Amendment_0003_FBO.pdf
PDF 75 KB Posted
- Solicitation number
- SP0600-14-R-0162
- Issued by
-
Defense Logistics Agency Energy
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Summary_of_Award.pdf | ||
| Min_Cost_Solution_Bid_Award_Sheet.pdf | ||
| Min_Laid-Down_Cost_Solution_Contractor_Summary.pdf | ||
| Amendment_0006_FBO.pdf | ||
| Amendment_5_FBO.pdf | ||
| Amendment_0004_FBO.pdf | ||
| Amendment_2_FBO.pdf | ||
| Amendment_0001_SP0600-14-R-0162.pdf | ||
| Attachment_1_to_OSP.pdf | ||
| 14R0162_ADD_PKG_.pdf | ||
| 14R0162_Solicitation.pdf | ||
| 14R0162_OSP_.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
SP0600
Lorena Montenegro
This amendment is available at www.fbo.gov.
See continuation pages.
ATTN: A. WARBURTON DLA ENERGY FEBAB RM 2946
DEFENSE LOGISTICS AGENCY ENERGY
8725 JOHN J KINGMAN RD SUITE 4950
FT BELVOIR VA 22060-6222
PHONE: (703) 767-9271/FAX: (703) 767-9271
SP0600-14-R-0162
1 11
06/20/2014
04/03/2014
Amendment 0003
Block 14 Continued
A. B-0001 B1 SUPPLIES TO BE FURNISHED (BULK) (DLA ENERGY MAR 2009) is hereby corrected as follows:
Reference Line Item 0009, Fairchild AFB, WA – TRUCK mode is hereby deleted.
B. Contract provision F1.08-3 DELIVERY AND CONTRACT PERIODS FOR TANKER
AND BARGE DELIVERIES (DOMESTIC BULK) (DLA ENERGY JAN 2012) is hereby incorporated as follows:
F1.08-3 DELIVERY AND CONTRACT PERIODS FOR TANKER AND BARGE
DELIVERIES (DOMESTIC BULK) (DLA ENERGY JAN 2012)
(a) The period of this contract during which the Ordering Officer may order pursuant to the DELIVERY-ORDER LIMITATIONS - SCOPE OF CONTRACT clause is from date of award through September 30, 2015.
(b) Notwithstanding (a) above, except at its option, the Contractor shall not be required to make delivery hereunder prior to Date of Award.
(c) Insofar as practicable, the Government will attempt to lift in approximately equal monthly quantities. Except at its option, a supplier which offered product over the period Date of Award through September 30, 2015 shall not be required to accumulate any such product at any such location and to subsequently make deliveries in excess of 33.33% in any one month of the contract quantity of the applicable grade of product; provided, however, that where the maximum quantity available for individual deliveries as specified in the contract is greater than 8.33 percent per month, the supplier will accumulate any such product at any such location and subsequently make deliveries equal to the specified maximum quantity available for individual deliveries and, provided further, that the supplier will be required to make delivery in excess of 8.33% per month if the delivery is to be made f.o.b. tanker at origin and no other quantities have been ordered for delivery during the applicable month and the 30,000 barrels minimum, under (d) below, is greater than such 8.33% quantity.
(d) Except at its option, the Contractor shall not be required to deliver f.o.b. tanker at origin in any one delivery a quantity of product(s) less than 30,000 barrels, except when the minimum quantity available for individual deliveries as specified in the contract is less than 30,000 barrels, or when on the last delivery, the quantity available pursuant to the DELIVERY- ORDER LIMITATIONS - SCOPE OF CONTRACT clause is less than 50,000 barrels.
C. Contract provision F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA
ENERGY) (APR 2014) is hereby incorporated as follows:
F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY) (APR 2014)
THIS PROVISION ONLY APPLIES TO DLA FUNDED LINE ITEMS.
(a) Contractor Registration. Contractors must register in DIBBS to obtain a login account at https://www.dibbs.bsm.dla.mil. The login account will allow a contractor to register a primary and alternate email address for notifications. Contractors are strongly encouraged to establish a group email address for the primary email address for the contractor’s authorized point of contacts. The registered email addresses will be the only email used by the government to make notifications.
https://www.dibbs.bsm.dla.mil/
(b) All contractors must have an active System for Award Management (SAM) account, http://www.sam.gov in order to register for DIBBS.
(c) The Contractor shall use DIBBS to receive orders. DLA Energy will not be using DIBBS receipt of quotes capability. All quotations, proposals, bids shall be submitted in accordance with the terms and conditions of the solicitation.
(d) Preparation and Transmission of Orders
(1) The Government may issue an order for a specific delivery or a series of deliveries (e.g., several deliveries during a week). The Government may also elect to issue an order covering a longer period (including monthly orders) and make periodic calls against these orders designating specific delivery dates, times, and quantities.
(2) Only a DLA Energy warranted Contracting Officer can issue an order, either orally or in writing, against a contract. An oral order issued by the warranted Contracting Officer shall provide the required advance notice to the Contractor and the following information:
Interim order number; contract number; item number; ceiling price; quantity; delivery location; and the required delivery and/ or service date.
(i) For all product orders, the Contractor will receive an electronically signed written order via DIBBS, within 24 hours or one business day after the warranted Contracting Officer issues an oral order.
(ii) For all service orders, the Contractor will receive an electronically signed written order via DIBBS, within five business days after issuing the oral order.
(iii) Interim order number is subject to change once the electronically signed written order is received by the contractor. The order number on the written order will take precedence over the interim order number, if different.
(iv) Regardless of the unit price cited on the written order, the office designated to make payments on the written order will pay the applicable unit price in effect under the terms and conditions of the contract.
(v) Once the order has been issued, an email will be sent to the Contractor to provide notice that the order is available on the contract-specific web page. The order will also be submitted to the payment office.
(3) Calls against previously issued orders must be confirmed in writing within 24 hours or one business day via email message. The email confirmation will reference the previously issued order number and item number and designate specific delivery location, dates, and quantity to be delivered against that order.
(4) The Contractor’s nonreceipt of a written or electronic confirmation of an oral order or oral call against a written or electronic order does not relieve the Contractor from its obligation to perform in accordance with the oral order or oral call against a written or electronic order. The Contractor should contact the DLA Energy Contracting Officer if problems are experienced with receipt of the electronic or written confirmation.
http://www.sam.gov/
D. Contract provision F15 BARGE AND/OR T1 CLASS TANKER DEMURRAGE AND LOADING CONDITIONS (DLA ENERGY JAN 2012) is hereby incorporated as follows:
F15 BARGE AND/OR T1 CLASS TANKER DEMURRAGE AND LOADING
CONDITIONS (DLA ENERGY JAN 2012)
On items calling for delivery f.o.b. barge and/or T1 Class tanker at origin--
(a) DELIVERY DATES.
(1) Unless otherwise specified in the Schedule, orders placed under items of the Schedule calling for delivery f.o.b. barge and/or T1 Class tanker at Contractor's refinery, terminal, or bulk plant will be furnished to the Contractor at least 15 days in advance of the date on which delivery is to be made, which date is hereafter referred to as the "scheduled delivery date." Each order will specify the quantity to be delivered, the scheduled delivery date, and the cargo number, and, if then available, the name of the barge and/or T1 Class tanker (herein referred to as "vessel") to be loaded.
(2) The scheduled delivery date may be revised by the Ordering Officer at any time and, unless the Contractor registers objections with the Ordering Officer within 72 hours of receipt of such revised scheduled delivery date, such revised date shall become the new agreed scheduled delivery date. At the time the Contractor registers any such objections, the Contractor must provide a date, subsequent to the date proposed by the Ordering Officer, which represents the earliest date the Contractor can provide a berth. The Ordering Officer must confirm or reject the alternate date provided by the Contractor within 72 hours of receipt of the Contractor's objection. If the Ordering Officer chooses to accept the alternate date provided in the Contractor's objection, such revised date shall become the new agreed scheduled delivery date. If the Ordering Officer chooses to reject the alternate date provided by the Contractor, the scheduled delivery date will return to the previously scheduled delivery date.
(3) All communications regarding the establishment and revision of the scheduled delivery date and objections thereto shall be set down in writing at such time or promptly confirmed in writing.
(b) EXPECTED TIME OF ARRIVAL.
(1) FOR WESTPAC/EUR/MED SHUTTLE OPERATIONS. The vessel designated to lift the cargo will notify the Contractor (at the telex number provided by the Contractor or cause it to be notified when the Contractor does not provide a telex number) of its name and the expected hour of arrival of the barge at least 72 hours before the expected time of arrival and update this notification at 48 and 24 hour intervals before expected arrival.
(2) FOR ALL OTHER VESSELS. The vessel designated to lift the cargo will notify the Contractor at the telex number provided by the Contractor or cause it to be notified when the Contractor does not provide a telex number of the name and the expected hour of arrival of the vessel at least 24 hours before the expected time of arrival.
(c) LAYTIME. The Contractor shall provide as soon as possible, but within 3 hours after receipt of notice of readiness to load from the vessel designated to load the cargo, a reachable berth free of cost to the Government, where the vessel can be safely moored and remain afloat at all times, for loading of the ordered supplies. Laytime shall commence, berth or no berth, either at the expiration of 3 hours after notice of readiness, or immediately when the vessel moors alongside, with or without notice of readiness, whichever first occurs;
PROVIDED, however, that--
(1) If the vessel is tendered for loading on a date earlier than the last scheduled delivery date as determined pursuant to paragraph (a) above, the Government scheduled vessel shall be loaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or at 3:00 a.m. local time on the last agreed schedule delivery date, whichever first occurs.
(2) If the vessel is tendered for loading later than noon on the day following the last agreed scheduled delivery date, as determined pursuant to paragraph (a) above, the vessel shall be loaded as soon as possible in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to have the vessel loaded as soon as is reasonably possible under the circumstances prevailing at the time.
(3) Laytime shall continue 24 hours a day, 7 days a week, without interruption from its commencement until loading of the vessel is completed and the vessel has been released for sailing by the Government Quality Representative.
(d) ALLOWED LAYTIME.
(1) BASIC ALLOWED LAYTIME. For cargo movements under DLA Energy bulk petroleum contracts, the Contractor shall be allowed 1 hour for each 2,000 barrels loaded.
(2) INCREASES TO BASIC LAYTIME.
(i) If, after laytime commences, the condition of the vessel to be loaded does not permit loading, such basic allowed laytime shall be increased by the duration of such delay.
(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, such basic allowed laytime will be increased by the duration of such delay that occurred after laytime commenced.
(iii) If regulations of the owner, operator of the vessel, Customs Officials, or Port Authority prohibit loading at any time after laytime commenced, time so lost shall be added to the basic allowed laytime.
(iv) If for any reason the Contractor is delayed in loading the barge or there is a delay in releasing the vessel for sailing because of action of the U.S. Government that arises out of causes beyond the control and without the fault or negligence of the Contractor, such basic allowed laytime shall be increased by the duration of such delay.
(v) If the vessel requests cargo tanks be cushioned or topped off during the loading process and the quantity of product cushioned or topped including the time spent cushioning/topping tanks is noted on the DD Form 250-1, Loading/Inspection Report, the basic allowed laytime shall be increased by the difference between the actual time taken to cushion/top tanks and the amount of time required to pump the same quantity of cushioned/topped product at the Contractor's actual loading rate exclusive of cushioning/topping time and cushioning/topping quantity.
(vi) Contractor will be allowed up to 4 hours of additional laytime following removal of cargo hoses until vessel is released by the inspector in order to accomplish tasks required under the CONTRACTOR INSPECTION RESPONSIBILITIES contract provision.
(vii) There will be no increases made to the basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings.
(viii) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing basic allowed laytime for one half of the delay.
(e) For all hours of laytime that elapse in excess of allowed laytime for loading provided for by paragraph (d) above, demurrage shall be paid by the Contractor as follows:
(1) TIME CHARTER VESSELS. At the demurrage rate for the vessel loaded, computed to the nearest whole hour, as published by the Military Sealift Command, and in effect on the date loading of the vessel is completed.
(2) The demurrage rate set forth in the Carrier's Tender of Freight Services and Demurrage Invoice to the Government.
(3) CONTRACT VESSELS. At the hourly rate specified in the contract.
(f) Hoses for loading a vessel shall be furnished, connected, and disconnected by the Contractor; loading arm shall be connected and disconnected by the Contractor.
(g) Title to the supplies delivered and risk of loss thereof shall pass from the Contractor to the Government when the supplies pass the vessel's permanent hose connection.
E. Contract provision F52 TANKER/OCEAN-GOING BARGE DEMURRAGE AND
LOADING CONDITIONS (DLA ENERGY JAN 2012) is hereby incorporated as follows:
F52 TANKER/OCEAN-GOING BARGE DEMURRAGE AND LOADING CONDITIONS
(DLA ENERGY JAN 2012)
On items calling for delivery f.o.b. tanker/ocean-going barge at origin--
(a) DELIVERY DATES.
(1) Unless otherwise specified in the Schedule, orders placed under items of the Schedule calling for delivery f.o.b. tanker/ocean-going barge at Contractor's refinery, terminal, or bulk plant will be furnished to the Contractor at least 20 days in advance of the date on which delivery is to be made, which date is hereinafter referred to as the "scheduled delivery date."
Each order will specify the quantity to be delivered, the scheduled delivery date, the cargo number, and, if then available, the name and size of the tanker/ocean-going barge (herein referred to as "vessel") to be loaded.
(2) The scheduled delivery date may be revised by the Ordering Officer at any time and unless the Contractor registers objections with the Ordering Officer within 72 hours of receipt of such revised scheduled delivery date, such revised date shall become the new agreed scheduled delivery date. At the time the Contractor registers any such objections, the Contractor must provide a date, subsequent to the date proposed by the Ordering Officer, which represents the earliest date the Contractor can provide a berth. The Ordering Officer must confirm or reject the alternate date provided by the Contractor within 72 hours of receipt of the Contractor's objection. If the Ordering Officer chooses to accept the alternate date provided in the Contractor's objections, such revised date shall become the new agreed scheduled delivery date.
If the Ordering Officer chooses to reject the alternate date provided by the Contractor, the scheduled delivery date will return to the previous scheduled delivery date.
(3) All communications regarding the establishment and revision of the scheduled delivery date and objections thereto shall be set down in writing at such time or promptly confirmed in writing.
(b) EXPECTED TIME OF ARRIVAL. The vessel designated to lift the cargo will notify the Contractor’s load facility, at the telex/facsimile number provided by the Contractor, of the name and the expected hour of arrival of the vessel at least 72 hours before the expected time of arrival, and at additional intervals of 48 and 24 hours before expected arrival. When vessels are scheduled to load at more than one contract source within a port complex, the 72-48-24 hour notices will be provided by the vessels to all contract sources at the same time as the notice is provided to the first contract source and will stipulate the order of loading.
(c) LAYTIME. The Contractor shall provide as soon as possible, but within 6 hours after issue of notice of readiness to load from the vessel designated to load the cargo, a reachable berth, free of cost to the Government, for the loading of supplies ordered, where at least vessels with a maximum draft of ___37____ feet can be safely moored and remain afloat at all times.
When vessels are scheduled to load at more than one contract source within a port complex, notice of readiness will be provided once by the vessel to all contract sources simultaneously.
Laytime shall commence, berth or no berth, either at the expiration of 6 hours after notice of readiness is received or immediately when the vessel moors alongside with or without notice of readiness, whichever first occurs; PROVIDED, however, that--
(1) If the vessel is tendered for loading on a date earlier than the last agreed scheduled delivery date as determined pursuant to paragraph (a) above, the Government's vessel shall be loaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or at 6:00 a.m. local time on the last agreed scheduled delivery date, whichever first occurs.
(2) If the vessel is tendered for loading later than noon of the day following the last agreed scheduled delivery date, as determined pursuant to paragraph (a) above, the vessel shall be loaded as soon as possible in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available.
If the vessel is not moored in its proper turn with other vessels, laytime will commence at 6:00 a.m. on the date the Government vessel’s turn occurred, regardless of whether the cargo is available.
(3) For two or more contract sources within a port complex, laytime for the second or subsequent source begins when the vessel leaves the prior source.. Laytime credit will be allowed for transit time between the prior and subsequent load source based on the actual transit time from the previous source to the subsequent source’s loading berth or anchorage area if the berth is not available for the Government’s vessel. In the event a berth is not available and the vessel is forced to anchorage, no additional laytime credit will be allowed when the vessel finally gets clearance to moor at the contractor’s berth.
(4) Laytime shall continue 24 hours a day, 7 days a week, without interruption from its commencement until the entire loading of the vessel cargo is completed and the vessel has been released for sailing by the Government Quality Representative.
(d) ALLOWED LAYTIME.
(1) BASIC ALLOWED LAYTIME. For cargo movements under DLA Energy bulk petroleum contracts, the Contractor shall be allowed 36 hours of basic allowed laytime for loading a full vessel cargo. The 36 hours covers all operations for loading including cushioning and topping tanks. When partial vessel cargoes are to be loaded, a portion of the 36 hours basic laytime will be allocated to each loading port equal to the percentage of the total quantity loaded at each loading port or source.
(2) INCREASES TO BASIC ALLOWED LAYTIME.
(i) If after laytime commences, the condition of vessel to be loaded does not permit loading, such basic allowed laytime shall be increased by the duration of such delay.
(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, such basic allowed laytime will be increased by the duration of such delay which occurred after laytime commenced.
(iii) After laytime commences, when vessels are required to dock at anchorage due to vessel delays such as vessel inspection and inerting , laytime credit will be allowed for transit time from anchors away at anchorage until first line ashore berthing, not to exceed 2 hours.
(iv) If regulations of the owner or operator of the vessel prohibit loading at any time after laytime has commenced, time so lost shall be added to the basic allowed laytime.
(v) If for any reason the Contractor is delayed in loading the vessel or there is a delay in releasing the vessel for sailing because of action of the U.S. Government that arises out of causes beyond the control and without the fault or negligence of the Contractor, such basic allowed laytime shall be increased by the duration of such delay.
(vi) The Contractor will be allowed up to 4 hours of additional laytime following removal of cargo hoses until the vessel is released by the inspector in order to accomplish tasks required under the CONTRACTOR INSPECTION RESPONSIBILITIES contract provision.
(vii) There will be no increase made to the basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings.
(viii) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing basic allowed laytime for one-half of the delay.
(e) For all hours of laytime which elapse in excess of allowed laytime for loading provided for by paragraph (d) above, demurrage shall be paid by the Contractor as follows:
(1) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded, computed to the nearest whole hour, as published by the Military Sealift Command, and in effect on the date loading of the vessel is completed.
(2) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the actual demurrage expense incurred by the Government under the charter;
(f) Hoses for loading a vessel shall be furnished, connected, and disconnected by the Contractor; loading arms shall be connected and disconnected by the Contractor.
(g) Title to the supplies delivered and risk of loss thereof shall pass from the Contractor to the Government when the supplies pass the vessel's permanent hose connections.
(h) The temperature of any fuel oil loaded shall be at least 10oF below the flash point of the oil and in no case higher than 150oF if the cargo tanks are uncoated, or 135oF if coated; PROVIDED, however, that in no event shall the difference between the temperature of the oil entering the vessel manifold and the recorded temperature of sea water at the vessel's condenser intake exceed 70oF; PROVIDED further, that the Master of the vessel may authorize loading the product at a temperature higher than specified above, so long as the temperature of the product remains at least 10oF below the flash point of the product.
F. Contract provision F52.01 TANKER STANDARDS AND REQUIREMENTS (DLA
ENERGY SEP 1995) is hereby incorporated as follows:
F52.01 TANKER STANDARDS AND REQUIREMENTS (DLA ENERGY SEP 1995)
(a) All Government-furnished tankers used in the course of this contract will comply with the following:
(1) U.S.-flag tankers will hold and comply with the requirements of a current Certificate of Inspection (COI) from the U.S. Coast Guard and be in compliance with all requirements of Safety of Life at Sea (SOLAS) and International Convention for the Prevention of Pollution for Ships (MARPOL 73/78).
(2) In the event of a voyage charter, a non-U.S.-flag tanker will comply with SOLAS and MARPOL 73/78.
(3) Tankers on long term charter to the U.S. Government will be equipped with an Inert Gas System (IGS), which will be maintained in good working order. The U.S.
Government will make best efforts to ensure voyage chartered tankers are equipped with IGS when required by the terminal or port authority and shall maintain and operate same in good working order.
(4) All tankers will carry on board and will be guided by the requirements of the latest edition of the Oil Companies International Marine Forum (OCIMF) and International Safety Guide for Oil Tankers and Terminals (ISGOTT).
(5) All tankers will be equipped with tank level measuring devices in each cargo tank.
(6) All tankers will be capable of vapor recovery, which includes closed loading, gauging, and sampling where required by port regulations.
(7) All tankers shall be in full compliance with all applicable international conventions and all applicable laws, regulations, and other requirements of the nation of registry and of the nation(s) and local jurisdictions to whose port(s) and/or places the tanker may be ordered.
(b) The Contractor may, at its own expense and in a manner so as not to delay a scheduled delivery, inspect tankers for compliance with these requirements. In the event the Contractor believes a tanker does not meet a requirement contained herein, the Contractor shall notify DLA Energy in writing with a copy to the tanker captain of the specific details of the alleged deficiency as soon as possible. The Contracting Officer will make a determination as to compliance with these requirements. This determination will be binding on the parties.
G. Contract provision F54 TANKER UNLOADING CONDITIONS (DLA ENERGY AUG
2007) is hereby incorporated as follows:
F54 TANKER UNLOADING CONDITIONS (DLA ENERGY AUG 2007)
On items calling for delivery f.o.b. destination by means of tanker--
(a) The supplies ordered hereunder shall be delivered, all transportation charges paid, to the destination specified in the Schedule. Unless otherwise specified in the Schedule, orders placed under items for delivery f.o.b. destination tanker would be furnished the Contractor at least 30 days in advance of the delivery schedule. The delivery schedule will be a three day window hereafter referred to as the lay window. Each order will specify a cargo number commencing with DC, the quantity to be delivered and the lay window. The lay window may be changed by the Contractor at any time if the Ordering Officer approves.
(b) The Contractor will provide the following information with the vessel nomination prior to the Government accepting the vessel for use:
(1) The requirements of the Cargo Preference Act are applicable. If a U.S.-flag vessel is not available, the Contractor must request a waiver. The request must contain statements from at least two U.S.-flag carriers contacted (with names and telephone numbers).
Copies of telephone notes, telegraphic and facsimile messages or letters will be sufficient for this purpose;
(2) Questionnaire 88 with full vessel particulars; and
(3) Vessel’s prior two cargoes carried.
The Contractor will notify, or cause to be notified, the ordering activity of the vessel’s status from time of nomination through completion of discharge operations.
Direct pre-arrival notifications to the receiving terminal shall be made in accordance with port, state and regulatory requirements and at least 72 hours before the time of arrival.
(c) Within six hours after receipt of notice of readiness (NOR) from the Captain or Master of the vessel, the Government will provide, free of cost, a reachable berth at the unloading port for the unloading of the supplies ordered where the tanker can be safely afloat at all times.
(d) If the vessel tenders NOR, within the agreed lay window, laytime will commence for the Government NOR plus six hours or when the vessel moors alongside, whichever first occurs. Should a vessel tender NOR outside the agreed upon lay window, the vessel will wait in queue for its proper turn. The Government will make best efforts to minimize time waiting.
(e) The Government will be allowed a minimum of 1 hour of laytime for every 6,000 barrels of cargo for vessels of 30,000 dead weight tons or larger, plus an additional 4 hours for administrative and shore operational needs. Allowable laytime for the Government shall be increased for any delays caused by the vessel of the Contractor. Time waiting for cargo results, Port Authority delays, customs clearances, or any conditions beyond the Government’s control shall not be counted.
(f) For all hours of laytime that elapse in excess of the allowed laytime for unloading provided for by (e) above, demurrage will be paid by the Government at the demurrage rate in the charter The Contractor must provide proof of demurrage with the claim.
The demurrage payable by the Government shall in no extent exceed the actual demurrage expense incurred by the Contractor.
(g) Hoses for unloading a tanker will be furnished, connected, and disconnected by the Government.
(h) Title to the supplies delivered, and risk of loss thereof, shall pass from the Contractor to the Government when the supplies pass the tanker's permanent hose connections.
(i) While unloading, the tanker shall be governed by all applicable regulations in force at unloading port, including those relating to fires on board ships.
H. Contract provision F105.01 DEADFREIGHT (DLA ENERGY JAN 2012) is hereby incorporated as follows:
F105.01 DEADFREIGHT (DLA ENERGY JAN 2012)
(a) Any decrease in quantity not permissible under the VARIATION IN QUANTITY clause shall result in deadfreight, chargeable to the Contractor and calculated as follows:
Total days of the cargo
TIMES
Vessel daily cost
DIVIDED BY
Vessel capacity stated in barrels
TIMES
Total barrels scheduled to load MINUS Total barrels loaded
EQUALS
Deadfreight cost
(b) Explanation of terms used in (a) above follows:
(1) "Total days of the cargo," as used in this contract provision, is calculated as the elapsed days from the vessel's final departure date from previous cargo port through vessel's final discharge date for the cargo in question.
(2) "Vessel daily cost," as used in this contract provision, shall be determined as follows:
(i) VOYAGE CHARTER TANKER. At the per diem rate in the charter, except that the deadfreight payable by the Contractor shall not exceed actual expense incurred by the Government under the charter.
(ii) USS, USNS, OR TIME CHARTERED TANKER. At the per diem rate for the tanker loaded, as published by the Military Sealift Command and in effect on the date loading of the tanker is completed.
(3) "Total barrels scheduled to load," as used in this contract provision, is the total quantity (all products) reflected on the latest DD Form 1155.
(4) "Total barrels loaded," as used in this contract provision, is the total quantity (all products) shown as loaded on the DD Form 250-1.
I. The following clause is hereby deleted in its entirety:
52.215-9023 REVERSE AUCTION (OCT 2013)
NOTE: BEM documents – the Minimum Cost Bid Evaluation Worksheet (MCBEW) and the Laid Down Cost Report (LCR) will not be generated. There will be no second look process nor will we require offerors to use the Reverse Auction Procurex tool for this Solicitation.
J. Clause 252.203-7002-REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013) is hereby incorporated as follows:
252.203-7002-REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER
RIGHTS (SEP 2013)
(a) The Contractor shall inform its employees in writing, in the predominant native language of the workforce, of contractor employee whistleblower rights and protections under 10 U.S.C. 2409, as described in subpart 203.9 of the Defense Federal Acquisition Regulation Supplement.
(b) The Contractor shall include the substance of this clause, including this paragraph (b), in all subcontracts.
K. Contract provision M3.01EVALUATION OF OFFERS WHERE UNCOMMON
ESCALATORS ARE USED (DLA ENERGY JAN 1998) is hereby incorporated as follows:
M3.01 EVALUATION OF OFFERS WHERE UNCOMMON ESCALATORS ARE USED
(DLA ENERGY JAN 1998)
(a) FOR EVALUATION PURPOSES ONLY, an evaluation factor will be applied to the Final Proposal Revision (FPR) prices of those items in which uncommon escalators are proposed as a basis for economic price adjustments. The evaluation factor will establish a commonality among the different postings or publications offered in order to ensure that all offerors are evaluated on an equal basis.
(b) The offeror's margin (plus or minus) will be established as the difference between the FPR price and the Final Revised reference price. The margin will then be added to the 12-month average of the posting or publication being proposed to determine the evaluated price. The 12-month average will be calculated over the most recent complete 12-month period prior to the established reference date (i.e., if reference date is August 22, 1994, then the 12-month period would be August 1993 - July 1994).
L. All other terms and conditions remain unchanged and in full force and effect.