AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
K
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
04 JANUARY 2011
4. REQUISITION/PURCHASE REQ.NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE
SP0600 7. ADMINISTERED BY (If other than Item 6)
CODE
SP0600
DEFENSE LOGISTICS AGENCY ENERGY
8725 JOHN J. KINGMAN RD, SUITE 4950
FT. BELVOIR, VA 22060-6222
BUYER/SYMBOL: Jamaal Rose DLA ENERGY-PCB
PPN: 1.6J
8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code) 9a. AMENDMENT OF SOLICITATION NO.
SP0600-10-R-0235
X
9b. DATED (SEE ITEM 11)
18 NOVEMBER 2010
10a. MODIFICATION OF CONTRACT/ORDER NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ___1____ copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.
FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor[ ] is not, [] is required to sign this document and return __ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.):
SEE CONTINUATION PAGES
Except as provided herein, all terms and conditions of the document referenced in Item 9a or 10a, as heretofore changed, remains unchanged and in full force and effect 15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME OF CONTRACTING OFFICER
AYBIKE ARSLAN
15B. NAME OF CONTRACTOR/OFFEROR
BY
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C.DATE SIGNED
SP0600-10-R-0235
Amendment 0004
1. The purpose of this amendment is to answer questions raised by offerors’ queries of Solicitation SP0600-10-R- 0235, regarding requirements for delivery of Turbine Fuel, Aviation TS-1, to Bagram Air Field via pipeline.
2. This Question and Answer (Q&A) provides resolution for the following questions:
QUESTION 1: Is the Contractor the responsible party to build the pipeline in order to connect to the partial pipeline that the government already has in place?
ANSWER: Yes, the contractor is the responsible party to build a pipeline to connect to the existing government pipeline at ECP3.
QUESTION 2: Being that no site visit is allowed due to security, is the Contractor responsible for all equipment (Tank Trucks and Personnel) to be located in Afghanistan so that the fuel can be transported to the Government pipeline in place?
ANSWER: Yes, it will be the contractor’s responsibility to provide all equipment and personnel necessary to provide fuel in accordance with the solicited requirement.
QUESTION 3: Does the Contractor have to at least have one federal past performance in order to be considered?
ANSWER: No, Contractors that do not have relevant past performance in providing fuel in a war zone or during contingency operations will be given a neutral rating for past performance.
QUESTION 4: Can the Contractor purchase what is in place by the previous Contractor regardless of litigation?
ANSWER: The business model chosen to fulfill the requirement will be at the discretion of the contractor.
QUESTION 5: Where can information be found concerning the pipelines or tank trucks (locations, Owner/Operations)?
ANSWER: Internet sources can be used to find information regarding privately-owned companies with pipeline and tank truck operations within the region.
| SF 30 10R0235 AMND 4.pdf |
| AYBIKE ARSLAN |
Amendment 0004 SP0600-10-R-0235