Amendment0001SP310008B0001.pdf

PDF 2 MB Posted

Attached to
Repair and Upgrade Restrooms, Building 2001, Defense Distribution Center Susquehanna (DDSP), New Cumberland PA 17070
Solicitation number
SP3100-08-B-0001
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
Amendment0003SP310008B0001.pdf PDF
Amendment0002SP310008B0001.pdf PDF
Preproposalsitevisitattendancesheetandnotes.pdf PDF
SF25(PerformanceBond).pdf PDF
Specifications091307.pdf PDF
EDCRESTROOMS-DWGS092707.pdf PDF
SecurityAttachmentsAthroughE.pdf PDF
SubcontractingPlanFormatVersion072607.doc DOC document
SF25A(PaymentBond).pdf PDF
SolicitationSP310008B0001.pdf PDF
SF24-BidBond.pdf PDF
Submittalregister091307.pdf PDF
DavisBacon.htm HTM file
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

SP3100-08-B-0001

Amendment 0001

Amendment 0001 is hereby incorporated into solicitation SP3100-08-B-0001 and shall become part of any contract.

Amendment 0001 is being issued to provide answers to questions received.

Question 1: Drawing A-107 restroom 12M, shows a bench marked as 6’-0” long. The bench scales as a 9’-0” Bench. Please clarify.

Answer 1: The bench is 9’-0” and should be replaced with the same size bench. The drawing is revised as Addendum 1 dated 11/23/07 and attached to this amendment.

Question 2: Drawing A-501 has a locker detail. Please confirm this is of existing condition only and does not reflect any new construction to be done. Note 1: Below the detail states “Existing construction detail shown for reference only.”

Answer 2: The detail is shown only for existing condition of how the lockers were installed.

There is no new construction to be done.

Question 3: Drawing M-109, note 3 states “contractor shall reuse Existing electrical wiring and Curb for exhauster. Drawing M-501, detail of Roof Mounted Centrifugal Exhaust Fan, has a note: “Curbs and fans shall be from the same manufacture. Please clarify what curbs, if any, are to be replaced.

Answer 3: All curbs shall remain. M-109 shows the size of the existing curbs. Contractor shall be responsible for providing and installing the proper size exhauster to fit the curb and still meet the requirements of the fans. Existing fans were manufactured by “Carnes Inc.”.

Question 4: Please confirm all existing exhaust fans are to be removed as part of the contract.

Answer 4: Yes, all the fans shall be removed and replaced with fans that meet the requirements in the fan schedule.

Question 5: Please provide a specification, including a make and model number, for the Mixing Valve Assembly shown on drawing M-501.

Answer 5: Please refer to Plumbing specification 15400 Section 2.3.1. The existing valves are manufactured by “Symmons Industries Inc.” model 5-700B.

Question 6: Drawing A-603, The Door and frame schedule, does not include door 211A thru 215 for restroom 3. Please provide information for these doors and frames.

Answer 6: The PDF file for sheets A-603 and A-602 did not copy properly. Both of these sheets are attached to this amendment. Attached sheets shall replace original sheets A-603 and A-602.

Question 7: The finish Schedule calls for the Ceramic Tile Cove Base in the locker rooms. Is the existing ceramic tile base in the locker rooms to be replaced with new?

Answer 7: Yes, the ceramic tile base is to be replaced.

Question 8: Doors 211A, 212, 214, & 215 are all shown on the floor plan in restroom # 3;

however they are not shown on the door schedule. Please provide details on previously mentioned doors.

Answer 8: See revised drawing A-603.

Question 9: Door 153 is shown on the door schedule as being in bathroom # 15; however door 153 is not shown on the floor plans. Please clarify.

Answer 9: The door is now identified on revised sheet A-108.

Question 10: The finish schedule on drawing A-602 show bathroom # 12, room DC-315, as being the women’s toilet; however the floor plans show this room DC-315 as being the men’s toilet room. Same applies vice versa for room DC-319.

Answer 10: The finish schedule is correct. The drawing is revised to show the correct room numbers.

Question 11: The finish schedule on drawing A-602 shows room DC-315 in bathroom # 12 keeping the existing wall tiles, however the demo drawings show the existing wall tiles to be removed. Is this bathroom to get new wall tile or existing to remain?

Answer 11: The restroom is to receive new wall tile. The drawing is revised.

Question 12: On drawing A-201, sheet 15 of 57, the typical wall pattern detail shows two colors for the wall tile. What is the group number for wall tile color 1 and color 2?

Answer 12: The PEI group number for wall tile falls within 1 or 2, color 1 and color 2 only define the pattern. The group ratings are only meant to measure durability and appropriate usage and has nothing to do with the quality or price of ceramic tile.

Question 13: Will the use of propane powered forklifts be permitted inside the building for handling of materials?

Answer 13: No, only electric powered forklifts will be permitted.

Question 14: Please provide a specification for the vinyl composition tile and resilient base.

Answer 14: specification 09650 Resilient flooring is attached.

Question 15: Drawing A-301 details H and G are showing fiberglass reinforced panels. I cannot find any specs on these panels in the documents. Please forward specifications on the fiberglass reinforced panels.

Answer 15: Use Glasbord Specification 6226 or equivalent. A copy is attached.

Question 16: Please provide hardware sets for Door in rooms 14 thru 19.

Answer 16: See revised drawing A-603.

Question 17: Please provide us with the approx. height of the existing main exhaust ductwork located above the drywall ceiling. Does this ductwork run close to the existing gypsum ceiling or up near the roof deck?

Answer 17: Our record drawings do not indicate the actual location of ductwork relative to the ceiling or restroom roof deck. Distance between ceiling and restroom roof deck is approx. 4’- 6’+/- .

Question 18: Please provide the correct height from finished floor to the roof deck at the main floor area and the mezzanine area. This is important to the HVAC contractors in order to determine accurate material for the ductwork needed with the new exhaust fans installation.

Answer 18: The distribution roof deck is approx. 30’+/- from the main floor area. The mezzanine floor level is approx 15’+/- from the main floor area.

Question 19: Are the ceramic tile floor areas going to need patched at the areas where new benches and pedestals are to be installed?

Answer 19: Refer to sheet A-100 note # 3 under the general construction note.

Question 20: Drawing A-502,shelf and mop rack detail, show a shelf. This shelf does not appear on the accessories schedule. Please provide a specification for this shelf and the locations to be installed.

Answer 20: The detail provides the mounting requirements for the shelving and mop rack.

Refer to sheet A-603 schedule items 12 and 13 for shelving units. Locations are shown on the architectural drawings. Refer to specification section 10675 for shelving.

Question 21: Drawing A-100, General Construction note 7, indicates the shelving units shall consist of wood shelves. Please indicate a type of wood and the finish for these shelves.

Answer 21: Refer to Specification Section 06410 paragraphs 2.1 or 2.1.2.1.

Question 22: Please indicate the type and color of ceramic tile and ceramic tile cove base to be used on this project.

Answer 22: The type and color of the tile and base shall be selected during the submittal process.

Question 23: Please indicate the type and the color of grout to be used on this project.

Answer 23: The type and color of grout shall be selected during the submittal process.

Question 24: On Electrical drawings E-107 and E-109, bathrooms # 8 and 19, there are new door openers at the entrances. Are there any specs on these door openers?

Answer 24: Use the specifications for Stanley Magic Access swing door operator or equivalent.

Question 25: On the door schedule, bathrooms 14 thru 19 state that new hardware is to be provided, however, the hardware set number is not provided. Please provide hardware sets for all doors.

Answer 25: Drawing A-603 revised.

Question 26: In restroom 3, doors 211 and 219 on door schedule have incomplete info. Are these doors existing to remain with new hardware?

Answer 26: Previously answered. Reprinted drawing.

Question 27: On the floor plans, there are several wall denoted as being wall type F*. There is no F* on the drawings A-301 and I cannot find a note as to the meaning of the *. What does the

* mean?

Answer 27: The * identifies walls that have ceramic tile on the locker room side instead of vinyl wall base in the foyer. A note will be added to the drawing.

Question 28: In restroom # 3, room DC-215, there is a toilet accessory # 14, trashcan, in the middle of the room. The restroom already contains a trashcan. Is there supposed to be two trashcans in this particular restroom?

Answer 28: Symbol removed, no trash can required in the middle of the room.

Question 29: In restroom # 4, room DC-194, there is a mop rack with the designation of accessory # 6, should this be and 8?

Answer 29: Designation number changed to 8.

Question 30: In restroom # 7, room DC-204, there are two toilet seat cover dispensers shown on the drawing but there is no number designation, are these existing dispensers?

Answer 30: Those are new dispensers. Designation number added.

Question 31: In restroom # 12, room DC-315, there is a mirror depicted on the wall with no designation. I believe it is a # 11 which is to be reinstalled, is this a correct assumption?

Answer 31: Designation added.

Question 32: In the Fixture schedule, they are calling for a Sloan # 111 ES-S flush valve for both the Handicap and standard toilets. We know from the site visit that the roughins currently in place are a lot higher. The specified flush valve is to short to fit in the existing bathroom configuration, my suggestion is to use a model # Sloan 115 ES-S Optima flush valve for the Handicap toilets, and use a model # Sloan 116 ES-S Optima flush valve for the Standard toilets.

Answer 32: Drawing M-501 will be changed to reflect Sloan 115 ES-S and Sloan 116 ES-S flush valves for the toilets.

Question 33: Below is a list of standard selections for the Wash Fountains, some more information as to what selections they would prefer for these sinks would be helpful in pricing.

Also a color specification, there are many to choose from that are standard colors. I will attach there website to make it easier to view.

Answer 33: Below is the list of standard options for the wash fountains:

Trap Enclosure/Pedestal:

STD Pedestal - Standard Height 34" Rim Drain Type:

A Off-line vent with supplies from below Controls IR Adaptive Infrared Activation Valve:

TMA Thermostatic Mixing Valve Soap Dispenser:

LSD* Liquid Soap Dispenser

Question 34: On detail partition type E, on drawing A-301, there is a note that says lockers are to be painted on interior and exterior, however on drawing A-502, typical locker detail, just the exterior is noted to be painted. Which is correct?

Answer 34: Drawing A-502 is correct. Paint only the exteriors of the wall lockers.

The proposal due date and time is hereby extended from December 6, 2007 to December 13, 2007, 2:00 PM.

The following attachments are incorporated:

Drawing A105 Addendum 1 dated 11/28/07 Drawing A106 Addendum 1 dated 11/28/07 Drawing A107 Addendum 1 dated 11/23/07 Drawing A108 Addendum 1 dated 11/27/07 Drawing A301 Addendum 1 dated 12/4/07 Drawing A602 Addendum 1 dated 11/27/07 Drawing A603 Addendum 1 dated 11/28/07 Drawing M501 Addendum 1 dated 11/27/07 Specification Section 09650 Resilient Flooring Glasbord Technical Data 6226 Specification

All other terms and conditions remain unchanged.

END OF AMENDMENT 0001

SECTION 09650 Page 1

SECTION 09650

RESILIENT FLOORING

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D 4078 (2002) Water Emulsion Floor Polish

ASTM E 648 (2003) Critical Radiant Flux of Floor-

Covering Systems Using a Radiant Heat Energy Source

ASTM F 1066 (1999) Vinyl Composition Floor Tile

ASTM F 1303 (2002) Sheet Vinyl Floor Covering with

Backing

ASTM F 1344 (2003a) Rubber Floor Tile

ASTM F 1482 (2003) Installation and Preparation of Panel

Type Underlayments to Receive Resilient Flooring

ASTM F 1700 (1999) Solid Vinyl Floor Tile

ASTM F 1859 (2003) Rubber Sheet Floor Covering Without

ASTM F 1860 (2003) Rubber Sheet Floor Covering With

ASTM F 1861 (2002) Resilient Wall Base

ASTM F 1869 (1998) Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride

ASTM F 2034 (2003) Sheet Linoleum Floor Covering

ASTM F 2169 (2002) Resilient Stair Treads

ASTM F 2170 (2002) Determining Relative Humidity in

Concrete Floor Slabs in situ Probes

ASTM F 2195 (2003) Linoleum Floor Tile

SECTION 09650 Page 2

ASTM F 710 (2003) Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring

1.2 FIRE RESISTANCE REQUIREMENTS

Flooring in corridors and exits shall have a minimum average critical radiant flux of 0.22 watts per square centimeter when tested in accordance with ASTM E 648.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01330

SUBMITTAL PROCEDURES:

SD-03 Product Data

Resilient Flooring and Accessories

Manufacturer's descriptive data.

Adhesives; G

Manufacturer's descriptive data, documentation stating physical characteristics, and mildew and germicidal characteristics.

Material Safety Data Sheets (MSDS) for all primers and adhesives shall be provided to the Contracting Officer. Highlight VOC emissions.

SD-04 Samples

Three samples of each indicated color and type of flooring, base, mouldings, and accessories. Sample size shall be minimum 2-1/2 x 4 inches.

SD-06 Test Reports

Moisture, Alkalinity and Bond Tests; G

Copy of test reports of moisture and alkalinity content of concrete slab, and bond test stating date of test, person conducting the test, and the area tested.

SD-08 Manufacturer's Instructions

Surface Preparation Installation

Manufacturer's printed installation instructions for all flooring materials and accessories, including preparation of substrate, seaming techniques, and recommended adhesives.

SD-10 Operation and Maintenance Data

SECTION 09650 Page 3

Data Package 1 in accordance with Section 01780 CLOSEOUT

PROCEDURES.

1.4 DELIVERY AND STORAGE

Materials shall be delivered to the building site in original unopened containers bearing the manufacturer's name, style name, pattern color name and number, production run, project identification, and handling instructions. Materials shall be stored in a clean dry area with temperature maintained above 68 degrees F and below 85 degrees F, and shall be stacked according to manufacturer's recommendations. Materials shall be protected from the direct flow of heat from hot-air registers, radiators and other heating fixtures and appliances. Do not open containers until materials are to be used, except for verification inspection. Observe ventilation and safety procedures specified in the MSDS.

1.5 ENVIRONMENTAL REQUIREMENTS

Areas to receive resilient flooring shall be maintained at a temperature above 68 degrees F and below 85 degrees F for 2 days before application, during application and 2 days after application, unless otherwise directed by the flooring manufacturer for the flooring being installed. A minimum temperature of 55 degrees F shall be maintained thereafter. Observe ventilation and safety procedures specified in the MSDS. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.

1.6 SCHEDULING

Resilient flooring application shall be scheduled after the completion of other work which would damage the finished surface of the flooring.

1.7 WARRANTY

Manufacturer's standard performance guarantees or warranties that extend beyond a one year period shall be provided.

1.8 EXTRA MATERIALS

Extra flooring material of each color and pattern shall be furnished at the rate of 5 tiles for each 1000 tiles and 5 square feet for each 1000 square feet of sheet flooring installed. Extra wall base material composed of 20 linear feet of each type, color and pattern shall be furnished. All extra materials shall be packaged in original properly marked containers bearing the manufacturer's name, brand name, pattern color name and number, production run, and handling instructions. Extra materials shall be from the same lot as those installed. Leave extra stock at site in location as directed by Contracting Officer.

PART 2 PRODUCTS

2.1 VINYL COMPOSITION TILE

Vinyl-composition tile shall conform to ASTM F 1066, Class 2, (through pattern tile), Composition 1, asbestos-free, and shall be 12 inches square

SECTION 09650 Page 4 and 1/8 inch thick. Tile shall have the color and pattern uniformly distributed throughout the thickness of the tile.

2.2 WALL BASE

Base shall conform to ASTM F 1861, Type TS vulcanized thermoset rubber coved. Base shall be 4 inches high and a minimum 1/8 inch thick. Job formed corners in matching height, shape, and color shall be furnished.

2.3 ADHESIVES

Adhesives for flooring, base and accessories shall be as recommended by the manufacturer and comply with local indoor air quality standards.

2.4 SURFACE PREPARATION MATERIALS

Surface preparation materials, such as panel type underlayment, lining felt, and floor crack fillers shall be as recommended by the flooring manufacturer for the subfloor conditions. Panel type underlayment products shall comply with ASTM F 1482.

2.5 POLISH/FINISH

Polish shall be as recommended by the manufacturer and conform to ASTM D 4078.

2.6 CAULKING AND SEALANTS

Caulking and sealants shall be in accordance with Section 07920 JOINT

SEALANTS.

2.7 MANUFACTURER'S COLOR, PATTERN AND TEXTURE

Color, pattern and texture for resilient flooring and accessories shall be selected from manufacturer’s standard colors. Flooring in any one continuous area or replacement of damaged flooring in continuous area shall be from same production run with same shade and pattern.

PART 3 EXECUTION

3.1 EXAMINATION/VERIFICATION OF CONDITIONS

The Contractor shall examine and verify that site conditions are in agreement with the design package and shall report all conditions that will prevent a proper installation. The Contractor shall not take any corrective action without written permission from the Government. Work will proceed only when conditions have been corrected and accepted by the installer.

3.2 SURFACE PREPARATION

Flooring shall be in a smooth, true, level plane, except where indicated as sloped. Floor shall be flat to within 3/16 inch in 10 feet. Subfloor shall be prepared in accordance with flooring manufacturers recommended instructions. The surfaces of lightweight concrete slabs (as defined by the flooring manufacturer) shall be prepared as recommended by the flooring

SECTION 09650 Page 5 manufacturer. Concrete subfloor preparation shall comply with ASTM F 710.

Floor fills or toppings may be required as recommended by the flooring manufacturer. Underlayments when required by the flooring manufacturer shall be installed in accordance with manufacturer's recommended installation instructions. Panel type underlayments shall comply with ASTM F 1482. Before any work under this section is begun, all defects such as rough or scaling concrete, chalk and dust, cracks, low spots, high spots, and uneven surfaces shall have been corrected, and all damaged portions of concrete slabs shall have been repaired as recommended by the flooring manufacturer. Concrete curing and sealer compounds, other than the type that does not adversely affect adhesion, shall be entirely removed from the slabs. Paint, varnish, oils, release agents, sealers, waxers, and adhesives shall be removed, as recommended by the flooring manufacturer.

3.3 MOISTURE, ALKALINITY AND BOND TESTS

The suitability of the concrete subfloor for receiving the resilient flooring with regard to moisture content and pH level shall be determined by moisture and alkalinity tests and shall comply with manufacturer’s recommendations. Moisture testing shall be in accordance with ASTM F 1869 or ASTM F 2170 unless otherwise recommended by the flooring manufacturer.

Alkalinity testing shall be as recommended by the flooring manufacturer.

The compatibility of the resilient flooring adhesives to the concrete floors shall be determined by a bond test in accordance with the flooring manufacturer’s recommendations.

3.4 PLACING VINYL-COMPOSITION TILE, LINOLEUM TILE AND SOLID VINYL TILE

Tile flooring and accessories shall be installed in accordance with manufacturer's installation instructions. Adhesives shall be prepared and applied in accordance with manufacturer's directions. Tile lines and joints shall be kept square, symmetrical, tight, and even. Keep each floor in true, level plane, except where slope is indicated. Edge width shall vary as necessary to maintain full-size tiles in the field, but no edge tile shall be less than one-half the field tile size, except where irregular shaped rooms make it impossible. Flooring shall be cut to, and fitted around, all permanent fixtures, built-in furniture and cabinets, pipes, and outlets. Edge tile shall be cut, fitted, and scribed to walls and partitions after field flooring has been applied.

3.5 PLACING MOULDING

Provide moulding where flooring termination is higher than the adjacent finished flooring and at transitions between different flooring materials.

When required, locate moulding under door centerline. Moulding is not required at doorways where thresholds are provided. Moulding shall be secured with adhesive as recommended by the manufacturer. Adhesives shall be prepared and applied in accordance with manufacturer’s directions.

3.6 PLACING WALL BASE

Wall base shall be installed in accordance with manufacturer's installation instructions. Adhesives shall be prepared and applied in accordance with manufacturer’s directions. Base joints shall be tight and base shall be even with adjacent resilient flooring. Voids along the top edge of base at

SECTION 09650 Page 6 masonry walls shall be filled with caulk. Roll entire vertical surface of base with hand roller, and press toe of base with a straight piece of wood to ensure proper alignment. Avoid excess adhesive in corners. Voids along the top edge of base at masonry walls shall be filled with caulk.

3.7 CLEANING

Immediately upon completion of installation of flooring in a room or an area, flooring and adjacent surfaces shall be dry-cleaned to remove all surplus adhesive. Clean flooring as recommended in accordance with manufacturer's printed maintenance instructions. No sooner than 5 days after installation, flooring shall be washed with a nonalkaline cleaning solution, rinsed thoroughly with clear cold water, and, except for rubber flooring and stair treads, risers and stringers, vinyl and other flooring not requiring polish by manufacturer, given the number of coats of polish in accordance with manufacturers written instructions. All other flooring shall be cleaned and maintained as recommended by the manufacturer.

3.8 PROTECTION

From the time of laying until acceptance, flooring shall be protected from damage as recommended by the flooring manufacturer. Flooring which becomes damaged, loose, broken, or curled and wall base which is not tight to wall or securely adhered shall be removed and replaced.

-- End of Section --

Product Fire-X Glasbord with Surfaseal is made of fiberglass reinforced plastic. It is a durable, flexible building material and will not mold, mildew, rot, or corrode. It exhibits excellent resistance to mild chemicals and moisture. The panel has a Class A (1) rating for flame spread and smoke development.

Surfaseal Finish Surfaseal is a unique surface treatment that, when compared to ordinary frp, exhibits up to ten times the cleanability, six times the stain resistance, and twice the abrasion resistance.

Purpose Fire-X Glasbord embossed panels are designed for interior wall finishes where a Class A, sanitary, easy-to-clean panel is desired. Where Factory Mutual Approval is needed, refer to technical data sheet #6223.

PHYSICAL PROPERTIES: TABLE 1

DESIGN DATA: TABLE 2

PROPERTY

TYPICAL VALUE

TEST METHOD

0.09" (2.3 mm) 0.12" (3.0 mm)

Flexural Strength 13.6 x 103 psi 94 MPa

14.6 x 103 psi 101 MPa ASTM D790

Flexural Modulus 0.60 x 106 psi 4137 MPa

0.70 x 106 psi 4826 MPa ASTM D790

Tensile Strength 7.1 x 103 psi 49 MPa

7.5 x 103 psi 52 MPa ASTM D638

Tensile Modulus 0.80 x 106 psi 5516 MPa

0.80 x 106 psi 5516 MPa ASTM D638

Barcol Hardness 45 40 ASTM D2583

Izod Impact Strength 14 ft-lb/in notched

0.75 J/mm

14 ft-lb/in notched

0.75 J/mm ASTM D256

Gardner Impact Strength 45 in-lbs

5.1 J

45 in-lbs

5.1 J ASTM D3029

Coefficient of Linear Thermal Expansion 1.7 x 10-5 in/in•°F 31 µm/m•°C

1.7 x 10-5 in/in•°F 31 µm/m•°C ASTM D696

Water Absorption 0.32%/24 hrs@77°F (25°C)

0.32%/24 hrs@77°F

(25°C) ASTM D570

R Value 0.23 hr•ft2•°F/Btu

0.047 hr•ft2•°C/Kcal

0.30 hr•ft2•°F/Btu

0.061 hr•ft2•°C/Kcal ASTM C1114

Surface Burning Characteristics Class A Class A ASTM E84

Taber Abrasion Resistance (cs-17 wheels, 1000 g. wt., 25 cycles)

0.020% max wt loss 0.030% max wt loss Taber Test

TECHNICAL DATA

Rev. 15 8/05 www.glasbord.com

PART NUMBER

IDENTIFIER

AVAILABLE

COLORS SIZE FINISH NOMINAL

THICKNESS

FX

85 white 83 colonial white

70 beige 48 pearl gray

84 ivory 66 silver

4' x 8', 9', 10', 12' (1.2m x 2.4m, 2.7m, 3.0m, 3.7m)

2' x 2' and 2' x 4' grid systems (0.6m x 0.6m and 0.6m x 1.2m) grid systems (for 0.12" panels only) embossed

0.09" (2.3 mm)

85 white 0.12" (3.0 mm)

Other lengths, widths, and colors available by quotation.

FX

GLASBORD EMBOSSED WALL & CEILING PANEL

CLASS A FIRE RATING AS TESTED PER ASTM E-84

SPECIFICATIONS

These panels are manufactured by a continuous laminating process in lengths as required.

COMPOSITION

1. Reinforcement: Random chopped fiberglass roving.

2. Resin mix: Modified polyester copolymer and inorganic fillers and pigments.

FINISHED PANEL QUALITY

1. Panels shall have a wear side with a pebble-like embossed finish. Color shall be uniform throughout, as specified.

Other colors can be manufactured. The backside shall be smooth. Backside imperfections that do not affect functional properties are not cause for rejection.

2. Physical properties shall be as set forth in Table 1.

3. Product quality standards and tolerances for panel weight and thickness shall be as set forth in Kemlite’s Quality Control Procedures/Standards which are available on request.

4. Dimensions shall be as specified on purchase order, subject to the following tolerances:

Width: ±1/8" (3.2 mm) Length: ±1/8" (3.2 mm) up to 12' (3.7 m) Squareness: not more than 1/8" (3.2 mm) out of square.

5. Panels shall be installed in accordance with manufacturer's guidelines as set forth in the Glasbord "Installation Guide."

6. Bulk Coil Policy #6207 applies for coils for lamination.

CERTIFICATION

A. Meets USDA/FSIS requirements.

B. Meets minimum requirements of major model building codes for Class A (1) interior wall and ceiling finishes.

Flame spread less than 25, smoke developed 450 or less (as tested per ASTM E-84).

C. ICBO Report #ER-4583.

D. Product identified by two red and one blue thread on backside of the panel. Two Translucent Plastic Threads with Fluorescent Pigment Design® on the front identify Fire-X Glasbord.

E. Frp does not support mold or mildew (as tested per ASTM D3273 and ASTM D3274).

F. UL Classified (0.09" only).

G. MEA Approved. MEA 16-85M. VOL. II.

H. Meets Canadian code CAN/ULC-S102 of ≤25 flame spread and ≤300 smoke developed.

FABRICATING RECOMMENDATIONS

Note: Protect your eyes with goggles; cover your nose and mouth with a filter mask when cutting Glasbord panels.

Hand fabricating: Drilling—High speed drill bit (60° cutting angle, with 12°-15° clearance) or hole saw.

Stapling: Standard pneumatic stapler.

Cutting: Sheet metal shears or circular saw with reinforced carborundum or carbide-tipped blade.

Production fabricating: Use carbide-tipped tools. Straight cuts can be sheared (90° cutting edge with 0.002" [0.05 mm] clearance) or sawed. For irregular cuts, use die punch or band saw.

STORAGE

All Kemlite products should be stored indoors.

SERVICEABLE TEMPERATURE RANGE

Panels will perform in temperatures from -40°F (-40°C) to 130°F (54°C). For use in environments beyond this range, contact Kemlite for recommendations.

PRODUCT LIMITATIONS

Near heat source: Glasbord panel products may discolor when installed near a heat source which radiates temperatures exceeding 130°F (55°C) such as cookers, ovens, and deep fryers.

Uneven surface: Installation over uneven concrete block walls may result in areas of delamination and bulging.

KEMLITE TESTING

Cleanability test: When Glasbord with Surfaseal and an ordinary frp panel are heavily soiled, the Glasbord panel exhibits up to 10 times more cleanability per MacBeth Computer Colorimeter.

Stain resistance test: Prolonged direct contact to concentrated ammonia-based cleaner exhibited no color change per MacBeth Computer Colorimeter.

NOTICE

Panels will provide a clean, aesthetically-pleasing finished installation. However, by nature, fiberglass reinforced plastic paneling may occasionally have small areas that are aesthetically unacceptable for use. Panels should be inspected on-site prior to installation. If any portion of material will not provide an acceptable appearance, Kemlite should be notified at once. Upon verification of unacceptability, that portion of material will be replaced by Kemlite. Kemlite’s sole responsibility is for the replacement of defective material but not for labor or other handling or installation expenses.

We believe all information given is accurate. It is offered in good faith, but without guarantee. Since conditions of use are beyond our control, all risks are assumed by the user. Nothing herein shall be construed as a recommendation for uses which infringe on valid patents or as extending a license under valid patents.

Additional Information Available:

- #6211 Installation Guide

- CSI Specifications

- #6220 Accessories Tech Data

FLAME SPREAD AND SMOKE DEVELOPMENT RATINGS

The numerical flame spread and smoke development ratings are not intended to reflect hazards presented by Kemlite products or any other material under actual fire conditions. These ratings are determined by small-scale tests conducted by Underwriters Laboratories and other independent testing facilities using the American Society for Testing and Materials E-84 test standard (commonly referred to as the "Tunnel Test"). KEMLITE PROVIDES THESE RATINGS FOR MATERIAL COMPARISON PURPOSES ONLY. Like other organic building materials (e.g. wood), panels made of fiberglass reinforced plastic resins will burn. When ignited, frp may produce dense smoke very rapidly. All smoke is toxic. Fire safety requires proper design of facilities and fire suppression systems, as well as precautions during construction and occupancy. Local codes, insurance requirements and any special needs of the product user will determine the correct fire-rated interior finish and fire suppression system necessary for a specific installation.

1• 800 • 435 • 0080 ph.

1• 815 • 467 • 8600 ph.

1• 815 • 467 • 8666 fax www.glasbord.com

Kemlite, Glasbord, Fire-X Glasbord, Surfaseal, and Translucent Plastic Thread with Fluorescent Pigment Design are registered trademarks of Kemlite Company, Inc. Form 6226 Rev. 15 (2049)

ADP21A.tmp
Question 29: Drawing Sheet 7 Building 1
Statement – Question
Question 30: Drawing Sheet 7 Building 1 Zone 2, Zone 3, and Zone 5
ADP10.tmp
Question 29: Drawing Sheet 7 Building 1
Statement – Question
Question 30: Drawing Sheet 7 Building 1 Zone 2, Zone 3, and Zone 5
ADP1D.tmp
Question 29: Drawing Sheet 7 Building 1
Statement – Question
Question 30: Drawing Sheet 7 Building 1 Zone 2, Zone 3, and Zone 5
IDCode:
Page: 1
Pages: 6
AmendNo: 0001
EffDate: 03 DEC 2007
ReqNo: SEE SCHEDULE
ProjNo:
IssCode: SP3100
IssuedBy: DEFENSE DISTRIBUTION CENTER

ACQUISITION OPERATION DDC-AB

2001 MISSION DR BLDG 81

NEW CUMBERLAND PA 17070-5001

AdmCode: DAKADM
AdminBy: DONNA KAUTZ

717-770-6563 FX 717-770-7591

donna.kautz@dla.mil

ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolAmdNo: SP3100-08-B-0001
AmendDate: 06 NOV 2007
ModNo:
ModDate: 05 JUL 20
NoCopies: 1
Amended: Yes
ApprData:
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript: SEE PAGES 2-6
SignName:
SignTitl:
ContDate:
CoName:
CoTitle:
CODate:
SolChgYs: Yes
SolChgNo: Off
OffrExt: Yes
OffrNoEx: Off
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off

File details come from the government source that posted it. Updated .