Amendment_0005.pdf

PDF 65 KB Posted

Attached to
Energy Savings Performance Contract Power Purchase Agreement for the Enviromental Protection Agency
Solicitation number
SP0600-13-R-0400
Issued by

About this file

Amendment 0005

View the file

Other files

File Type Posted
Amendment_0013.pdf PDF
Amendment_0012.pdf PDF
Amendment_0011.pdf PDF
SP0600-13-R-0400_Amendment_0011.pdf PDF
Amendment_0010.pdf PDF
SP0600-13-R-0400_Amendment_0010.pdf PDF
Attachment_6-_Land_Use_Agreement.pdf PDF
SP0600-13-R-0400_Amendment_0009.pdf PDF
Amendment_0009.pdf PDF
Amendment_0008.pdf PDF
SP0600-13-R-0400_Amendment_0007.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
SP0600-13-R-0400_Amendment_0006.pdf PDF
Attachment_13_-_EPA_Edison_SQFT.pdf PDF
Attachment_9_Amendment_0005.docx DOCX document
SP0600-13-R-0400_Amendment_0005.pdf PDF
Attachment_12_-_CAD_File_Amendment_0004.pdf PDF
Attachment_1-Installation_Data_Sheet_Amendment_0004.xlsx XLSX spreadsheet
Amendment_0004.pdf PDF
Attachment_11_-_Building_18_Amendment_0004.pdf PDF
SP0600-13-R-0400_Amendment_0004.pdf PDF
SP0600-13-R-0400_Amendment_0003.pdf PDF
Amendment_0003.pdf PDF
SP0600-13-R-0400_Amendment_0002.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
SP0600-13-R-0400_Amendment_0001.pdf PDF
Attachment_10_-_Small_Business_Subcontracting_Plan.pdf PDF
Attachment_1-Installation_Data_Sheet.xlsx XLSX spreadsheet
Attachment_6-_Land_Use_Agreement.pdf PDF
Attachment_9_-_Exhibit_A.docx DOCX document
Attachment_8_-_Past_Performance_Information.doc DOC document
SP0600-13-R-0400.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

01/18/2013

4. REQUISITION/PURCHASE REQ. NO.

SP0600-12-0423

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE Defense Logistics Agency Energy 8725 John J. Kingman Road, Suite 4950 Fort Belvoir, VA 22060

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION

NO.

SP0600-13-R-0400

9B. DATED (SEE ITEM 11)

October 3, 2012

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended to

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, X is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Continuation Page

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Lawrence T. Fratis

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

X

SP0600-13-R-0400

EPA Edison

The following revisions are hereby incorporated into the solicitation and are highlighted in yellow:

Section B – Supplies or services and prices/costs

1. The definition of Current Cost of Energy has been added to Section B.1 Definitions.

2. The maximum quantity has been updated in Section B.1.4 CLIN Description.

3. The delivery period has been updated from 20 to 25 years in Section B.1.5.

4. The following language is hereby removed from Section B.1.5:

“including the effect of net excess generation limits and associated payments.”

Section C - Description/specifications/statement of work

1. Section C.1.3.1a Premises has been updated.

2. Section C.3.4.3 has been updated.

3. Section C.25.1 has been updated.

Section I – Contract Clauses

1. FAR clauses 52.209-6 Protecting the Government’ Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Dec 2010) (31 U.S.C. 6101 note) and 52.232.22 Payment by Electronic Funds Transfer—Central Contractor Registration are hereby removed from FAR 52.252-2 Clauses Incorporated By Reference FEB 1998.

Section J – List of Attachments

1. Attachment 13 has been added to the solicitation.

Section L – Instructions, conditions, and notices to Providers or respondents

1. The following language is hereby removed from Section L.5.1.3.1 Subfactor 1—Production.

““Estimates of AC energy delivery of the system.” The PV module power ratings are for Standard Test Conditions (STC) of 1000 W/m2 solar irradiance and 25°C PV module temperatures. The estimated energy delivery shall be based on average solar data for Philadelphia. Estimated energy delivery shall be provided for each month of the year and total for the year. The STC power value will be entered into PVWATTS http://rredc.nrel.gov/solar/calculators/PVWATTS/version1/US/Pennsylvania/Philadelphia.html <http://rredc.nrel.gov/solar/calculators/PVWATTS/version1/US/Pennsylvania/Philadelphia.html> to determine estimated energy delivery in kWh.”

Attachments

1. Attachment 9 has been updated.

File details come from the government source that posted it. Updated .