a Request for Quotation (RFQ), to provide Wooden Gates for DLA Distribution San Joaquin Tracy, CA.
2. This acquisition is being solicited as a 100% small business set-aside. The NAICS code is 321999 and the size standard is 500 employees. The Product or Service Code for this acquisition is 5660.
3. Closing date and time for quotes: 12:00PM EST on March 6, 2026
4. Closing date and time for questions: 12:00PM EST on February 26, 2026
5. As a result of this solicitation, one (1) firm-fixed-price purchase order will be issued.
6. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at https://www.acquisition.gov/far-overhaul
SECTION TWO: SCHEDULE OF SUPPLIES AND SERVICES
| CLIN |
| Description |
| Unit of Issue |
| Estimated Quantity |
| Unit Price |
| Total Price |
| 0001 |
| WOODEN GATES. SIZE 84 INCHES X 88 INCHES. EACH GATE IS TO BE FABRICATEDIN ACCORDANCE WITH THE DRAWING (ATTACHMENT 1). GATES ARE TO BE CONSTRUCTED USING WOOD PRODUCTS. HEAT TREATMENT OF WOOD PRODUCTS SHALL BE PERFORMED IN ACCORDANCE WITH ISPM 15 GUIDENLINES. ALLBOARDS ARE TO BE NAILED TOGETHER AT ALL CROSS SECTION POINTS WITH RUSTPROOF NAILS. AT A MINIMUM, THREE (3) NAILS ARE TO BE USED AT EACH CROSS SECTION NAIL POINT. STOCK NUMBRE 566000L090001. |
| EACH |
| 1,200.00 |
| $ |
| $ |
1. FOB Destination shipping shall be included in the unit price.
2. Quoters shall quote Fixed Prices for all CLINs.
3. Manufacturer or Distributor Designation:
The quoter is the Manufacturer OR Distributor of this product (check one):
| Manufacturer |
| Distributor |
If a Distributor, the quoter is quoting a product made by the following manufacturer:
If a Distributor, quoter is free to set their own pricing: _______YES or _______NO
SECTION 3: DESCRIPTION
None
SECTION 4: PACKAGING
PACKING AND MARKING REQUIREMENTS
| A. | All shipping containers shall be packaged with the best commercial practice in accordance with ASTM D3951-10 and marked in accordance with MIL-STD-129R. |
| B. | Crates may be banded together in bundles using steel banding material not to exceed a maximum of five (5) crates per bundle and should not be stacked higher than two (2) bundles high. Crates must be stacked squarely & secured adequately to prevent load from shifting while in transit. Crates must be kept covered while in transit and delivered using a vehicle that allows for loading & unloading from the side. |
N00001453 and/or N00001454: 80 EA equals one truckload.
N00001455: 40 EA equals one truckload.
| C. | All shipments shall contain proper shipping documentation. The contractor shall attach a water-resistant envelope containing all mandatory commercial shipping documentation to the exterior of the shipment. See Section 3.6 Order and Receipt Documentation Requirements. |
| D. | Special Marking Requirements. Each shipping container have special markings as required by the applicable ASTM guideline(s). |
SECTION 5: INSPECTION/ACCEPTANCE
1. Proof Of Delivery: Acceptable Proof of Delivery documents include: Shipping Documentation; Materials Inspection and Receiving Report (DD250), Bill of Lading, Packing List, Tracking/Delivery Confirmation or Invoice. To ensure prompt payment to your company, the Proof of Deliveries must include the following:
· CONTRACT NUMBER or ORIGINAL DOCUMENT NUMBER
· DELIVERY ORDER NUMBER (as applicable)
· CLIN /MATERIAL NUMBER
· SPECIFIC QUANTITY SHIPPED IN REFERENCE TO QUANTITY ORDERED
· PRINTED NAME AND WRITTEN SIGNATURE OF A GOVERNMENT EMPLOYEE
SECTION 6: DELIVERY/PERIOD OF PERFORMANCE/ORDERING PERIOD
1. Delivery Destination:
DELIVERY LOCATION:
SB3200
DLA DISTRIBUTION SAN JOAQUIN BASE SUPPLY
25600 S CHRISMAN RD B OSS WHSE 29-5
TRACY, CA 95304
SECTION 7: CONTRACT ADMINISTRATION DATA
1. Invoicing And Payment: Invoicing and Payment will be made via Wide Area Work Flow. See DFARS Clause 252.232-7006.
SECTION 8: SPECIAL CONTRACT REQUIREMENTS
1. Mark Contract Number on all Correspondence: Contractor must mark the contract or purchase order number on all paperwork and shipments. The order number must appear on the exterior of the shipment. Failure to follow these instructions will hold up payment to you and could result in the return of merchandise at your expense.
2. Requirements for Pallets: Material must be shipped on serviceable, winged pallets in accordance with MD00100452, Revision C, dated 09/2016. Please reference the following link for more information:
https://www.dla.mil/LandandMaritime/Offers/Services/TechnicalSupport/Logistics/Packaging/Palletization.aspx
The complete specification for winged pallets can be found in Part 9 of ANSI MH1. The pallet must be heat treated, certified, and stamped or branded with the appropriate certification markings in accordance with DOD Manual 4140.65-M.
Please reference the DLA Master List of Technical and Quality Requirements for information at this link: https://www.dla.mil/HQ/Acquisition/Offers/DLAD/TechnicalandQualityMLofRequirements/
Additional information can be found at:
https://www.dla.mil/LandandMaritime/Offers/Services/TechnicalSupport/Logistics/Packaging/WoodPack.aspx
Failure to deliver supplies on pallets with these specifications will result in the Government not accepting the shipment when it arrives at destination. The quoter must quote shipment of supplies in accordance with this requirement.
3. Organizational Conflict Of Interest: The contractor shall be ineligible from participation as a contractor, subcontractor, or consultant in any procurement arising or resulting from any of the services provided to DLA on this contract. This restriction includes providing services to any potential bidders on such procurements. The contractor shall not incorporate its product or services in any Performance Work Statement or specification unless directed to do so in writing by the Contracting Officer.
If the contractor, in the performance of this contract, obtains access to information such as plans, policies, reports, studies, financial data, internal data, or any other non-public information or information by the Privacy Act, the contractor agrees not to release such information without prior written approval from the Contracting Officer. The use of such information for personal gain is prohibited.
In addition, the contractor agrees that to the extent it receives or is given access to proprietary data, or other confidential or privileged technical, business, or financial information under this contract, it shall treat such information in accordance with any restrictions imposed on such information.
SECTION 9: CLAUSES
Addenda to FAR 52.212-4 Terms and Conditions—Commercial Products and Commercial Services (NOV 2025)
| FAR 52.203-19 |
| Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements |
| FAR 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| FAR 52.204-13 |
| System for Award Management—Maintenance |
| FAR 52.209-6 |
| Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment |
| FAR 52.209-10 |
| Prohibition on Contracting with Inverted Domestic Corporations |
| FAR 52.216-2 |
| Economic Price Adjustment – Standard Supplies |
| FAR 52.219-6 |
| Notice of Total Small Business Set-Aside |
| FAR 52.222-3 |
| Convict Labor |
| FAR 52.222-19 |
| Child Labor—Cooperation with Authorities and Remedies |
| FAR 52.222-36 |
| Equal Opportunity for Workers with Disabilities |
| FAR 52.222-50 |
| Combating Trafficking in Persons |
| FAR 52.226-8 |
| Encouraging Contractor Policies to Ban Text Messaging While Driving |
| FAR 52.232-1 |
| Payments |
| FAR 52.232-8 |
| Discounts for Prompt Payment |
| FAR 52.232-11 |
| Extras |
| FAR 52.232-23 |
| Assignment of Claims |
| FAR 52.232-33 |
| Payment by Electronic Funds Transfer—System for Award Management |
| FAR 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| FAR 52.233-3 |
| Protest After Award |
| FAR 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| FAR 52.240-91 |
| Security Prohibitions and Exclusions |
| FAR 52.247-34 |
| F.o.b Destination |
| DFARS 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| DFARS 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| DFARS 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| DFARS 252.225-7001 |
| Buy American and Balance of Payments Program |
| DFARS 252.225-7012 |
| Preference for Certain Domestic Commodities |
| DFARS 252.225-7036 |
| Buy American—Free Trade Agreements—Balance of Payments Program |
| DFARS 252.225-7048 |
| Export-Controlled Items |
| DFARS 252.225-7056 |
| Prohibition Regarding Business Operations with the Maduro Regime |
| DFARS 252.225-7060 |
| Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region |
| DFARS 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| DFARS 252.232-7010 |
| Levies on Contract Payments |
| DFARS 252.243-7001 |
| Pricing of Contract Modifications |
| DFARS 252.244-7000 |
| Subcontracts for Commercial Products and Commercial Services |
| DFARS 252.247-7023 |
| Transportation of Supplies by Sea |
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This notice incorporates provisions and clauses in effect under:
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the contracting officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
The complete text of any of the clauses and provisions are available electronically from the following sites:
FAR - https://www.acquisition.gov/far-overhaul DFARS - https://www.acq.osd.mil/dpap/dars/dfarspgi/current/ DLAD - https://www.dla.mil/HQ/Acquisition/Policy-and-Directives/
(End of Clause)
DFARS 252.232-7006 Wide Area Workflow Payment Instructions (JAN 2023)
(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
| (b) | Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports. |
| (c) | WAWF access. To access WAWF, the Contractor shall— |
| (1) | Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and |
| (2) | Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site. |
| (d) | WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/ |
| (e) | WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol. |
| (f) | WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order: |
| (1) | Document type. The Contractor shall submit payment requests using the following document type(s): |
| (i) | For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher. |
| (ii) | For fixed price line items— |
| (A) | That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer. |
____Invoice_____ (Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
_______Not Applicable_________ (Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF -- Data to be entered in WAWF Pay Official DoDAAC -- SL4701 Issue By DoDAAC -- SP3300 Admin DoDAAC** -- SP3300 Inspect By DoDAAC -- N/A Ship To Code – SP3200 Ship From Code -- N/A Mark For Code -- N/A Service Approver (DoDAAC) -- N/A Service Acceptor (DoDAAC) – N/A Accept at Other DoDAAC -- N/A LPO DoDAAC -- N/A DCAA Auditor DoDAAC -- N/A Other DoDAAC(s) -- N/A
| (4) | Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable. |
| (5) | Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. |
(g) WAWF point of contact.
| (1) | The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact. Sharon.stine@dla.mil. |
| (2) | Contact the WAWF helpdesk at 866-618-5988, if assistance is needed. |
(End of Clause)
DLAD PROCUREMENT NOTES:
C02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components (DEC 2016) The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.
In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.
C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2023)
| (1) | By submitting a quotation or offer, the contractor, if it is not the manufacturer of the item, is confirming it currently has, or will obtain before delivery, and shall retain documented evidence (supply chain traceability documentation), as described in paragraph (2) of this procurement note, demonstrating the item is from the approved manufacturer and conforms to the technical requirements. |
| (2) | At a minimum, the supply chain traceability documentation for the item shall include: basic item description, part number and/or national stock number, manufacturing source, manufacturing source's Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. |
(3) Contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance- Program/).
(4) The contractor shall immediately make documentation available to the contracting officer upon request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for six years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
(End of Procurement Note)
C14 Correction of Nonconforming Packaging or Marking (MAY 2020)
| (1) | The Government may correct nonconforming packaging or marking for receipts of DLA- owned materiel if the estimated costs of correction are $1,000 or less. The contracting officer will advise the contractor of the discrepancy and that the Government has corrected the packaging or marking. The contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies. |
| (2) | If the estimated costs of correction for receipts of DLA-owned materiel are more than $1,000, the contracting officer will advise the contractor of the discrepancy and have the materiel returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor’s expense. If the Government remediates the discrepancy, the contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies. |
(End of Procurement Note)
L06 Agency Protests (DEC 2016)
Interested parties may file an agency level protest with the contracting officer or may request an independent review by the chief of the contracting office (CCO). Independent review by the CCO is an alternative to consideration by the contracting officer and is not available as an appellate review of a contracting officer decision on a protest previously filed with the contracting officer. Absent a clear indication of the intent to file an agency level protest with the CCO for independent review, protests will be presumed to be protests to the contracting officer.
(End of Text)
SECTION 10: DOCUMENTS, EXHIBITS, AND ATTACHMENTS
There will be an attachment, a drawing.
SECTION 11: REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF QUOTERS OR OFFERORS
Not Applicable
SECTION 12: PROVISIONS
| FAR 52.203-18 |
| Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation |
| FAR 52.204-7 |
| System for Award Management—Registration |
| FAR 52.209-2 |
| Prohibition on Contracting with Inverted Domestic Corporations—Representation |
| FAR 52.209-11 |
| Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law |
| FAR 52.222-18 |
| Certification Regarding Knowledge of Child Labor for Listed End Products |
| FAR 52.240-90 |
| Security Prohibitions and Exclusions Representations and Certifications |
| DFARS 252.203-7005 |
| Representation Relating to Compensation of Former DoD Officials |
| DFARS 252.204-7024 |
| Notice on the Use of the Supplier Performance Risk System |
| DFARS 252.225-7000 |
| Buy American—Balance of Payments Program Certificate |
| DFARS 252.225-7035 |
| Buy American—Free Trade Agreements—Balance of Payments Program Certificate |
| DFARS 252.225-7055 |
| Representation Regarding Business Operations with the Maduro Regime |
| DFARS 252.225-7059 |
| Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region—Representation |
FAR 52.216-1 Type of Contract (APR 1984)
The Government contemplates award of a single Firm Fixed Price purchase order resulting from this solicitation.
(End of Provision)
FAR 52.233-2 Service of Protest (SEP 2006)
| (a) | Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer by obtaining written and dated acknowledgment of receipt from DLA Distribution J7 Acquisition Operations, Attn. Erik Smith, Contracting Officer, 5430 Mifflin Ave, New Cumberland, PA 17070-5008. |
| (b) | The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO. |
(End of Provision)
FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
FAR – https://www.acquisition.gov/far-overhaul DFARS – https://www.acq.osd.mil/dpap/dars/dfarspgi/current/ DLAD – https://www.dla.mil/HQ/Acquisition/Policy-and-Directives/
(End of Provision)
DLAD 5452.233-9001 Disputes – Agreement to Use Alternative Dispute Resolution (ADR) (JUN 2020)
(a) The parties agree to negotiate with each other to try to resolve any disputes that may arise. If unassisted negotiations are unsuccessful, the parties will use alternative dispute resolution (ADR) techniques to try to resolve the dispute. Litigation will only be considered as a last resort when ADR is unsuccessful or has been documented by the party rejecting ADR to be inappropriate for resolving the dispute.
(b) Before either party determines ADR inappropriate, that party must discuss the use of ADR with the other party. The documentation rejecting ADR must be signed by an official authorized to bind the contractor (see FAR 52.233-1), or, for the Agency, by the contracting officer, and approved at a level above the contracting officer after consultation with the ADR Specialist and legal counsel. Contractor personnel are also encouraged to include the ADR Specialist in their discussions with the contracting officer before determining ADR to be inappropriate.
(c) If you wish to opt out of this clause, check here [ ]. Alternate wording may be negotiated with the contracting officer.
(End of Provision)
SECTION 13: INSTRUCTIONS TO QUOTERS
Far 52.212-1 Instructions to Offerors – Commercial Products and Commercial Services (DEVIATION) (CD 2026-O00028) ADDENDA TO FAR 52.212-1 Instructions to Offerors – Commercial Products and Commercial Services (DEVIATION) (CD 2026-O00028)
Reference paragraph (c) under referenced provision FAR 52.212-1. This paragraph is tailored to read as follows:
(c) Period of acceptance of quotes. The quoter agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of quotes.
GENERAL
| 1. | All quotes must be received electronically via email at: Sharon.stine@dla.mil Subject: SP3300-26-Q-5007 Quotation – “Quoter’s Company Name.” Quotations must be received by 12:00 PM Eastern Standard Time on March 6, 2026 to be considered for award. |
| 2. | Facsimile and hard copy quote submissions will not be accepted or evaluated. |
| 3. | Quotes shall be prepared in the English language. |
| 4. | Quotes shall include all required documentation as listed below. The submission of a quote that does not contain all items requested below may result in elimination from consideration for award. The instructions contained herein are to serve as a guide in preparation of quotes; however, they are not intended to be all inclusive. The instructions generally describe the type and extent of information which should be provided in the quote. The quoter is expected to completely examine and analyze all aspects of the technical, past performance, and price areas to be addressed, and to include information in the quote which will enable the evaluators to determine the quoter’s understanding of the requirements in each of the above areas. |
| 5. | Quotes must have the Controlled Unclassified Information (CUI) incorporated markings appropriate pages on each quote file. |
0. Excel Schedule of Supplies – Template includes header and footer with blank controlled block to be filled in by quoter.
0. All other documents marked with appropriate CUI markings as follows:
0. Header on all pages: 1st Line of Header: “CUI”
0. 1st page only, bottom right corner (above footer):
Controlled by: Quoter’s Name CUI Category: SSEL Distribution/Dissemination Controls: FED ONLY POC: To be completed by Quoter
0. Footer (at very bottom) on all pages stating “CUI”
6. Quotes must include the following items:
TECHNICAL CAPABILITY
1. Provide descriptive literature which demonstrates that the quoter clearly and fully understands and meets the minimum technical requirements of the Supplies Requirements and Specifications Document and the Supplies Item List to manufacture and deliver the shipping containers required by the solicitation. Specifically, the quoter should detail their knowledge, experience and familiarity with American Society for Testing Materials ASTM-B-660-23 (last updated in 2023) or similar as it relates to the production of these wooden shipping containers required by the solicitation. “Descriptive Literature” means information (e.g., cuts, illustrations, drawings, brochures) that is submitted as a part of a proposal. Descriptive Literature is required to establish, for the purpose of evaluation and award, details of the product quoted that are specified elsewhere in the solicitation and pertain to significant elements such as: (1) design; (2) materials; (3) components; (4) performance characteristics; and (5) methods of manufacture, assembly, construction or operation. The term includes only information required to determine the technical acceptability of the quoted product.
2. Quotations may be submitted in contractor format and shall include:
-Manufacturer Name and Address -Manufacturer Part Number
2. PAST PERFORMANCE
The quoter shall provide information on its past performance record. If the quoter has no recent, relevant history in the Contractor Performance Assessment Reporting System (CPARS) application, Electronic Subcontract Reporting System (eSRS), or other databases, the quoter may submit up to three (3) recent (within three years), relevant (similar in scope, magnitude and complexity as outlined in the PWS) references to be evaluated. The references may be government or commercial contracts/projects and should include a point of contact, contract number, dollar value, and project information. If a quoter has no recent/relevant past performance, they shall provide the following statement in lieu of the information requested: “(Insert quoter name) has determined they possess no recent, relevant past performance in accordance with the RFQ.”
3. PRICING AND ADMINISTRATIVE
a. The Price Quote shall be submitted in accordance with the Schedule of Supplies CLIN structure contained in Section Two: Schedule of Supplies and Services of the solicitation. The quoter shall provide a unit price and amount for the CLIN. Prices shall be rounded to the second decimal place.
b. Company Name, Address, Point of Contact, Telephone number, and E-mail address.
c. Quoter’s SAM Unique Entity ID and Commercial and Government Entity (CAGE) Code
d. Solicitation Number
e. Signed acknowledgements of amendments (applicable only if any amendments are issued against this solicitation)
f. If quoter is quoting as a distributor/reseller provide a completed copy of the following statement:
"___________________________________ (Company Name) is an authorized distributor/reseller for_________________________________ (Manufacturer Name) products and is free to set our own prices and discounts."
7. Organization: The quoter shall prepare the quote as set forth in the table below. The titles and contents for each file are defined in this table. Quotes shall be submitted as THREE (3) separate files as follow:
| File |
| Title |
| Page Limitations |
| I |
| Technical Capability |
| None |
| II |
| Past Performance |
| None |
| III |
| Pricing & Administrative |
| None |
SECTION 14: EVALUATION
Addenda to FAR 52.212-2 Evaluation - Commercial Products and Commercial Services (DEVIATION) (CD 2026-O00028)
| 1. | The Government intends to award one (1) contract to the acceptable quoter with the lowest evaluated price which is deemed responsible in accordance with the FAR, and which has submitted a quote conforming to the solicitation requirements. The requirements include all stated terms, conditions, and all other requirements of this solicitation. The Government intends to make an award based on the initial quotes received; therefore, the initial quote should contain the quoter’s best terms from a price and technical standpoint. Quoters must be determined to be responsible according to the standards of FAR Subpart 9 to be eligible for award. |
| 2. | Failure to provide a complete, detailed, realistic, and reasonable quote may reflect a lack of understanding of the requirements and may result in a determination that the quoter’s quote is unacceptable. The Government does not assume a duty to search for clarification data to cure problems or inconsistencies with a quoter’s quote. |
| 3. | The award decision process is being conducted under FAR Part 12, wherein the Contracting Officer is permitted to engage in communications with individual contractors about their quotes without being subject to the policies and procedures of FAR Part 15, and without engaging in "discussions" or "negotiations" under FAR Part 15. |
| 4. | Although the Government intends to award a Purchase Order resulting from this solicitation, the Government reserves the right to reject any and all quotes received and not award any item or items from this solicitation. |
| 5. | Technical Capability and Past Performance will be evaluated on an acceptable or unacceptable basis. |
TECHNICAL CAPABILITY
To be considered acceptable:
1. The offeror’s supplies must meet the salient physical, functional, or performance characteristics specified in this solicitation.
2. The offeror must demonstrate a clear understanding of the requirements of the Supplies Requirements and Specifications Document and the Supplies Item List to manufacture and deliver the shipping containers required by the solicitation.
PAST PERFORMANCE
To be considered acceptable:
| 1. | The quoter will be evaluated on their past performance record and any other relevant information obtained from available sources which may include CPARS, eSRS, Responsibility/Qualification reports in SAM, other databases, as well as interviews with POC references, Program Managers/Customers, Contracting Officers, or Contracting Officer Representatives (CORs), data submitted by the Quoter as part of the Past Performance file, and any other information available to determine the quality and relevance of the quoter’s past performance. |
| 2. | The Government shall determine how well the quoter performed on the recent (within 3 years of solicitation issuance) and relevant (similar in scope, magnitude, complexity) contracts. The Government will assign an acceptable/unacceptable rating as to the quoter’s ability to perform on the required effort based upon the recent and relevant past performance record considering the information available regarding quality of performance. |
| 3. | In the case of a quoter without a record or references of recent and relevant past performance, or for whom information on past performance is not available, or so sparse that no meaningful past performance rating can be reasonably assigned, the quoter may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv), Past Performance Evaluation). Therefore, the quoter shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.” |
| 4. | Should the Government discover adverse past performance information to which the quoter had not had a prior opportunity to respond, the Contracting Officer will conduct communications if deemed appropriate. |
PRICE AND ADMINISTRATIVE
| 1. | If a quote has been determined acceptable under each of the non-price factors listed above, the Government will then evaluate the quote for the lowest price. The quoted total price between quoters determined to be technically acceptable will be the determining factor in the selection of a quote for award. Price analysis shall not be conducted on quoters determined to be unacceptable for award, since the quoter will not be in line for award as the lowest priced technically acceptable quoter. All CLINs must be priced. |
| 2. | The Government will perform a price analysis to determine the reasonableness of proposed price in accordance with the FAR 15.404-1(b). The Government will utilize a comparison of proposed prices received in response to the solicitation. |
| 3. | A written notice of award or acceptance of a quoter mailed or otherwise furnished to the successful quoter within the time for acceptance specified in the quoter, shall result in a binding contract without further action by either party. Before the quoter’s specified expiration time, the Government may accept a quote (or part of a quote), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award. |
****************************END OF THE SOLICITATION**************************
File details come from the government source that posted it. Updated .