Submittalregister091307.pdf
PDF 151 KB Posted
- Solicitation number
- SP3100-08-B-0001
- Issued by
-
Defense Logistics Agency Distribution
About this file
Submittal Register
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0003SP310008B0001.pdf | ||
| Amendment0002SP310008B0001.pdf | ||
| Amendment0001SP310008B0001.pdf | ||
| Preproposalsitevisitattendancesheetandnotes.pdf | ||
| SF25(PerformanceBond).pdf | ||
| Specifications091307.pdf | ||
| EDCRESTROOMS-DWGS092707.pdf | ||
| SecurityAttachmentsAthroughE.pdf | ||
| SubcontractingPlanFormatVersion072607.doc | DOC document | |
| SF25A(PaymentBond).pdf | ||
| SolicitationSP310008B0001.pdf | ||
| SF24-BidBond.pdf | ||
| DavisBacon.htm | HTM file |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMIT
APPROVAL
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
01011 SPECIAL REQUIREMENTS
SD-01 PRECONSTRUCTION SUBMITTALS
List of Schedule of Values 1.17.1
List of Recycled Materials 2.1
SD-11 CLOSEOUT SUBMITTALS
Dollar Value/Content of Recycled Matl's 2.1
SUBMITTAL REGISTER CONTRACT NO.
TITLE AND LOCATION
DDSP Task Order Construction Services - Division 1 General Requirements CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
01140 WORK RESTRICTIONS
SD-01 PRECONSTRUCTION SUBMITTALS
Special Access Determination Form 1.4.1.5 G
SUBMITTAL REGISTER CONTRACT NO.
TITLE AND LOCATION
DDSP Task Order Construction Services - Division 1 General Requirements CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
01320 PROJECT SCHEDULE
SD-01 PRECONSTRUCTION SUBMITTALS
Project Schedule 3.3 G
SUBMITTAL REGISTER CONTRACT NO.
TITLE AND LOCATION
DDSP Task Order Construction Services - Division 1 General Requirements CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
01330 SUBMITTAL PROCEDURES
SD-01 PRECONSTRUCTION SUBMITTALS
Submittal Register 1.8 G
SUBMITTAL REGISTER CONTRACT NO.
TITLE AND LOCATION
DDSP Task Order Construction Services - Division 1 General Requirements CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
01451 CONTRACTOR QUALITY CONTROL
SD-01 PRECONSTRUCTION SUBMITTALS
Contractor Quality Control Plan 3.2 G
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
SUBMITTAL REGISTER CONTRACT NO.
TITLE AND LOCATION
DDSP Task Order Construction Services - Division 1 General Requirements CONTRACTOR
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
01500 TEMP. CONSTRUCTION FACILITIES
SD-01 PRECONSTRUCTION SUBMITTALS
Site Plan 1.1.1 G
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
SUBMITTAL REGISTER CONTRACT NO.
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
01525 SAFETY AND OCCUPATIONAL HEALTH REQTS.
SD-01 PRECONSTRUCTION SUBMITTALS
Accident Prevention Plan (APP) 1.6 G
Activity Hazard Analysis (AHA) 1.7 G
Occupant Protection Plan 1.6.1 G
SD-06 TEST REPORTS
Accident Reports 1.11.1 G
Monthly Exposure Reports 1.11.3 G
Crane Reports 1.11.4 G
Regulatory Citations and Violations 1.4
SD-07 CERTIFICATES
Confined Space Entry Permit 3.9
Hot Work Permit 1.12
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
SUBMITTAL REGISTER CONTRACT NO.
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
01780 PROJECT CLOSEOUT
SD-02 SHOP DRAWINGS
As-Built Drawings 1.2.1 G
SD-03 PRODUCT DATA
As-Built Record of Equipment and Matls. 1.2.2 G
Warranty Management Plan 1.3.1 G
Warranty Tags 1.3.5
Final Cleaning 1.8 G
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
SUBMITTAL REGISTER CONTRACT NO.
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
06410 LAMINATE CLAD ARCHITECTURAL CASEWORK
SD-02 SHOP DRAWINGS
Shop Drawings 1.3 G
Installation 3.1
SD-03 PRODUCT DATA
Wood Materials 2.1 G
High Pressure Decorative Laminate 2.2 G
SD-04 SAMPLES
Plastic Laminates 2.2 G
SD-07 CERTIFICATES
Quality Assurance 1.4 G
Laminate Clad Casework 2.5.1
SUBMITTAL REGISTER CONTRACT NO.
#REF! CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
07920 JOINT SEALANTS
SD-03 PRODUCT DATA
Sealants 2.1 G
Primers 2.2
Bond breakers 2.3
Backstops 2.4
SD-07 CERTIFICATES
Sealant 3.3.6
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
SUBMITTAL REGISTER CONTRACT NO.
#REF! CONTRACTOR
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
08110 STEEL DOORS AND FRAMES
SD-02 SHOP DRAWINGS
Doors 2.1.1.1 G
Frames 2.3 G
Accessories 2.2
Schedule of doors 1.4 G
Schedule of frames 1.5 G
SD-03 PRODUCT DATA
Doors 2.1.1.1 G
Frames 2.3 G
Accessories 2.2
SUBMITTAL REGISTER CONTRACT NO.
CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
08710 DOOR HARDWARE
SD-02 SHOP DRAWINGS
Hardware schedule 1.3 G
SD-03 PRODUCT DATA
Hardware items 2.3/ Dwg
A-603 G
SD-08 MANUFACTURER'S INSTRUCTIONS
Installation 3.1
SD-10 OPERATION AND MAINTENANCE DATA
Hardware Schedule 1.3 G
SUBMITTAL REGISTER CONTRACT NO.
#REF! CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM APPR
AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
09100 METAL SUPPORT ASSEMBLIES
SD-02 SHOP DRAWINGS
Metal support systems 2.1 G
SD-03 PRODUCT DATA
Materials 2.1 G
SD-08 MANUFACTURER'S INSTRUCTIONS
Materials 2.1
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
09250 GYPSUM BOARD
SD-03 PRODUCT DATA
Cementitious backer units 2.1.8
Gypsum board 2.1.1
Joint treatment materials 2.1.9
Regular Water-Resistant Gypsum Backing Board 2.1.3
Accessories 2.1.14
SD-07 CERTIFICATES
Asbestos Free Materials 2.1 G
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
09310 CERAMIC TILE, QUARRY TILE AND PAVER TILE
SD-02 SHOP DRAWINGS
Detail Drawings 1.7 G
SD-03 PRODUCT DATA
Tile 2.1 G
Setting-Bed 2.2
Mortar, Grout, and Adhesive 2.4 G
SD-04 SAMPLES
Tile 2.1 G
Grout 2.4
SD-06 TEST REPORTS
Testing 3.6 G
SD-07 CERTIFICATES
Tile 2.1 G
Mortar, Grout, and Adhesive 2.4
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
09510 ACOUSTICAL CEILINGS
SD-02 SHOP DRAWINGS
Approved Detail Drawings 1.2 G
SD-03 PRODUCT DATA
Acoustical Ceiling Systems 1.2 G
SD-04 SAMPLES
Acoustical Units 2.1 G
SD-06 TEST REPORTS
Ceiling Attenuation Class and Test 1.3.2 G
SD-07 CERTIFICATES
Acoustical Units 2.1
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
09670 FLUID APPLIED FLOORING
SD-02 SHOP DRAWINGS
Flooring 2.1 G
SD-03 PRODUCT DATA
Sealer and Resin 2.4 G
Floor Surfacing 3.3.2 G
Mixing 3.2 G
SD-04 SAMPLES
Flooring Systems 2.2 G
SD-07 CERTIFICATES
Qualifications of Installer 1.6 G
SD-08 MANUFACTURER'S INSTRUCTIONS
Application 1.2 G
SD-10 OPERATION AND MAINTENANCE DATA
Flooring Systems 1.2 G
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
00990 PAINTS AND COATINGS
SD-03 PRODUCT DATA
Coating 2.1 G
Manufacturer's technical data sheets 2.1 G
Sealant 3.3.5
SD-04 SAMPLES
Manufacturer's samples of paint colors 1.2
SD-07 CERTIFICATES
Applicator's qualifications G
Qualification Testing 1.3.1.2 G
SD-08 MANUFACTURER'S INSTRUCTIONS
Application instructions 1.2
Mixing 1.2
Manufacturer's Material Safety Data Sheets 1.2
SD-10 OPERATION AND MAINTENANCE DATA
Coatings 1.2
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
10153 TOILET PARTITIONS
SD-02 SHOP DRAWINGS
Installation 1.2 G
SD-03 PRODUCT DATA
Toilet Partition System 1.2 G
SD-04 SAMPLES
Finish 2.4 G
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
10440 INTERIOR SIGNAGE
SD-02 SHOP DRAWINGS
Detail Drawings 1.2 G
SD-03 PRODUCT DATA
Installation 1.2 G
SD-04 SAMPLES
Interior Signage 1.2 G
SD-10 OPERATION AND MAINTENANCE DATA
Approved Manufacturer's Instructions 1.2 G
Protection and Cleaning 1.2 G
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM APPR
AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
10675 STEEL SHELVING
SD-01 PRECONSTRUCTION SUBMITTALS
Shelving Units 2.1
SD-03 PRODUCT DATA
Shelving Units 2.1 G
Accessories 2.2 G
Installation instructions 3.2
SD-04 SAMPLES
Finish 2.3 G
SUBMITTAL REGISTER CONTRACT NO.
#REF! CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM APPR
AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
10800 TOILET ACCESSORIES
SD-03 PRODUCT DATA
Finishes 2.1.2 G
Accessory Items 2.2 G
SD-04 SAMPLES
Finishes 2.1.2
Accessory Items 2.2
SD-07 CERTIFICATES
Accessory Items 2.2
SD-10 OPERATION AND MAINTENANCE DATA
Electric Hand Dryer 2.2.15
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM APPR
AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
15400 PLUMBING, GENERAL PURPOSE
SD-02 SHOP DRAWINGS
Plumbing System 3.8.1 G
SD-03 PRODUCT DATA
Flush valve water closets 2.4.3 G
Flush valve urinals 2.4.4 G
Wall hung lavatories 2.4.7 G
Countertop lavatories 2.4.8 G
Drinking-water coolers 2.4.11 G
Plumbing System 3.8.1 G
SD-06 TEST REPORTS
Tests and Flushing 3.8 G
SD-07 CERTIFICATES
Materials and Equipment 1.3
Bolts 2.1.1
SD-10 OPERATION AND MAINTENANCE DATA
Plumbing System 3.8.1 G
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM APPR
AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r ) 15412 Washfountain and components 1.2.2 G G
Operation and Maintenance Manuals 1.2.3 G G
SUBMITTAL REGISTER CONTRACT NO.
CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
15810 SD-01 Preconstruction Submittals 1.5 G G
Diffusers, registers, and grilles; G 1.5 Duct hangers and supports; G 1.5
SD-02 Shop Drawings 1.5 G G
Duct hangers and supports details; G 1.5 SD-03 Product Data 1.5 G G
Dampers; G 1.5 Diffusers, registers, and grilles; G 1.5 Metal ducts; G 1.5 SD-08 Manufacturer's Instructions 1.5 Ductwork and ductwork accessories 1.5
SUBMITTAL REGISTER CONTRACT NO.
CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM APPR
AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
15895 SD-02 Shop Drawings 1.5 G G
Drawings; G 1.5
SD-03 Product Data 1.5 G G
Centrifugal Type Power Roof Ventilator 1.5
Test Procedures 1.5 G G
Diagrams; G 1.5 Operation and Maintenance Training; G 1.5
SD-06 Test Reports 1.5 G G
Performance Tests; G 1.5 Damper Acceptance Test; G 1.5
SD-08 Manufacturer's Instructions 1.5 G G
Manufacturer's Installation Instructions; G 1.5 Operation and Maintenance Training 1.5
SD-10 Operation and Maintenance Data 1.5 G G
Operation and Maintenance Manuals; G 1.5 Centrifugal Type Power Roof Ventilator 1.5
SUBMITTAL REGISTER CONTRACT NO.
CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM APPR
AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
15990 SD-02 Shop Drawings 1.2 G G
TAB Schematic Drawings and Report Forms; G 1.2
SD-03 Product Data 1.2 TAB Related Exhaust System Submittals 1.2 TAB Procedures; G 1.2 G G
Calibration 1.2 Systems Readiness Check 1.2 TAB Execution; G 1.2 G G
TAB Verification; G 1.2 G G
SD-06 Test Reports 1.2 G G
Systems Readiness Check; G 1.2 TAB Report; G 1.2 TAB Verification Report; G 1.2
SD-07 Certificates 1.2 TAB Firm; G 1.2 G G
TAB Specialist; G 1.2 G G
SUBMITTAL REGISTER CONTRACT NO.
CONTRACTOR
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM APPR
AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
16402 INTERIOR DISTRIBUTION SYSTEM
SD-03 PRODUCT DATA
Receptacles 2.14
Circuit breakers for Panelboards 2.15.3
Switches 2.12
SD-06 TEST REPORTS
600-volt wiring test 3.5.2 G
Grounding system test 3.5.5 G
Ground-fault receptacle test 3.5.4
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )
16510 INTERIOR LIGHTING
SD-03 PRODUCT DATA
Fluorescent lighting fixtures 2.1 G
Fluorescent electronic ballasts 1.6.1 G
Fluorescent lamps 2.1.6 G
Occupancy sensors 2.17 G
SD-06 TEST REPORTS
Operating test 3.3
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FROM
APPR AUTH REMARKS
P A R A G R A P H
N O
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W R
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C
T DESCRIPTION OF ITEM SUBMITTED
| DIV01SPECsubmittal reg.pdf |
| DIV06SPECsubmittal reg.pdf |
| DIV07SPECsubmittal reg.pdf |
| DIV08SPECsubmittal reg.pdf |
| DIV08-2submittal reg.pdf |
| DIV09SPECsubmittal reg.pdf |
| DIV10-1SPECsubmittal reg.pdf |
| DIV10SPECsubmittal reg.pdf |
| DIV15SPECsubmittal reg.pdf |
| DIV16SPECsubmittal reg.pdf |
File details come from the government source that posted it. Updated .