Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE 17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF.
DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 3/2005)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITON IS
UNRESTRICTED OR
NAICS:
SIZE STANDARD:
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
OFFER
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS
EMERGING SMALL
BUSINESS
8(A)
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
STANDARD FORM 1449 (REV. 3/2005) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
Contractor-Owned, Contractor-Operated (COCO) COCO Storage Services, Pt Mahon, Delaware
Solicitation SP0600-11-R-0513
TABLE OF CONTENTS
SECTION B – SUPPLIES OR SERVICES AND PRICE/COSTS
INT-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
INT-C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)
INT-C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)
INT-C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DLA ENERGY OCT
2001)
SECTION E – INSPECTION AND ACCEPTANCE
52.246-4 INSPECTION OF SERVICES -- FIXED-PRICE (AUG. 1996)
INT-E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000)
INT-E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY
NOV 2003)
INT-E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY JAN
2009)
INT-E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA ENERGY OCT 2002)
INT-E34 TEST FOR SULFIDES IN WATER (DLA ENERGY MAY 1987)
INT-E36 INSPECTION (STORAGE) (DLA ENERGY FEB 1970)
SECTION F – DELIVERIES OR PERFORMANCE
52.242-15 STOP-WORK ORDER (AUG. 1989)
INT-F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY OCT 1997)
INT-F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)
INT-F1.14 DETERMINATION OF QUANTITY (STORAGE) (DLA ENERGY NOV 1997)
INT-F45.01 OPERATION OF CONDUCTIVITY ADDITIVE SYSTEM (DLA ENERGY OCT 1998)
INT-F45.03 OPERATION OF FUEL SYSTEM ICING INHIBITOR ADDITIVE SYSTEM (COCO) (DLA
ENERGY OCT 2004)
INT-F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE) (DLA ENERGY DEC
1991)
SECTION G – CONTRACT ADMINISTRATION DATA
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--CENTRAL CONTRACTOR
REGISTRATION (OCT. 2003)
52.232-38 SUBMISSION OF ELECTRONIC FUNDS TRANSFER INFORMATION WITH OFFER (MAY
1999)
INT-G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)
INT-G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA ENERGY DEC 1999)25
INT-G9.07 ELECTRONIC TRANSFER OF FUNDS PAYMENTS - CORPORATE TRADE EXCHANGE
(DLA ENERGY JUL 2007)
INT-G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009)
INT-G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997)
INT-G148.05 SUBMISSION OF INVOICES FOR PAYMENT (SERVICES) (DLA ENERGY MAR 2009) . 28
INT-G150.03 ELECTRONIC SUBMISSION OF INVOICES FOR PAYMENT (EDI) (DLA ENERGY OCT
1998)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
INT-H19 REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE) (DLA ENERGY NOV
1989)
SECTION I – CONTRACT CLAUSES
52.202-1 DEFINITIONS (JULY 2004)
INT-I1.01-4 DEFINITIONS (CONT’D) (STORAGE) (DLA ENERGY JUNE 2009)
52.203-3 GRATUITIES (APR 1984)
52.204-7/252.204-7004 CENTRAL CONTRACTOR REGISTRATION (APR 2008) ALTERNATE A (SEP
2007)
52.212-4 CONTRACT TERMS AND CONDITIONS -- COMMERCIAL ITEMS (JUN 2010)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS -- COMMERCIAL ITEMS (JAN 2011)
52.215-8 ORDER OF PRECEDENCE -- UNIFORM CONTRACT FORMAT (OCT 1997)
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
52.232-17 INTEREST (OCT 2010)
52.233-1 DISPUTES (JULY 2002) ALTERNATE 1 (DEC 1991)
52.246-25 LIMITATION OF LIABILITY -- SERVICES (FEB 1997)
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (MAY 2004)
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (JAN
2009)
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A TERRORIST COUNTRY (DEC 2006)
252.212-7001 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS APPLICABLE TO DEFENSE ACQUISITIONS OF COMMERCIAL
ITEMS (DEC 2010)
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (MAR 2008)
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
INT-I102.02 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT ACT -- PAYROLL TAX
ADJUSTMENT (DLA ENERGY JUL 1988)
INT-I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DLA ENERGY
APR 2009)
INT-I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA ENERGY JUN 2009)
INT-I147 DEMURRAGE (DLA ENERGY NOV 1989)
INT-I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DLA ENERGY MAY 1987)
INT-I209.03 EXTENSION PROVISION (STORAGE) (DLA ENERGY SEP 1991)
INT-I291 CONTRACTOR PUBLIC KEY INFRASTRUCTURE (PKI) IMPLEMENTATION (Sept 2009)59
INT-I385 NOTIFICATION OF CONTRACTING OFFICER IN THE EVENT OF DISCOVERY OF
EVIDENCE OF FRAUD UNDER THE CONTRACT (DLA ENERGY JUL 2008)
SECTION J – LIST OF ATTACHMENTS
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF
OFFERORS OR RESPONDENTS
52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (SEP 2007)
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2011)
52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010)
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (APR 2010)
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS -- COMMERCIAL ITEMS (JAN
2011) ALTERNATES I AND II (APR 2002)(OCT 2000)
252.209-7001 DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A TERRORIST
COUNTRY (JAN 2009)
52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (JAN 2011) ALTERNATE I (APR 2002)
252.225-7031 SECONDARY ARAB BOYCOTT OF ISRAEL (JUN 2005)
252.247-7022 REPRESENTATION OF EXTENT OF TRANSPORTATION BY SEA (AUG 1992)
INT-K15 RELEASE OF PRICES (DLA ENERGY MAR 2009)
INT-K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007)
INT-K150 WIDE AREA WORKFLOW (DLA ENERGY OCT 2008)
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDERS
52.215-1 INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (JAN 2004) ALTERNATE
1 (OCT 1997)
52.216-1 TYPE OF CONTRACT (APR 1984)
52.233-2 SERVICE OF PROTEST (SEP 2006)
252.204-7001 COMMERCIAL AND GOVERNMENT ENTITY (CAGE) CODE REPORTING (AUG 1999)84
52.233-9000 AGENCY PROTESTS (SEP 1999) - DLAD
52.233-9001 DISPUTES: AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (JUN 2001) -
DLAD
INT-L2.11-4 E-MAIL PROPOSALS (DLA ENERGY OCT 2010)
INT-L82 WAGE DETERMINATION (DLA ENERGY FEB 2009)
INT- L116.01 DATA REQUIREMENTS (STORAGE) (DLA ENERGY NOV 2003)
INT-L201.02 INSTRUCTIONS TO OFFERORS (COCO) (DLA ENERGY MAY 1997)
SECTION M – EVALUATION FACTORS FOR AWARD
52.212-2 EVALUATION -- COMMERCIAL ITEMS (JAN 1999)
INT-M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997) ... 88
SECTION B – SUPPLIES OR SERVICES AND PRICE/COSTS
INT-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)
The services to be furnished during the period specified herein and the unit prices are as follows:
PERFORMANCE WORK STATEMENT
Contract Services Dover, Delaware, Area
1 Description of Required Services:
1.1 Area of Consideration
1.2 Storage Tank Requirements
1.3 Grade of Service
1.4 Physical System Requirements
1.5 Estimated Throughput Requirements
1.6 Property Control Records and System Requirements
2 General Information:
2.1 Product Receiving Requirement
2.2 Product Shipping Requirement
3 Ancillary Facilities:
3.1 Storage Tanks and Facilities
3.2 Tank Truck Loading and Shipping Facilities
3.3 Dock and Berthing Facilities
3.4 Pipeline Facilities
3.5 Filtration Facilities
3.6 Laboratory Facilities
3.7 Additive Injection System(s)
3.8 Backup Power
4 Quality Surveillance Representative (QSR) Support:
4.1 Office Facility Support
4.2 Telephone Support
4.3 Facsimile Machine
4.4 Facsimile Machine Telephone
4.5 Photocopy Type Reproduction Machine
5 Best Commercial Practices:
1 Description of Required Services:
Defense Logistics Agency (DLA) Energy requires Defense Fuel Support Point (DFSP) services in the Dover, Delaware area for a five-year period beginning November 1, 2011. The following terms and conditions are applicable to the requirement for contract services and ancillary facilities for receiving, storing, protecting, and shipping turbine fuel aviation grade Jet-A with Fuel System Icing Inhibitor (FSII), Corrosion Inhibitor (CI), and Static Dissipator Additive (SDA); or receiving, storing, and protecting Jet-A and additives separately and additizing upon shipping. Terms and conditions applicable to the requirement are as follows:
1.1 AREA OF CONSIDERATION: 25-mile radius of Dover Air Force Base, Delaware.
1.2 STORAGE TANK REQUIREMENT: Approximately 400,000 barrels (shell capacity) storage for turbine fuel aviation grade Jet-A with or without additives with a minimum of two interconnected tanks capable of being isolated from other facilities and products handled within the tank farm. DLA Energy Internal Instruction L116.01 - Data Requirements (Storage), data required to be submitted applies.
1.3 GRADE OF SERVICE: Government-owned turbine fuel aviation grade Jet-A with or without additives.
1.4 PHYSICAL SYSTEM REQUIREMENTS: Storage and handling facilities capable of receiving, storing, protecting, and shipping one grade of Government-owned petroleum product. In addition to the data required by DLA Energy Internal Instruction L116.01, the potential Contractor will be required to provide the tank cleaning and inspection data required by Clause DLA Energy Internal Instruction E18 - Inspection And Cleaning Of Bulk Petroleum Storage Tanks, as part of their proposal. The tank cleaning and inspection data will be evaluated and utilized as an evaluation factor in determining the Governments risk associated with the utilization of the facility.
1.5 ESTIMATED THROUGHPUT REQUIREMENTS: 1,857,000 barrels each 12-month period. Throughput is computed as follows:
receipts plus issues, divided by two. The estimated throughput quantity does not include the initial fill of the terminal.
1.6 PROPERTY CONTROL RECORDS AND SYSTEM RECORDS: The Contractor shall provide Property Control and System Records in compliance with paragraph (a) of DLA Energy Internal Instruction I119.04 - Inventory Control Records And Systems Of Record. The Contractor-furnished computer system shall meet the current commercial standards for a computer system capable of accomplishing the data reporting and records keeping required by the Fuels Automated System (FAS); maintaining the data reporting and records keeping associated with product quality surveillance (i.e., product analysis and testing reports); and the documents collection and records associated with the Contractor’s preventive maintenance program, etc. The Contractor shall input inventory and sales data of Government-owned product directly into the Government’s Fuel Accounting System (FAS) utilizing the FES 02 inventory reporting procedures and the Contractor-furnished computer system via the Contractor-furnished internet access (with static IP address capability) or creation of a dial-in account to the DLA Energy web server. Additional data and requirements can be found in DLA Energy Internal Instruction I119.04.
1.6.1 FAS ADP EQUIPMENT: The Contractor shall provide a computer capable of operating the Government provided software. Please see DLA Energy Internal Instruction I119.04.
1.6.2 FAS DATA ENTRY TELEPHONE SUPPORT: The Contractor shall provide an unrestricted telephone line to be used for data entry into the Government FAS system. The installation charges and the monthly telephone bill will be reimbursed by the Government upon presentation of supporting documentation and an invoice certified by the QSR. No fee or administrative charge will be allowed to be added to the bill.
2 GENERAL INFORMATION:
2.1 PRODUCT RECEIVING REQUIREMENT: The Contractor shall be capable of receiving fuel via either barge or pipeline and via tank truck.
2.1.1 Via barge or pipeline on a 24 hours per day, seven (7) days per week basis, at a minimum rate of 1,750 barrels per hour.
2.1.2 Via Government-furnished tank trucks between the hours of 0500 to 1500, five (5) days per week (Monday through Friday), Saturdays, Sundays and Federal holidays excepted as stipulated in the wage determination. The Contractor’s tank truck off-loading facility shall have a minimum of two (2) headers capable of spotting and off-loading two (2) tank trucks simultaneously.
2.2 PRODUCT SHIPPING REQUIREMENT:
2.2.1 Via Contractor furnished pipeline and pipeline connections to the Dover Air Force Base, Delaware, storage/manifold facilities. The Contractor’s pipeline and facilities must be compatible with the Air Force Base receiving capability and capable of pipeline delivery at a minimum rate of 28,000 barrels per day (24 hours continuous pumping), on a 24 hour per day, seven (7) days per week basis.
2.2.2 Via Government-furnished tank trucks during the hours of 0500 to 1500, five days per week (Monday through Friday), Saturdays, Sundays and Federal holidays excepted as stipulated in the wage determination. The Contractor’s tank truck loading and shipping facility must be equipped with a Scully system (or compatible) capable of loading and shipping a maximum of four 8,000 gallon tank trucks per hour.
3 ANCILLARY FACILITIES:
3.1 STORAGE TANKS AND FACILITIES: The storage tanks and facilities must meet the minimum requirements of the current API standards, the NFPA codes, and all laws, regulations, etc., applicable to tanks and facilities of the type to be provided. Cone roof tanks with internal floating pans are preferred however; floating roof tanks will be acceptable. Floating roof tanks will be equipped with roof drains which prevent water from coming into contact with the fuel. The tanks shall be interconnected so as to provide the capability of transferring/filtering product between tanks. The tanks and facilities will consist of one dedicated system capable of receiving, storing, and shipping one grade of Government-owned product. An isolated system in place of the preferred dedicated system is acceptable provided the requirements of DLA Energy Internal Instruction L116.01 (d) are met.
3.2 TANK TRUCK LOADING AND SHIPPING FACILITIES: The Contractor’s tank truck loading and shipping facilities shall provide unrestricted access to Government-furnished tank trucks, be capable of bottom loading product, be equipped with a Scully system (or compatible), be equipped with Temperature Compensating Meters to accurately measure the product being loaded, and be able to load a maximum of four 8,000 gallon tank trucks per hour. The Contractor’s tank truck loading facilities shall be in compliance with Federal, State, and local environmental laws and regulations based upon the type of product being loaded. The loading of Government-furnished tank trucks shall not be in competition with the Contractor’s other terminal operations.
3.3 DOCK & BERTHING FACILITIES: The Contractor shall possess or have dedicated access to dock and berthing facilities capable of receiving and berthing barges of at least 4,200 dead weight tons (DWT) with a draft of 11 feet at mean low water at the dock. The facilities must be equipped with a turning dolphin capable of handling these vessels.
3.4 PIPELINE FACILITIES: The Contractor’s-furnished pipeline system from the Contractor’s terminal to Dover Air Force Base shall be capable of delivering product at a minimum rate of 28,000 barrels per day (24 hours continuous pumping) on an as required basis. The contractor’s operational procedures for the pipeline to Dover Air Force Base must provide for the Contractor’s personnel to operate the manifold connection between the Contractor’s pipeline system and the Dover Air Force Base manifold and storage facility. The Contractor’s pipeline system to Dover Air Force Base shall be equipped with a temperature-compensating meter capable of accurately measuring the volume of product shipped. The DD Form 1348-7 documents covering pipeline and tank truck shipments will be prepared by the Contractor and will reflect in the quantity shipped column the amounts indicated by the temperature compensating meter.
3.5 FILTRATION FACILITIES: The Contractor-furnished filtration system shall meet the requirements of API Bulletin 1581, current version, “Category M” and “Type S” for product filtration during barge/pipeline and tank truck receipt, tank-to-tank transfers, pipeline shipping, and tank truck loading. The Government will reimburse the Contractor for the cost of the replacement filter elements and for the disposal of the used filter elements.
3.6 LABORATORY FACILITIES: The Contractor shall provide space, equipment, and supplies to perform the fuel specification test required by MIL-STD 3004, “Department of Defense Standard Practice, Quality Assurance/Surveillance for Fuels, Lubricants, and Related Products,” latest edition.
3.7 ADDITIVE INJECTION SYSTEM: The Contractor’s additive injection system shall provide a separate injection system (pump and ancillary connection facilities) for the injection of each Government-furnished additive (FSII, CI, SDA) into the product during pipeline shipment and tank truck loading operations, (see DLA Energy Internal Instruction F45.01- Operation Of Conductivity Additive System, F45.03 - Operation Of Fuel System Icing Inhibitor Additive System (COCO) , and F45.04 - Operation Of Corrosion Inhibitor Additive System).
3.8 BACKUP POWER: The Contractor shall provide sufficient backup power capability to ensure continued performance at the required levels during periods of commercial power outage.
4 QUALITY SURVEILLANCE REPRESENTATIVE (QSR) SUPPORT:
4.1 Office Facility Support: The Contractor shall furnish, as a minimum, office space of approximately 110 square feet and furniture for use by the Government QSR. Furniture items include a 3-drawer desk, one swivel chair with arms, one straight chair, 2-shelf bookcase, 3-drawer letter size locking file cabinet, and ten-digit desk top calculator. Contractor shall provide janitorial services for the QSR office space of the same quality and type that is provided for his own office area at the terminal.
4.2 Telephone Support: The Contractor shall furnish a telephone and phone recorder with remote access device installed on a dedicated line for use by the QSR. The installation charge and monthly telephone bill will be reimbursed to the Contractor upon presentation of supporting documentation and an invoice certified by the QSR. No fee or administrative charge will be added to the telephone bill.
4.3 Facsimile Machine: The Contractor shall obtain and provide a facsimile machine capable of transmitting and receiving faxes at standard commercial speeds. The facsimile machine shall be placed on a suitable table beside the telephone. The facsimile machine and telephone shall be for exclusive use of the Government QSR to transmit and receive data between DLA Energy/Department of Defense activities and the Contractor's terminal.
4.4 Facsimile Machine Telephone: The Contractor shall obtain and provide a commercial telephone on a dedicated line for use with the facsimile machine. Telephone for the facsimile machine shall not be utilized for any other purpose. The Government will reimburse the Contractor for direct out-of-pocket cost costs associated with the telephone services upon receipt of a QSR certified invoice itemizing the long distance charges. No fee or administrative charges will be allowed to be added to the bill.
4.5 Photocopy Type Reproduction Machine: The Contractor shall provide a photocopy type reproduction machine that is capable of handling letter and legal size copies. The Contractor shall provide sufficient quantities of both sizes of paper to meet the terminal's and QSR's copy requirements
5 BEST COMMERCIAL PRACTICES: In the absence of any contract provisions or reference to a method, specification, or other instruction, the Contractor shall perform all services specified herein using commonly accepted best commercial practices.
CONTRACT LINE ITEM 1001 (MUCC) (long-term): The prices for the services and facilities to be provided during the performance of the five-year period beginning 1 November 2011 to 31 October 2016 includes the following:
TANK NUMBER
TANK TYPE
PRODUCT TO BE
STORED
SHELL CAPACITY
(BARRELS)
FILL CAPACITY
(BARRELS)
USE CHARGE PER
TANK PER MONTH
(INCLUDES INITIAL
FILL AND FINAL
SHIPMENT)
PRICE
ANNUAL PRICE
$/BBL/YR
SUBLINE ITEM 1001AA - EXCESS THROUGHPUT (EXTP): In excess of 1,857,000 barrels of throughput, not including initial fill, per year or prorated part thereof for any part year that the use of storage is limited to a period of less than one year, the contractor will be reimbursed $______ per barrel. Throughput is defined as receipts plus issues divided by two.
CONTRACT LINE ITEM 1002 - LABORATORY SERVICE (LABS): The Contractor will be reimbursed for Laboratory Support Services (See DLA Energy Internal Instruction C19.07).
CONTRACT LINE ITEM 1003 - FILTERS (FLTR): The Contractor will be reimbursed for filter replacement and disposal. (See Performance Work Statement, Section 3.5)
CONTRACT LINE ITEM 1004 INJECTION OF FUEL ICING INHIBITOR (FSII): The Contractor will be reimbursed at ____ per barrel. (See DLA Energy Internal Instruction F45.03)
CONTRACT LINE ITEM 1005 INJECTION OF ANTI-STATIC ADDITIVES (IFCA): The Contractor will be reimbursed at (multiyear) per barrel. (See DLA Energy Internal Instruction F45.01)
CONTRACT LINE ITEM 1006 INJECTION OF CORROSION INHIBITOR ADDITIVE (SDA): The Contractor will be reimbursed at (multiyear) per barrel. (See DLA Energy Internal Instruction F45.04)
CONTRACT LINE ITEM 1007 OVERTIME (OVRT): Overtime – Services other than normal working hours shall be ordered for this Subline item. The overtime rates listed below shall apply, unless altered by union agreement or Government regulations. The Contracting Officer shall be notified by the Contractor of any changes to these rates, which shall be supported, with copies of the appropriate union agreement or formal Government notice.
EMPLOYEE CLASSIFICATION OVERTIME
General Maintenance Worker $ Material Handling Laborer $ Fuel Distribution System Operator $ Guard $ Fuel Distribution System Mechanic $ Accounting Clerk II $ Secretary I $ Shipping and Receiving Clerk $
CONTRACT LINE ITEM 1008 HARBOR (FEES): The contractor shall be reimbursed for tolls/harbor fees and charges it is required to pay. Support documentation is required.
CONTRACT LINE ITEM 1009 COMMUNICATION (COMM): The installation charge and monthly telephone bill will be reimbursed to the Contractor upon presentation of supporting documentation and an invoice certified by the QSR. No fee or administrative charge will be added to the telephone bill. (See Performance Work Statement, Section 1.6.2 and 4.2)
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
INT-C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)
(a) The entire facility shall be enclosed by a fence suitable to deter unauthorized access. The fence shall be fitted with gates that may be padlocked when not in use.
(b) A method of visitor and entrance control will be in effect. A visitor register shall be maintained.
(c) An internal, self-powered communication system linking all critical points of the facility, capable of serving both as an alarm system and for conduct of terminal operation, will be in use.
(d) A water supply and fire-fighting equipment conforming to National Fire Protection Association and American Petroleum Institute standards will be maintained. At locations outside the United States, other standards may be used with prior approval of the Contracting Officer.
(e) In the event of an emergency at a CONUS COCO terminal, the Contractor shall seek the assistance of the following as appropriate: local ambulance service; local fire department; local, county, and State police; regional office of the Federal Bureau of Investigation; Secret Service; U.S. Marshal's Service; and the Federal Emergency Management Agency.
INT-C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)
Storage tanks for DLA ENERGY use shall be equipped with positive water sumps for removal of all water bottoms. All storage tanks shall be drained of water a minimum of once each week and whenever storage tank gauging indicates water is present. (Weekly water drainage is necessary because the datum plate may not necessarily be the low point in the storage tank. Water could possibly accumulate below the datum plate and not show up in the gauging process.) Additionally, all storage tanks shall be drained of water prior to any transfer of fuel and after a minimum of 4 hours or maximum of 24 hours settling time following each product receipt. Storage tanks equipped with floating roofs shall be gauged for water after each rain and drained if water is found present. Product and water levels shall be gauged before and after the draining of water. Water gauges of each storage tank shall be taken and recorded each time it is gauged for product. (Each storage tank shall be equipped with a fuel/water separation system for collection of all product or water dispensed from its bottom water drain(s). This system shall have the capability to return separated product back into the same storage tank.)
INT-C19.07 SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) (DLA ENERGY
OCT 2001)
(a) SAMPLING. The samples identified in the solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. The Contractor must provide these samples using qualified personnel, facilities, and equipment on-site and shall include all associated costs in the monthly service charge. These on-site resources may be provided by Contractor personnel or by commercial source acting on behalf of the Contractor. The Quality Representative will not be responsible for taking any samples for the Contractor. All samples must be taken in accordance with ASTM D 4057, Standard Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1).
(b) TESTING. The tests identified in this solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. Those tests identified in the attachment which are part of a higher order analysis (defined as follows: Composite Samples, Storage Tanks After Receipt, Interface Mixture, Dormant Stocks, and Individual Tests, including particulate contamination) shall be provided by the Contractor using one of the following options (the Contractor shall check the appropriate box below):
[ ] The Contractor will perform the tests using its own qualified personnel, facilities, and equipment. (All costs for this service are to be included in the monthly service charge.)
[ ] The Contractor will not perform the tests using its own personnel, but will provide on a seven days per week, 24 hours a day basis, it’s own facilities and equipment for testing of product by Government personnel. (All costs for this service are to be included in the monthly service charge.)
[ ] The Contractor will not provide its own personnel, facilities, or equipment. Instead, the Contractor will, within 24 hours after sampling, transport any sample(s) to a commercial laboratory approved by the Government and arrange for that commercial laboratory to perform all the required tests. The Government, at its own option, may direct that samples be tested at a Government laboratory under contract to the Government. In this case, transport of such samples is still the responsibility of the Contractor. (The Government will reimburse the Contractor for the actual costs of the tests performed by their commercial laboratory. All other associated costs must be included in the monthly service charge.)
All other tests found in the above referenced attachment, which are not part of a higher order analysis, shall be provided in accordance with the CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) clause.
(c) All facilities and equipment to be provided, whether that of a Contractor or a commercial laboratory, must conform to the standards for such facilities and equipment established by the Occupational Safety and Health Act and the National Fire Protection Association or local regulations, whichever is more stringent.
SECTION E – INSPECTION AND ACCEPTANCE
52.246-4 INSPECTION OF SERVICES -- FIXED-PRICE (AUG. 1996)
(a) Definition: “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may --
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(2) Reduce the contract price to reflect the reduced value of the services performed.
(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may --
(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or
(2) Terminate the contract for default.
(End of Clause)
INT-E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000)
(a) Upon award, the Contractor shall prepare, in triplicate and in English, a Quality Control Plan (QCP). Prior to the first receipt of Government-owned product into the facility, two copies of the QCP shall be forwarded to the Contracting Officer and one copy to the assigned Quality Assurance Representative for approval.
(b) The QCP shall include the following quality control procedures employed by the Contractor.
(1) Receiving (both product and additives);
(2) Blending;
(3) Sampling;
(4) Testing;
(5) Storage and handling;
(6) Loading and shipping;
(7) Calibration program for testing and measuring equipment in accordance with ISO 10012-1, "Quality Assurance Requirements for Measuring Equipment, Part I." Equivalent local regulation, as appropriate, may be used as well. Whichever program used must include a section addressing meter proving (used to determine quantity) and must comply with the American Petroleum Institute Manual of Petroleum Measurement Standards, Chapters 4, 5, and 6, or equivalent foreign standard. For any item that requires calibration but is not covered by ASTM, API, or IP publications, the applicable manufacturer's recommended calibration method(s) outlined in the applicable industry publication shall be used if acceptable to the Government;
(8) Quantity measurement;
(9) Records and reports; and
(10) Corrective action procedures (to include, but not be limited to, procedures for notification of Quality Representative, actions to be taken on discovery of off-spec product during receipts/shipments, upgrading procedures for Contractor-caused contamination, leaks, etc.). The QCP shall also include an organizational chart of key personnel and their responsibilities and a schematic diagram of the facility with key inspection/activity points marked for each product handled.
(c) The QCP shall require that each Contractor employee be familiar with its content and shall state that it must be reviewed semiannually and revised as needed. Revision should occur when any change is made to the inspection system, when any corrective action needs to be incorporated due to quality problems, and as otherwise necessary. The Contractor shall sign and date each revision of the QCP.
INT-E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA
ENERGY NOV 2003)
(a) The Contractor shall maintain and make available upon request the following historical data relative to each storage tank provided:
(1) Date and type of construction;
(2) Name of installing contractor;
(3) Product service (past and present) and dates;
(4) Date of last cleaning/physical entry inspection and contractor's name;
(5) Structural condition based on cycle inspection at the time of cleaning or repair;
(6) Record or tank repairs;
(7) Tank dimensions and capacity;
(8) Inspection and tank cleaning frequency (date of next mandatory inspection, when tank out of service, required);
(9) Tank coating history;
(10) Tank strapping charts;
(11) As built drawings (if available); and
(12) Records of product tests and trends.
(b) At the Contractor's expense, the Contractor shall empty, inspect, and clean each bulk petroleum storage tank and dispose of all tank bottom waste for each tank furnished under this contract at the following intervals. When tank cleaning does take place, the Contractor, at his own expense, shall be responsible for providing alternate tankage and transferring the remaining product to that tankage.
Such tankage shall be suitable for storing the transferred product and shall be of equal or greater capacity than the tankage being cleaned.
Any proposed reduction in the storage capacity cited in the contract must be approved by the Contracting Officer in advance.
(1) AVIATION FUEL STORAGE TANKS.
(i) Every 4 years for uncoated storage tanks without an inlet-filter separator;
(ii) Every 6 years for either a coated tank without an inlet filter separator, or for an uncoated tank with an inlet-filter separator; and
(iii) Every 8 years for coated tanks with an inlet-filter separator.
(iv) For storage tanks with direct receipt of fuel from barge or tanker, the frequency for physical entry inspection and cleaning will be 3, 5, and 8 years for (i), (ii), and (iii) above, respectively.
(v) Tanks will be emptied, cleaned, and inspected more frequently than the periods stated in (i) through (iv) above when sample analysis indicates a build up of sediment in the tanks.
(2) GROUND AND MARINE FUEL STORAGE TANKS. Tanks will be emptied, cleaned, and inspected when sample analysis indicates a build up of sediment in the storage tanks.
(c) The time for cleaning will be measured from the date of the last cleaning regardless of whether the tank was under contract with DLA ENERGY at the time of the last cleaning.
(d) Samples will be taken and tested at Government expense. If tank cleaning is required earlier than the criteria listed in (b)(1) above and the Government is shown to be at fault, then the Government will be responsible for cleaning, sampling, and testing costs.
In all other cases, tanks requiring cleaning will be removed from revenue and cleaned at the Contractor's expense.
(e) At the time of offer submission, the offeror shall provide the Contracting Officer with a listing of all tank inspections and cleanings, and other activities that would take a tank out of service, which are anticipated to occur during the contract period (see chart below). This listing shall include the tank number, location, reason for being out of service, dates the tank will be out of service and provisions that have been made to replace the tankage while it is out of service. Updates to the listing shall be sent to the Contracting Officer as soon as a change is known.
Tank Number Location Reason Dates Replacement Tankage
INT-E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY
JAN 2009)
The following lists shall be used to identify the Government inspection office assigned inspection responsibility for DLA ENERGY contracts in a particular geographic area. These contracts include, but are not limited to, those for bulk petroleum products and additives, into-plane refueling, petroleum storage and laboratory services, coal, aerospace energy (including compressed gases), and posts, camps, and stations. The area of inspection responsibility and corresponding office code are assigned in paragraphs (a) and (b). The address and phone number of each inspection office by office code is provided in paragraph (c). Unless a particular inspection office is identified in another part of the contract, the assignments in this clause shall apply.
(a) AREAS OF RESPONSIBILITY AND OFFICE CODES WITHIN THE CONTINENTAL UNITED STATES
(CONUS):
Alabama 110 Maine 110 Oklahoma 110 Arizona 120 Maryland 110 Oregon 120 Arkansas 110 Massachusetts 110 Pennsylvania 110 California 120 Michigan 110 Rhode Island 110 Colorado 120 Minnesota 110 South Carolina 110 Connecticut 110 Mississippi 110 South Dakota 110 Delaware 110 Missouri 110 Tennessee 110 District of Columbia 110 Montana 120 Texas 110 Florida 110 Nebraska 110 Utah 120 Georgia 110 Nevada 120 Vermont 110
Idaho 120 New Hampshire 110 Virginia 110 Illinois 110 New Jersey 110 Washington 120 Indiana 110 New Mexico 120 West Virginia 110 Iowa 110 New York 110 Wisconsin 110 Kansas 110 North Carolina 110 Wyoming 120 Kentucky 110 North Dakota 110 Louisiana 110 Ohio 110
EXCEPTIONS:
(1) The El Paso, Texas, area is assigned to Code 120 (DLA ENERGY Americas – West).
(2) The Newcastle, Wyoming, area is assigned to Code 110 (DLA ENERGY Americas – East).
(b) AREAS OF RESPONSIBILITY AND OFFICE CODES OUTSIDE THE CONTINENTAL UNITED STATES
(OCONUS) (INCLUDING ALASKA AND HAWAII):
Afghanistan 400 Cyprus 200 Malaysia 300 Singapore 300 Africa 2001 Egypt 4001 Maldives 300 South America 110 Alaska 300 Europe (Continental) 200 Malta 200 South Korea 300 Antarctica 300 Georgia 200 Mauritius 200 Sri Lanka 300 Armenia 200 Greenland 200 Mexico 110 Syria 400 Ascension Island 110 Hawaiian Islands 300 Midway Island 300 Taiwan 300 Australia 300 Hong Kong 300 Mongolia 300 Tajikistan 400 Azerbaijan 200 Iceland 200 Myanmar 300 Thailand 300 Azores 200 India 300 Nepal 300 Turkey 200 Bahrain 400 Indonesia 300 New Zealand 300 Turkmenistan 400 Bangladesh 300 Ireland 200 North Korea 300 United Arab Bermuda 110 Iran 400 Oman 400 Emirates 400 Bhutan 300 Iraq 400 Pacific Islands United Kingdom 200 Brunei 300 Israel 200 (Central & South) 300 Uzbekistan 400 Cambodia 300 Japan 300 Pakistan 400 Vietnam 300 Canada 110/1202 Jordan 400 Papua New Guinea 300 Wake Island 300 Canary Island 200 Kazakhstan 400 Philippines 300 Yemen 400 Caribbean Islands 110 Kuwait 400 Qatar 400 Central America 110 Kyrgyzstan 400 Russia 200 Chagos Archipelago 300 Laos 300 Ryukus Islands, Japan 300 China 300 Lebanon 400 Saudi Arabia 400 Comoros 200 Madagascar 200 Seychelles Is. 420
[1] Except for Egypt, which is assigned to DLA ENERGY Middle East (Code 400), all other countries in Africa fall under DLA ENERGY Europe (Code 200).
[2] The provinces of Manitoba, Ontario, Quebec, Newfoundland and Labrador, New Brunswick, Nova Scotia, and Prince Edward Island are assigned to DLA ENERGY Americas East (Code 110). The rest of Canada falls under DLA ENERGY Americas West (Code 120).
(c) INSPECTION OFFICES AND CODES.
110. DLA ENERGY Americas East 3 ATTN: Quality Manager Federal Building, Room 1005 2320 LaBranch Street Houston, TX 77004-1091 Phone: (713) 718-3883, ext. 162/161/160
FAX: (713) 718-3891
120. DLA ENERGY Americas West 3
ATTN: Quality Manager 3171 N Gaffey Street San Pedro, CA 90731-1099 Phone: (310) 241-2806/2807
FAX: (310) 241-2836
200. DLA ENERGY Europe 3 Mailing Address:
DLA ENERGY Petroleum Lab ATTN: Quality Manager
CMR 422
APO AE 09067-0422
[Location: Kaiserslautern, Germany] Phone: 49-631-3406-2285/2286 4
FAX: 49-631-3406-2289 4
Shipping Address:
DLA ENERGY Petroleum Lab ATTN: Quality Manager Rhine Ordinance Barracks , Bldg 320 Am Opelkreisel 67663 Kaiserslautern, Germany
300. DLA ENERGY Pacific 3 ATTN: Quality Manager 1025 Quincy Avenue, Building 479, Suite 2000 Pearl Harbor, HI 96860-4512 Phone: (808) 473-4307/4287
FAX: (808) 473-4232
400. DLA ENERGY Middle East 3 ATTN: Quality Manager PSC 451, Box DLA ENERGY-ME
FPO AP 09834-2800
[Location: Juffair, Bahrain] Phone: 973-17-85-4658/4665 4
FAX: 973-17-85-4670 4
[3] Designated location of the DLA ENERGY Regional Quality Manager/Pre-Award Survey Monitor.
[4] Dial 011 before these numbers when calling from the U.S. When calling these numbers from outside the U.S., use the appropriate international long distance prefix for the country where the call originates.
INT-E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA ENERGY OCT
2002)
(a) Inspection and tests by the Government of services, facilities, and equipment specified within this contract does not relieve the Contractor from responsibility to meet all requirements of the contract.
(b) The Contractor shall furnish personnel, facilities, and equipment on-site to accomplish the following routine tests and procedures. These on-site resources may be provided by Contractor personnel or by a commercial source action on behalf of the Contractor.
The Quality Representative will not be responsible for performing any of these services for the Contractor.
(1) Sampling of storage tanks, shipments and receipts in accordance with ASTM D 4057, Standard Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1);
(2) Retaining of product composite samples from shipments and receipts as follows:
MINIMUM
METHOD OF SHIPMENT MINIMUM QUANTITY RETENTION PERIOD
Pipeline 20 liters 60 days
Tanker/Barge Parcel Composite 20 liters 90 days Each compartment 0.5 liters 90 days
Navy Fleet Oilers/Vessels 10 liters 60 days
Tank Truck/Car 1 liter 15 days
NOTE: After the minimum retention period, samples shall be tested for Appearance, Color (Visual), API Gravity/Density and Flash Point and, if found to be on-specification, shall be returned to like Government stock on-site. Sample containers may be reused if properly cleaned.
(3) Determining the presence of water in storage tanks, shipments and receipts. Ensure that accurate water cuts are obtained by means of a water indicating paste conforming to MIL-W-83779B. Two suggested sources are Stewart Hall Chemical Testmaster Water Indicating Paste or Sartomer Sar Gel Water Indicating Paste (see Note 2 below);
(4) Determining Density at 15 degrees Celsius or API gravity of products by ASTM D 1298 or ASTM D 4052 (see Note 2 below);
(5) Determining the temperature of products by the API MPMS, Chapter 7 (see Note 2 below);
(6) Determining the Appearance of applicable products using ASTM D 4176, Procedure 1 (see Note 2 below);
(7) Determining the visual color of products.
(8) Determining the Flash Point of applicable products using test methods cited in the appropriate product specification (see Note 2 below);
(9) Conversion of gross to net gallonage (liters);
(10) Determining the percentage (volume) of fuel system icing inhibitor (FSII) by means of a portable refractometer in accordance with ASTM D 5006. One suggested source is H.B. Industries, Inc., Glenview, IL 60025 (B/2 Anti-Icing Additive test kit) (see Note 2 below); and
(11) Determining the range of fuel electrical conductivity using ASTM D 2624. One suggested source for a conductivity meter is Emcee Electronics, Inc., Sarasota, FL 33581 (Model 1152) (see Note 2 below).
Note 1: All costs for providing the above tests and procedures shall be included in the monthly service charge. The only exception to the Contractor’s obligation to provide these services as part of the monthly service charge is when the tests described above are part of the higher order analysis (defined as the following categories: Composite Samples, Storage Tanks After Receipt, Interface Mixtures, Dormant Stocks and Individual Tests (including particulate contamination) found in the attachment to the solicitations entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING. Provisions for providing higher order analyses are covered in the SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) clause.
Note 2: Upon request, the Contractor shall permit the Quality Representative unrestricted use of the equipment and ancillary supplies needed to perform this test/procedure on behalf of the Government.
(c) During the contract, the Contractor shall furnish representative samples of the product in each storage tank, shipment or receipt at the request of, and in the manner and to the place designated by, the Quality Representative. Sample size will be 2 gallons for gasoline-type fuels and one gallon or 10 gallons for jet diesel-type fuels. The number of samples to be furnished during any 12-month period shall not exceed eight times the number of tanks specified in the contract. Such samples shall be packed, marked, and shipped by the Contractor, shipping expense prepaid, in containers and shipping boxes furnished by the Contractor. Sample containers shall be epoxy coated on the interior. This requirement is in addition to sampling required elsewhere in this clause and the contract. All reasonable direct shipping costs associated with samples required by this paragraph shall be reimbursed upon request from the Contractor and such costs shall not be included in the monthly service charge. However, all other costs related to this requirement shall be included as part of the monthly service charge.
INT-E34 TEST FOR SULFIDES IN WATER (DLA ENERGY MAY 1987)
(a) SCOPE. This method describes a procedure for determining the presence of hydrogen sulfide, which is sometimes formed as a result of bacterial action on the sulfates contained in water bottoms in fuel storage tanks.
(b) APPARATUS. 250 ml conical flask.
(c) MATERIALS.
(1) Dilute (10%) chemically pure sulfuric or hydrochloric acid.
(2) Lead acetate paper.
(d) SAMPLES. Representative water samples from storage tank bottoms must be taken in a glass bottle. In some cases it will be necessary to take the water sample in a Bacon bomb sampler. Samples so taken will always be transferred to a glass bottle. To preclude oxidation by air, the filled bottle must be capped immediately. The sample should be tested as soon as possible after sampling to minimize possible changes in the composition of materials in the water.
(e) PROCEDURE.
(1) The sample must be shaken thoroughly just prior to performing the test to make certain that any sediment present is included in the portion of the sample to be tested.
(2) Transfer 100 ml of the shaken sample into a conical flask. Add 20 ml of dilute (10%) chemically pure sulfuric or hydrochloric acid to the flask. Immediately place a piece of lead acetate paper folded in a "V" shape in the neck of the flask. Bring the water to a boil and continue to gently boil for three or four minutes.
(f) REPORT. The presence of sulfides in the sample will be…