Attachment_9_-_Exhibit_A.docx
DOCX document 35 KB Posted
- Attached to
- Energy Savings Performance Contract Power Purchase Agreement for the Enviromental Protection Agency
- Solicitation number
- SP0600-13-R-0400
- Issued by
-
Defense Logistics Agency Energy
About this file
Attachment 9 - Exhibit A
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EPA Edison
SP0600-12-R-0427
Exhibit A EPA Edison ESPC PPA
SP0600-12-R-0427
CONTENTS:
Schedule 1 Schedule 2 Schedule 3 Schedule 4
Schedule 1
Solar Renewable Project Experience
The Provider shall submit documentation of its experience in designing, financing, constructing, owning, operating, and maintaining solar generation systems that are similar in scope, size, type, and complexity to the project identified in the RFP.
PV System Name and Location:
Owner Name and Contact Information:
System Information:
(Note: Limit to no more than 6 system submissions.)
PV System Size:
System Description:
Construction Length:
Module:
Inverter:
Warranty:
Additional Components or Services Included:
Any Exclusions:
Special Notes:
Schedule 2
GUARANTEED COST SAVINGS AND PROVIDER PAYMENTS
IMPORTANT INFORMATION
(1) If selected, the contractor shall complete the installation no later than _____ months after contract award.
(2) Excess production beyond the estimated kWh generation shall belong to the Government at no additional charge.
(3) Provider shall not limit production in any given fiscal year after reaching the Guaranteed Generation level.
(4) Performance Period Years coincide with Federal Government fiscal years. Year One may be a partial year.
| Contractor Name: |
| Project Site: |
Post-Acceptance Performance Period Year
| Commodity Energy Price ($/kWh) |
| Estimated Generation (kWh) |
| Guaranteed Generation (kWh) |
| Guaranteed Annual Cost Savings ($) |
| Annual Provider Payments ($) |
One
Two
Three
Four
Five
Six
Seven
Eight
Nine
Ten
Eleven
Twelve
Fourteen
Fifteen
Sixteen
Seventeen
Eighteen
Nineteen
Twenty
Twenty-one
Twenty-two
Twenty-three
Twenty-four
Totals
Schedule 3
EARLY TERMINATION
The Early Termination Fee with respect to the System under the contract shall be calculated in accordance with the following schedule. At Expiration of the contract, the amount in Column 1 (Early Termination Fee) shall be deemed to be zero (0) and the amount in Column 2 (Estimated Minimum Option Price) shall be the amount applicable for the year then ending.
| Early Termination Occurs at the end of Post Acceptance Year: |
| Column 1: |
Early Termination Fee (including costs of removal ) Column 2:
Early Termination Fee (owner takes title)
Schedule 4
SYSTEM OUTPUT PROFILE
Provide a system outprofile, in kilowatts, of the hourly generation output of the solar PV system given the physical and environmental parameters of the site. Comment by Scott Trotier: Should this output profile be based on a specifc model (i.e. PVWatts)?
| Hour |
| Jan |
| Feb |
| Mar |
| Apr |
| May |
| Jun |
| Jul |
| Aug |
| Sep |
| Oct |
| Nov |
| Dec |
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM
7:00 AM
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
Monthly Production
Annual Production _______________________
File details come from the government source that posted it. Updated .