Specs Combined.pdf
PDF 520 KB Posted
- Solicitation number
- SP3100-08-B-5002
- Issued by
-
Defense Logistics Agency Distribution
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 SP310008B5002.pdf | ||
| Bldg 51 Combined Dwgs.pdf | ||
| Bldg 50 Combined Dwgs.pdf | ||
| Bldg 55 Combined Dwgs.pdf | ||
| Amendment 0001 SP310008B5002.pdf | ||
| Bldg 56 Combined Dwgs.pdf | ||
| Site Visit Attendance Sheet.pdf | ||
| ITEMS DISCUSSED AT THE PREPROPOSAL CONFERENCE.doc | DOC document | |
| SP3100-08-B-5002.pdf | ||
| Bldg 51 Combined Dwgs.pdf | ||
| Security Attachments A through E.pdf | ||
| Bldg 55 Combined Dwgs.pdf | ||
| Davis Bacon Wage Determination.htm | HTM file | |
| Bldg 56 Combined Dwgs.pdf | ||
| Bldg 50 Combined Dwgs.pdf | ||
| SF25A | — | |
| SF25 | — | |
| SF24 - Bid Bond.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEFENSE LOGISTICS AGENCY
DEFENSE DISTRIBUTION DEPOT SUSQUEHANNA
PENNSYLVANIA
NEW CUMBERLAND, PA 17070-5002
SPECIFICATIONS
FOR
WAREHOUSE FLOOR LINE PAINTING
BUILDINGS 50, 51, 55 and 56
FACILITIES ENGINEERING DIVISION
March 2008
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01011 SPECIAL REQUIREMENTS Section 01140 WORK RESTRICTIONS Section 01330 SUBMITTAL PROCEDURES Section 01525 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
DIVISION 09 – FINISHES
Section 09900 PAINTS AND COATINGS
Section 01011 Page 1
SECTION 01011
SPECIAL REQUIREMENTS
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The project consists of performing preparation for line painting, line painting and number/letter stenciling in various facilities. For facilities associated with this contract see the contract drawings.
1.1.2 Location
The work is located at the Defense Distribution Depot Susquehanna, New Cumberland, Pennsylvania. The exact locations are as indicated on the contract drawings.
1.2 EXISTING WORK
In addition to FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.3 ENVIRONMENTAL PROTECTION
1.3.1 The contractor shall be responsible for complying with all environmental protection regulations promulgated by US Environmental Protection Agency (EPA) and Commonwealth of Pennsylvania Department of Environmental Protection (DEP). Any hazardous materials used by the contractor in performing this contract shall be properly packaged and stored in a sealed container to avoid spills, and shall be reported immediately to the Contracting Officer and shall be cleaned up immediately by the contractor at his own expense in accordance with EPA and DEP’s regulations.
1.3.2 Disposal of Refuse
Refuse shall be disposed of off site and in accordance with local, state and federal regulations.
1.4 CONSTRUCTION SITE MAINTENANCE
All supplies and equipment on the project site shall be stored so as to preclude mechanical and climatic damage. The project site shall be maintained in a neat and orderly manner.
Section 01011 Page 2
1.5 NOISE CONTROL
The Contractor shall comply with all applicable state and local laws, ordinances and regulations relative to noise control.
1.6 SECURITY
The Contractor shall provide adequate protection for all parts of the building wherever work under this contract is performed.
1.6.1 Cameras
Possession or use of cameras on Government property is forbidden without prior written approval by the Security Officer or his designated representative. Requests for possession and/or use of cameras on Government property shall be in writing to the Security Office via the Contracting Officer and contain sufficient information to provide requirements for the use of photographic equipment.
1.7 TOILET FACILITIES
Contractor shall be permitted to use the on-site restroom facilities at no additional cost to the Contractor.
1.8 SAFETY AND HEALTH
1.8.1 General
a. Applicable Publications: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
b. Code of Federal Regulations (CFR)
OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both Parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402.
National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).
Federal Standard (Fed Std): Material Safety Data Sheets 313A
Safety and Health Requirements Manual. EM 385-1-1
1.8.2 Work Covered by This Section
This section is applicable to all work covered by this contract.
1.8.3 Safety Assurance
a. Preconstruction Safety Meeting: Representatives of the Contractor shall meet with the Contracting Officer and his representative(s)
Section 01011 Page 3 prior to the start of repair, alteration or construction activities for the purpose of reviewing the Contractor's safety and health programs and discussing implementation of all safety and health provisions pertinent to the work to be performed under the contract.
The Contractor shall be prepared to discuss, in detail, the measures he intends to take in order to control any unsafe or unhealthy conditions associated with the work to be performed under the contract. This meeting may be held in conjunction with the preconstruction conference, if so directed by the Contracting Officer. The conduct of the meeting is not contingent upon a general preconstruction meeting. The level of detail for the safety meeting is dependent upon the nature of the work and the potential inherent hazards. The Contractor's principal on-site representative(s), the general superintendent and his safety representative(s) shall attend this meeting.
b. Contractor Responsibility: The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his part or that of his employees or subcontractors, which results in illness, injury or death.
1.8.4 Utilities (Work Related)
a. When available, water and electrical services may be used in this work at no cost to the Contractor. The Contractor shall make arrangements for such services with the Contracting Officer or his designated representative.
b. All temporary outages of any utility services required for the performance of work shall be scheduled with the Contracting Officer's Representative (COR) no less than 3 working days in advance of such outages unless otherwise specified in the Task Order.
1.8.5 Standards of Conduct
All Defense Logistics Agency (DLA), Higher Headquarters and Depot regulations pertaining to conduct shall be adhered to by Contractor personnel. Good conduct and judgment is expected of all people entering the installations. Fighting, profane language, reckless driving or failure to respond to direct orders from any depot employee acting in an official capacity (i.e., Security Guards or Firemen) shall be sufficient reason to remove the disorderly individual from the Depot. A list of Depot rules and regulations will be provided to the Contractor during the preconstruction meeting by the Security Office representative.
1.8.6 Additional Requirements
Refer to Section 01525 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS.
1.9 SHOP DRAWING REQUIREMENTS
It is suggested the Contractor bring all submittals to the preconstruction meeting. This meeting will normally be scheduled within a few weeks subsequent to project award to allow the Contractor time to assemble the
Section 01011 Page 4 shop drawings. Submittals not provided at the preconstruction meeting are to be identified in the project submittal schedule.
1.11 BUY RECYCLE PROGRAM
1.11.1 Mandated Requirements
The Contractor shall comply with Public Law 42 U.S.C. 6962, Resource Conservation and Recovery Act, 1994 Resource Conservation and Recovery Act (RCRA) and Presidential Executive Order 12873, Federal Acquisition Recycling, and Waste Prevention, 22 October 1993, relating to specific designated items in this contract for which recycle content standards have been established. Compliance with this program does not relieve the Contractor from meeting all other specification requirements.
1.11.2 Administrative Requirements
Where possible the contractor shall in performance of the daily activities associated with the contract assignment utilize products containing recycled components in the following categories:
a. Paper and Paper Products
b. Lubricating Oils Containing Re-refined Oil
c. Retread Tires
d. Transportation (traffic control) Products
e. Non-Paper Office Products
1.12 PAYMENTS
1.12.1 Application for Payment
The date for presentation of monthly applications for progress payments to the Depot shall be established at the preconstruction conference and will govern all such applications unless modified by the Depot and the Contractor at least twenty days prior thereto.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
-- End of Section --
SECTION 01140
WORK RESTRICTIONS
1.1 CONTRACTOR ACCESS AND USE OF PREMISES
1.1.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials shall be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry.
1.1.2 Working Hours
Regular working hours shall consist of an 8 1/2 hour period established by the Contracting Officer, Monday through Friday, 7:30 a.m. to 4:30 p.m., excluding Government holidays.
1.1.3 Occupied and Existing Building(s)
The Contractor shall be working in an existing building and around existing buildings which are occupied.
Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the work area during the construction period.
1.2 SECURITY REQUIREMENTS
1.2.1 Personnel and Vehicle Security
1.2.1.1 Commercial Vehicles
Vehicle passes will be issued to each commercial vehicle that is required for the job, authorizing entry and parking within the DDSP. Every vehicle entering the DDSP will display the pass on the dashboard or visor (facing outward). The pass will be visible at all times while in the DDSP. Parking is limited to those areas that are specifically identified on the pass. If additional passes are required, present adequate justification to the Pass and ID Office via the Contracting Officer.
1.2.1.2 Parking
Do not park on or block the marked fire lanes or crane rail traveling zones (marked in yellow) at any time. An exception may be made for vehicles which are part of the equipment needed to do the required work.
1.2.1.3 Vehicle Searches
Section 01140 Page 1
Vehicles are subject to search while entering, remaining in, or leaving the Depot.
1.2.1.4 Areas Not Covered by Contract
Contractor personnel will not be permitted to enter Depot buildings, spaces, and areas not covered by this contract except on prior approval of the Depot department/office/shop having jurisdiction of the areas. Coordinate action with the Contracting officer to obtain such entry approval.
1.2.1.5 Identification Badges
Comply with the following:
a. Submit a Visit Request (VR) and Special Access Determination (SAD) for each person listed to the Security Officer via the Contracting Officer at least 1 week prior to the start date.
b. Employees and representatives requiring access are U.S. citizens or
U.S. Nationals.
c. Under no circumstances shall personnel hand carry their own visit request.
d. Employees shall provide documented proof of U.S. citizenship to the
Pass and ID Office prior to being issued a Depot badge.
e. Employees shall be available for interviews upon request by the
Depot Security Specialist.
f. Employees shall wear and display the Depot badge at all times while entering, remaining in, and exiting Depot spaces and each badge shall be used only by the specific individual named on the badge.
g. Maintain strict accountability over identification badges and passes issued by the Pass and ID Office. Return badges/passes to the Pass Office immediately upon termination of any employee, expiration, completion of contract, or when no longer required.
1.4.2 Photographs
Photography is prohibited on the Depot. When operationally required, submit a written request containing specific justification and details to the Security Officer via the COR.
Not used.
--End of Section--
Section 01140 Page 2
SECTION 01330
SUBMITTAL PROCEDURES
1.1 DEFINITIONS
1.1.1 Submittal
Contract Clauses "FAR 52.236-5, Material and Workmanship," paragraph (b) and "FAR 52.236-21, Specifications and Drawings for Construction," paragraphs (d), (e), and (f) apply to all "submittals."
1.1.2 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections. Submittals are identified by SD numbers and titles as follows.
SD-01 Preconstruction Submittals
Certificates of insurance.
Surety bonds.
List of proposed subcontractors.
List of proposed products.
Construction Schedule.
Submittal register.
Health and safety plan.
Work Plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Section 01330 Page 1
Color samples from the manufacturer’s standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-u[s constructed on the project site establish standards by with the ensuing work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-05 Design Data
Calculations, mix designs, analyses or other data pertaining to a part of the work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily checklists.
Final acceptance test and operational test procedures.
SD-07 Certificates
Statements signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
SD-08 Manufacturer’s Instructions
Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.
Section 01330 Page 2
SD-09 Manufacturer’s Field Reports
Documentation of the testing and verification actions taken by manufacturer’s representative to confirm compliance with manufacture’s standards or instructions.
SD-10 Operation and Maintenance Data
Data that is furnished by the manufacturer or the system provider to the equipment operating and maintenance personnel. This data is needed by operating and data personnel for the safe and efficient operation, maintenance and repair of the item.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
1.1.3 Approving Authority
Office authorized to approve submittal.
1.1.4 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. The following shall be submitted in accordance with Section 01330 SUBMITTAL PROCEDURES:
Submittal register; G
1.3 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.3.1 Government Approved
Governmental approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with entire system must be checked, and other items as designated by the Contracting Officer.
Within the term of the Contract Clause entitled “Specifications and Drawings for Construction,” they are considered to be “shop drawings.”
1.3.2 Information Only
All submittals not requiring Government approval will be for information only. All submittals not requiring Designer of Record or Government approval
Section 01330 Page 3 will be for information only. They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
All submittals not requiring Government approval will be for information only. They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
1.4 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory design, general method of construction, materials, detailing and other information appear to meet the Solicitation and Accepted Proposal. Approval will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work. For design-build projects, the Contractor is responsible for design, dimensions, all design extensions, such as the design of adequate connections and details, etc., and the satisfactory construction of all work. After submittals have been approved by the Contracting Officer, no re-submittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.5 DISAPPROVED SUBMITTALS
The Contractor shall make all corrections required by the Contracting Officer and promptly furnish a corrected submittal in the form and number of copies specified for the initial submittal. The Contractor shall make all corrections required by the Contracting Officer, obtain the Designer of Record's approval when applicable, and promptly furnish a corrected submittal in the form and number of copies specified for the initial submittal. Any "information only" submittal found to contain errors or unapproved deviations from the Solicitation or Accepted Proposal shall be resubmitted as one requiring "approval" action, requiring both Designer of Record and Government approval. If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, a notice in accordance with the Contract Clause "Changes" shall be given promptly to the Contracting Officer.
1.6 WITHHOLDING OF PAYMENT
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
1.7 GENERAL
The Contractor shall make submittals as required by the specifications. The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same as those used in the contract drawings. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Prior to submittal, all items shall be checked and approved by the Contractor's Quality Control (CQC) System Manager Quality Control (CQC) System Manager and the Designer of Record, if
Section 01330 Page 4 applicable, and each item shall be stamped, signed, and dated by the CQC System Manager indicating action taken. Proposed deviations from the contract requirements shall be clearly identified. Submittals shall include items such as: Contractor's, manufacturer's, or fabricator's drawings;
descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples;
O&M manuals (including parts list); certifications; warranties; and other such required submittals. Submittals requiring Government approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby. Samples remaining upon completion of the work shall be picked up and disposed of in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
1.8 SUBMITTAL REGISTER
The Contractor shall prepare a submittal register showing items of equipment and materials for which submittals are required by the specifications; this list may not be all inclusive and additional submittals may be required.
Thereafter, the Contractor shall maintain a complete list of all submittals, including completion of all data columns. Dates on which submittals are received and returned by the Government will be included in its export file to the Contractor. The Contractor shall track all submittals.
1.9 SCHEDULING
Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently. Certifications to be submitted with the pertinent drawings shall be so scheduled. Adequate time (a minimum of 14 calendar days exclusive of mailing time) shall be allowed and shown on the register for review and approval. No delay damages or time extensions will be allowed for time lost in late submittals. An additional 7 calendar days shall be allowed and shown on the register for review and approval of submittals for food service equipment and refrigeration and HVAC control systems.
1.10 TRANSMITTAL FORM (ENG FORM 4025)
The sample transmittal form (ENG Form 4025) attached to this section shall be used for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms will be furnished to the Contractor. This form shall be properly completed by filling out all the heading blank spaces and identifying each item submitted. Special care shall be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item. Only one submittal shall be attached to each transmittal form.
1.11 SUBMITTAL PROCEDURES
Submittals shall be made as follows:
1.11.1 Procedures: Six copies of each submittal shall be sent to the Contracting Officer for approval.
1.11.2 Deviations: For submittals which include proposed deviations requested by the Contractor, the column “variation” of ENG Form 4025 shall be checked. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government
Section 01330 Page 5 reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
1.12 CONTROL OF SUBMITTALS
The Contractor shall carefully control his procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.13 GOVERNMENT APPROVED SUBMITTALS
Upon completion of review of submittals requiring Government approval, the submittals will be identified as having received approval by being so stamped and dated. Three copies of the submittal will be retained by the Contracting Officer and one copy of the submittal will be returned to the Contractor. If the Government performs a conformance review of other Designer of Record approved submittals, the submittals will be so identified and returned, as described above.
1.14 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.
The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;
and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe. For design-build construction the Government will retain three copies of information only submittals.
1.15 STAMPS
Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements shall be similar to the following:
Section 01330 Page 6
Section 01330 Page 7
| CONTRACTOR |
| (Firm Name) |
| _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s). |
| SIGNATURE: __________________________________________________________ |
| TITLE: ______________________________________________________________ |
| DATE: _______________________________________________________________ |
1.16 BUY RECYCLE PROGRAM
The DDSP actively encourages the use of materials made with recycled content. When submitting shop drawings for materials, list recycled contents contained in these products and services.
Form 4025 *U.S. Government Printing Office: 1991 – 523.366/400989
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL
SAMPLES, OR MANUFACTURER’S CERTIFICATE OF COMPLIANCE
(Read instructions on the reverse side prior to initiating this form)
DATE TRANSMITTAL NO.
SECTION I – REQUEST FOR APPROVAL FOR THE FOLLOWING ITEMS (This section will be initiated by the contractor)
TO: FROM:
CONTRACT NO. CHECK ONE:
THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL OF
TRANSMITTAL _______________
SPECIFICATION SECTION NO.
(Cover only one section with each transmittal)
PROJECT TITLE AND LOCATION
ITEM
NO.
a.
DESCRIPTION OF ITEM SUBMITTED
(Type size, model number/etc.)
b.
MFG. OR CONTR. CAT.,
CURVE DRAWING OR
BROCHURE NO.
(See instruction No. 8) c.
NO. OF
COPIES
d.
CONTRACT REFERENCE
DOCUMENT
SPEC. DRAWING
PARA. NO. SHEET NO.
e. f.
FOR
CONTRACTOR
USE CODE
g.
VARIATION
(See instruction
No. 6.)
h.
FOR CE USE
CODE
i.
REMARKS I certify that the above submitted items have been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.
NAME AND SIGNATURE OF CONTRACTOR
SECTION II – APPROVAL ACTION
ENCLOSURES RETURNED (List by Item No.)
NAME TITLE AND SIGNATURE OF APPROVING AUTHORITY DATE
SHEET ____ OF ____
INSTRUCTIONS
1. Section I will be initiated by the Contractor in the required number of copies.
2. Each transmittal shall be numbered consecutively in the space provided for the “Transmittal No.”. This number, in addition to the contract number, will form a serial number for identifying each submittal. For new submittals or resubmittals mark the appropriate box; on resubmittals, insert transmittal number of last submission as well as the new submittal number.
3. The “Item No.” will be the same “Transmittal No.” as indicated on the Submittal Register. Only one item no. per transmittal no. will be accepted.
4. Submittals requiring expedition handling will be submitted on separate form.
5. Separate transmittal form will be used for submittals under separate sections of the specifications.
6. A check shall be placed in the “Variation” column when a submittal is not in accordance with the plans and specifications – also, a written statement to that effect shall be included in the space provided for “Remarks”.
7. Form is self-transmittal, letter of transmittal is not required.
8. When a sample of material or Manufacturer’s Certificate of Compliance is transmitted, indicate “Sample” or “Certificate” in column c, Section I.
9. U.S. Army Corps of Engineers approving authority will assign action codes as indicated below in space provided in Section I, column I to each item submitted. In addition they will ensure enclosures are indicated and attached to the form prior to return to the contractor. The Contractor will assign action codes as indicated below in Section I, column g, to each item submitted.
THE FOLLOWING ACTION CODES ARE GIVEN TO ITEMS SUBMITTED
A -- Approved as Submitted
B -- Approved, except as noted on drawings
C -- Approved, except as noted on drawings.
Refer to attached sheet resubmission required
D -- Will be returned by separate correspondence
E -- Disapproved (See attached)
F -- Receipt acknowledged
FX -- Receipt acknowledged, does not comply as noted with contract requirements
G -- Other (Specify)
10. Approval of items does not relieve the contractor from complying with all the requirements of the plans and specifications.
Form 4025
*U.S. Government Printing Office: 1991 – 523.366/400989
SUBMIT
APPROVAL
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
01330 SUBMITTAL PROCEDURES
SD-01 PRECONSTRUCTION SUBMITTALS
Submittal Register 1.8 G
SUBMITTAL REGISTER CONTRACT NO.
TITLE AND LOCATION
Division 01 - General Requirements CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM APPR
AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
01525 SAFETY AND OCCUPATIONAL HEALTH REQTS.
SD-01 PRECONSTRUCTION SUBMITTALS
Accident Prevention Plan (APP) 1.6 G
SD-06 TEST REPORTS
Accident Reports (if necessary) 1.10.1 G
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM APPR
AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
SUBMITTAL REGISTER CONTRACT NO.
TITLE AND LOCATION
Division 01 - General Requirements CONTRACTOR
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
09900 PAINTS AND COATINGS
SD-O3 PRODUCT DATA
Coating G Manufacturer's Technical Data Sheets G
SD-07 CERTIFICATES
Applicator's Qualifications G
SD-08 MANUFACTURER'S INSTRUCTIONS
Written Application Instructions G Written Preparation/Cleaning Instruction prior to Applications G Written Mixing Instructions Manufacturer's Material Safety Data Sheets G
SUBMITTAL REGISTER CONTRACT NO.
TITLE AND LOCATION
Division 09 - Finishes. CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM APPR
AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
Section 01525 Page 1
SECTION 01525
SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI/ASSE A10.34 (2001) Protection of the Public on or
Adjacent to Construction Sites
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 241 (2000) Safeguarding Construction, Alteration, and Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2003) Safety -- Safety and Health
Requirements
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926 Safety and Health Regulations for
Construction
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01330 SUBMITTAL
PROCEDURES:
Accident Prevention Plan (APP); G
SD-06 Test Reports
Reports
Submit reports as their incidence occurs, in accordance with the requirements of the paragraph entitled, "Reports."
Accident Reports; G
Regulatory Citations and Violations
1.3 DEFINITIONS
Section 01525 Page 2
"USACE" property and equipment specified in USACE EM 385-1-1 should be interpreted as Government property and equipment.
1.4 REGULATORY REQUIREMENTS
In addition to the detailed requirements included in the provisions of this contract, work performed shall comply with USACE EM 385-1-1. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply.
1.5 SITE QUALIFICATIONS, DUTIES AND MEETINGS
1.5.1 Personnel Duties
1.5.1.1 General Safety and Health Officer
The Contractor's General Safety and Health Officer shall:
a. Conduct mishap investigations and complete required reports.
Maintain the OSHA Form 300 and Daily Production reports for prime and sub-contractors.
b. Implement and enforce accepted APPS and AHAs.
c. Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. A list of unresolved safety and health deficiencies shall be posted on the safety bulletin board.
1.5.2 Meetings
1.5.2.1 Preconstruction Conference
a. Contractor representatives who have a responsibility or significant role in accident prevention on the project shall attend the preconstruction conference.
b. The Contractor shall discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the Contractor and the Contracting Officer's representative as to which phases will require an analysis. In addition, a schedule for the preparation, submittal, review, and acceptance of AHAs shall be established to preclude project delays.
c. Deficiencies in the submitted APP will be brought to the attention of the Contractor at the preconstruction conference, and the Contractor shall revise the plan to correct deficiencies and re-submit it for acceptance. Work shall not begin until there is an accepted APP.
1.5.3.2 Safety Meetings
Section 01525 Page 3
Shall be conducted and documented as required by EM 385-1-1. Minutes showing contract title, signatures of attendees and a list of topics discussed shall be attached to the Contractors' daily quality control report.
1.6 ACCIDENT PREVENTION PLAN (APP)
The Contractor shall use a qualified person to prepare the written site-specific APP. Prepare the APP in accordance with the format and requirements of USACE EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in USACE EM 385-1-1, Appendix A, "Minimum Basic Outline for Accident Prevention Plan". Specific requirements for some of the APP elements are described below. The APP shall be job-specific and shall address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP shall be signed by the person and firm (senior person) preparing the APP, the Contractor, the designated CSP and/or CIH.
Submit the APP to the Contracting Officer 15 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without an accepted APP.
Once accepted by the Contracting Officer, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified.
Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO and quality control manager. Should any hazard become evident, stop work in the area, secure the area, and develop a plan to remove the hazard. Notify the Contracting Officer within 24 hours of discovery. Eliminate/remove the hazard. In the interim, all necessary action shall be taken to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public (as defined by ANSI/ASSE A10.34,) and the environment.
Copies of the accepted plan will be maintained at the Contracting Officer's office and at the job site.
The APP shall be continuously reviewed and amended, as necessary, throughout the life of the contract. Unusual or high-hazard activities not identified in the original APP shall be incorporated in the plan as they are discovered.
1.7 SITE SAFETY REFERENCE MATERIALS
Section 01525 Page 4
Maintain safety-related references applicable to the project, including those listed in the article "References." Maintain applicable equipment manufacturer's manuals.
1.8 EMERGENCY MEDICAL TREATMENT
Should an accident occur on site, DDSP emergency medical technician shall respond and provide ambulance services off the Depot. When available the Depot will transport the injured to the nearest public hospital. Otherwise, transport will be provided to the main gate where the injured may be transferred to a public ambulance. This is required for security purposes of the Depot.
1.9 REPORTS
1.9.1 Accident Reports
For recordable injuries and illnesses, and property damage accidents resulting in at least $2,000 in damages, the Prime Contractor shall conduct an accident investigation to establish the root cause(s) of the accident, complete the USACE Accident Report Form 3394 and provide the report to the Contracting Officer within 5 calendar day(s) of the accident. The Contracting Officer will provide copies of any required or special forms.
1.9.2 Accident Notification
Notify the Contracting Officer as soon as practical, but not later than four hours, after any accident meeting the definition of Recordable Injuries or Illnesses or High Visibility Accidents, property damage equal to or greater than $2,000, or any weight handling equipment accident. Information shall include contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident;
names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (to include type of construction equipment used, PPE used, etc.). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted.
NOT USED
PART 3 EXECUTION
3.1 CONSTRUCTION AND/OR OTHER WORK
The Contractor shall comply with USACE EM 385-1-1, NFPA 241, the APP, the AHA, Federal and/or State OSHA regulations, and other related submittals and activity fire and safety regulations. The most stringent standard shall prevail.
SECTION 09900
PAINTS AND COATINGS
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
ACGIH 0100Doc (2001) Documentation of the Threshold Limit
Values and Biological Exposure Indices
ASTM INTERNATIONAL (ASTM)
ASTM D 235 (2002) Mineral Spirits (Petroleum Spirits)
(Hydrocarbon Dry Cleaning Solvent)
MASTER PAINTERS INSTITUTE (MPI)
MPI 72 (Jan 2004) Polyurethane, Two Component, Pigmented, Gloss
MPI 97 Traffic Marking Paint, Latex, Gloss, MPI
Gloss Level 6
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SP01-01 (2000) Environmentally Preferable Product
Specification for Architectural and Anti- Corrosive Paints
THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC Guide 3 (1982; R 1995) A Guide to Safety in Paint
Application
SSPC PA 1 (2000) Shop, Field, and Maintenance Painting
SSPC SP 1 (1982; R 2000) Solvent Cleaning
SSPC SP 2 (1982; R 2000) Hand Tool Cleaning
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2003) Safety -- Safety and Health
Requirements
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
SECTION 09900 Page 1
FED-STD-313 (Rev D; Am 1) Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.1000 Air Contaminants
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01330
SUBMITTAL PROCEDURES:
The current MPI, "Approved Product List" which lists paint by brand, label, product name and product code as of the date of contract award, will be used to determine compliance with the submittal requirements of this specification. The Contractor may choose to use a subsequent MPI "Approved Product List", however, only one list may be used for the entire contract and each coating system is to be from a single manufacturer. All coats on a particular substrate must be from a single manufacturer. No variation from the MPI Approved Products List is acceptable.
Samples of specified materials may be taken and tested for compliance with specification requirements.
In keeping with the intent of Executive Order 13101, "Greening the Government through Waste Prevention, Recycling, and Federal Acquisition", products certified by SCS as meeting SCS SP01-01 shall be given preferential consideration over registered products. Products that are registered shall be given preferential consideration over products not carrying any EPP designation.
SD-03 Product Data
Coating; G
Manufacturer's technical data sheets; G
SD-07 Certificates
Applicator's qualifications; G
Qualification testing laboratory for coatings; G
SD-08 Manufacturer's Instructions
Written Application Instructions
Written Cleaning Instructions prior to Application
Written Mixing Instructions
SECTION 09900 Page 2
Detailed mixing instructions, minimum and maximum application temperature and humidity, potlife, and curing and drying times between coats.
Manufacturer's Material Safety Data Sheets; G
Submit manufacturer's Material Safety Data Sheets for coatings, solvents, and other potentially hazardous materials, as defined in
FED-STD-313.
1.3 REGULATORY REQUIREMENTS
1.3.1 Environmental Protection
In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction. Notify Contracting Officer of any paint specified herein which fails to conform.
1.3.2 Lead Content
Do not use coatings having a lead content over 0.06 percent by weight of nonvolatile content.
1.3.3 Chromate Content
Do not use coatings containing zinc-chromate or strontium-chromate.
1.3.4 Asbestos Content
Materials shall not contain asbestos.
1.3.5 Mercury Content
Materials shall not contain mercury or mercury compounds.
1.3.7 Human Carcinogens
Materials shall not contain ACGIH 0100Doc and ACGIH 0100Doc confirmed human carcinogens (A1) or suspected human carcinogens (A2).
1.4 PACKAGING, LABELING, AND STORAGE
Paints shall be in sealed containers that legibly show the contract specification number, designation name, formula or specification number, batch number, color, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and special precautions, and name and address of manufacturer. Pigmented paints shall be furnished in containers not larger than 5 gallons. Paints and thinners shall be stored in accordance with the manufacturer's written directions, and as a minimum, stored off the ground, under cover, with sufficient ventilation to prevent the buildup of flammable vapors, and at temperatures between 40 to 95 degrees F.
1.5 SAFETY AND HEALTH
SECTION 09900 Page 3
Apply coating materials using safety methods and equipment in accordance with the following:
Work shall comply with applicable Federal, State, and local laws and regulations, and with the ACCIDENT PREVENTION PLAN, including the Activity Hazard Analysis as specified in Section 01525 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS and in Appendix A of EM 385-1-1. The Activity Hazard Analysis shall include analyses of the potential impact of painting operations on painting personnel and on others involved in and adjacent to the work zone.
1.5.1 Safety Methods Used During Coating Application
Comply with the requirements of SSPC Guide 3.
1.5.2 Toxic Materials
To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:
a. The applicable manufacturer's Material Safety Data Sheets (MSDS) or local regulation.
b. 29 CFR 1910.1000.
c. ACGIH 0100Doc, threshold limit values.
1.6 ENVIRONMENTAL CONDITIONS
1.6.1 Coatings
Do not apply coating when air or substrate conditions are:
a. Less than 5 degrees F above dew point;
b. Below 50 degrees F or over 95 degrees F, unless specifically pre-approved by the Contracting Officer and the product manufacturer.
Under no circumstances shall application conditions exceed manufacturer recommendations.
1.8 COLOR SELECTION
Colors of finish coats shall be as noted on the drawings.
1.9 LOCATION AND SURFACE TYPE TO BE PAINTED
1.9.1 Painting Included
Where a space or surface is indicated to be painted, include the following unless indicated otherwise.
1.9.1.1 Interior Painting
Includes new surfaces, existing uncoated surfaces, and existing coated surfaces of the building(s) and appurtenances as indicated and existing coated surfaces made bare by cleaning operations. Where a space or surface is indicated to be painted, include the following items, unless indicated otherwise.
SECTION 09900 Page 4
1.9.2 Definitions and Abbreviations
1.9.2.1 Batch Quality Conformance Testing
Batch quality conformance testing determines that the product provided is the same as the product qualified to the appropriate product specification.
This testing shall only be accomplished by MPI testing lab.
1.9.2.2 Coating
A film or thin layer applied to a base material called a substrate. A coating may be a metal, alloy, paint, or solid/liquid suspensions on various substrates (metals, plastics, wood, paper, leather, cloth, etc.). They may be applied by electrolysis, vapor deposition, vacuum, or mechanical means such as brushing, spraying, calendering, and roller coating. A coating may be applied for aesthetic or protective purposes or both. The term "coating" as used herein includes emulsions, enamels, stains, varnishes, sealers, epoxies, and other coatings, whether used as primer, intermediate, or finish coat. The terms paint and coating are used interchangeably.
1.9.2.3 DFT or dft
Dry film thickness, the film thickness of the fully cured, dry paint or coating.
1.9.2.4 DSD
Degree of Surface Degradation, the MPI system of defining degree of surface degradation. Five (5) levels are generically defined under the Assessment sections in the MPI Maintenance Repainting Manual.
1.9.2.5 EPP
Environmentally Preferred Products, a standard for determining environmental preferability in support of Executive Order 13101.
1.9.2.6 INT
MPI short term designation for an interior coating system.
1.9.2.7 micron / microns
The metric measurement for 0.001 mm or one/one-thousandth of a millimeter.
1.9.2.8 mil / mils
The English measurement for 0.001 in or one/one-thousandth of an inch, equal to 25.4 microns or 0.0254 mm.
1.9.2.9 MPI Gloss Levels
MPI system of defining gloss. Seven (7) gloss levels (G1 to G7) are…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .