2009 09 23 Columbus Industry Preproposal Conference.ppt
PPT presentation 378 KB Posted
- Solicitation number
- SP0600-09-R-0822
- Issued by
-
Defense Logistics Agency Energy
About this file
Briefing slides for the Preproposal Conference held on September 23 2009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16Feb10 | — | |
| 2010 01 07 SF30 Amd 0005.pdf | ||
| 2009 11 16 SF30 Amd 0004.pdf | ||
| 2009 10 21 SF30 Amd 0003.pdf | ||
| 2009 10 08 SF30 Amd 0002.pdf | ||
| SF30 Amd 0001.pdf | ||
| 2009 09 02 SP0600-09-R-0822.pdf | ||
| 16Feb10 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Defense Energy Support Center Columbus AFB, Mississippi Industry Preproposal Conference Jim Shillingford Sept 23, 2009
Overview
| Purpose of the RFP |
| RFP Contents |
| Type of Contract |
| Grouping |
| The Submittal |
| The Four Volumes |
| Evaluation Process |
| Basis for Award |
| Technical Library |
| Site Visits |
| Milestones |
| DESC Points of Contact |
Purpose of the RFP Privatize the Electric, Water, and Wastewater Utility Systems at Columbus Air Force Base, Mississippi
| Sell System Infrastructure |
| Acquire Utility Services Contract (FAR 41) |
| Provide Right-of-Access |
Notes:
1. Purchase of the Commodity is not Included in the RFP
2. Selection of Contractor will be Based on Best-Value Determination
3. Government Privatizes if the Long Term Benefit Exceeds the Long Term Cost
4. Government Reserves the Right Not to Award the Contract
RFP Contents
| Section B – Supplies Or Services and Prices/Costs |
| Section C – Description/Specifications/ |
| Work Statement |
| Section E – Inspection and Acceptance |
| Section F – Deliveries or Performance |
| Section G – Contract Administration Data |
| Section H – Special Contract Provisions |
| Section I – Contract Clauses |
| Section J – List of Attachments |
| Section K – Representations, Certifications, and other Statements of Offerors |
| Section L – Instructions, Conditions, and Notices to Offerors |
| Section M – Evaluation Factors for Award |
Type of Contracts
The Government may award:
| Regulated Tariff |
| Firm-Fixed Price |
| Firm-Fixed Price with Economic Price Adjustment |
| Firm-Fixed Price with Prospective Price Redetermination |
Type of Contracts (con’t)
| Regulated Utilities |
| May Propose Tariff Pricing |
| Tariff Must be Fully and Independently Regulated (a “State-Wide” Public Utility Regulatory Authority with Jurisdiction over the Contractor) |
| Tariff Removes CAS Requirement |
| Tariff Pricing Preferred, All Other Factors Being Equal |
Type of Contract (con’t)
| Non-Regulated Entities (Non-Tariff) |
| Fixed Price Contract with Prospective Price Redetermination |
| Prices for Initial System Deficiency Corrections Remain Fixed Throughout the Contract |
| Prices for Utility Services Charge Remain Fixed for the First Two Years of Contract |
| Prices for Utility Services Charge may be Renegotiated After Two Years and Every Three Years Thereafter |
| Government will Consider Firm Fixed Price Proposals or Fixed Price with Economic Price Adjustment Proposals instead of Redetermination |
Grouping
| Definition: Making the Award of One Utility System Contingent Upon the Award of Another |
| To Gain Economies of Scale, Offeror May Choose to Group Multiple Utility Systems |
| If a Grouped Offer is Submitted, Separate Price Schedules (B-1, B-2, B-3, or B-4 and Data Sheets 1, 2, 3, 4, and 5 as Appropriate) are Still Required for Each Utility System |
| In a Grouped Offer, If the Privatization of Any Single System is not Cost Effective, the Entire Group will not be Considered for Award |
The Submittal
| Four Volumes (I – IV) |
| Technical - Volume I…………...Limit 200 Pages per System |
| Past Performance - Volume II……….Limit 50 Pages |
| Contract Documentation – Volume III……..No Limit |
| Price – Volume IV.……………………………..No Limit |
| All Four Volumes – Provide One Signed Original Hardcopy |
| Provide 4 CD ROMs with All Four Volumes on Each (Technical, Past Performance, Contract Documentation & Price) |
Note: For Hardcopy…Provide a Separate Binder for Each Volume for Each Utility System
The Four Volumes - Volume I -Technical Proposal Technical Proposal has 5 key elements:
Service Interruption/Contingency and Catastrophic Loss Plan Operations and Maintenance Plan/Quality Management Plan Initial System Deficiency Corrections and Initial Renewals and Replacements Plan Operational Transition Plan Financial Strength
The Four Volumes Volume II- Past Performance
| Past Performance Information (J39) |
| References (at least 2 but no more than 6) of Your Largest Customers of Similar Complexity and Scope within Last 5 Years |
| List of System Acquisitions in Past 5 Years that Includes, as a Minimum: |
| Name of Acquisition or Project |
| Brief Description of Contract or Subcontract |
| Total Contract Value |
| Period of Performance |
| Principle Parties Involved, Phone Numbers, and Email Addresses |
Volume II- Past Performance (con’t)
| References for Proposed Subcontractors |
| Written Statement on Status with Regulatory Authority to Include: |
| Name of Authority |
| Address/Telephone/Email Address |
| Point of Contact |
Volume III- Contract Documentation
| Signed and dated SF-33 |
| Acknowledge all Amendments |
| Representations and Certifications |
| Completed on-line with Hardcopy in Volume III and also contained in Section K of the RFP |
| CAS Notices and Certifications FAR 52.230-1 or statement citing CAS exemption |
| Exceptions to Terms and Conditions |
| Other Required Information |
| Authorized Personnel |
| Subcontracting Plan (Other Than Small Business) |
| Socioeconomic Plan |
Volume III- Contract Documentation (con’t)
| Cost Accounting Standard Disclosure Statements IAW FAR Part 30 |
| Self Insurance IAW Section H.2.4. |
| Common Proposal Shortfalls: |
| Not Listing a Positive Goal for Each Subcontracting Category in the Subcontracting Plan |
| Not Addressing all 7 Socioeconomic Items |
The Four Volumes Volume IV- Price Proposal Price Proposal consists of 4 sections:
Section 1 – Price Schedule B-1, B-2, B-3 or B-4 Section 2 – Price Proposal, Introduction & Pricing Assumptions Section 3 – Standard Estimating Methodology Section 4 – Cost Risk Assessment
The Four Volumes Volume IV- Price Proposal (con’t) Section 1 – Price Schedule B-1, B-2, B-3 or B-4
| Include completed copy of the Price Schedule (B-1, B-2, B-3 or B-4) as appropriate and IAW Section B. |
| Include completed copies of Price Schedule Data Sheets (1,2,3,4 and 5) as appropriate and IAW Section B. |
Price Schedule Data Sheet Common Mistakes:
Price Schedule Data Sheet 1 – Utility Service Charge (B.7.2)
Not Indicating Exactly How You Computed Your Operations and Maintenance Costs (Manpower, Materials, Transportation, Supplies, Etc)
Not Explaining How You Used the Price Data Shown in Schedule 2 to Mathematically Derive Your Monthly Charge for Renewals and Replacements
Price Schedule Data Sheet 2 (B.7.3)– Renewals & Replacements (50 yr schedule)
Not Including Each Inventory Line Item (Reference Table 1 of the Utility Specific Section J) in Schedule 2
Not Providing a Price for the Renewals & Replacements of Each Inventory Line Item in Each Year it is Replaced
Price Schedule Data Sheet 3 (B.7.4) – Initial System Deficiency Correction/Connection Charges/Transition Period
Not Including the Each Government Recognized System Deficiency (Reference Section J.X.11) that You Intend to Accomplish
Not Realizing Monthly Payments for a Specific Project will not Begin Until Specific Project is Complete and in Service
Price Schedule Data Sheet 4 (B.7.5) – Recoverable Portion of Purchase Price.
Not Realizing the Net Present Value of the Recoverable Portion of the Purchase cannot exceed the Net Present Value of the Purchase Price
Price Schedule Data Sheet 5 (B.7.6) – Proposal 50 yr Charges to Government
Schedule 5 - Provide a 50-year statement of proposed billings to the government in constant (real) dollars. At a minimum, Schedule 5 should include the list of cost items (appearing in Section L.7.5 ) on an annual basis for each of the 50 years. If a shorter contract period is proposed, the schedule need only address the number of years proposed for the contract.
Section 2 – Price Proposal, Introduction and Pricing Assumptions
In this section the offeror discusses:
| Its pricing methodology and explicitly shows its calculation for each CLIN. |
| Assumptions regarding price inflation in the first two years of operation and their effect on cost of service for each CLIN must be explicitly described. |
| All assumptions, scope limitations, and/or qualifications of the price proposal shall be addressed and explained for each CLIN. Assumptions are requested and will be considered by the Government solely for evaluation purposes. |
| Unless identified as an assumption in the exception matrix in accordance with Section L6.2 above and accepted as such by the Contracting Officer, Assumptions will not be deemed to be a part of any resulting contract and will not form the basis for any pricing adjustments. |
Section 2 – Price Proposal, Introduction and Pricing Assumptions
In this section the offeror :
Provides the breakdown of their proposed Utility Service Charge or Applicable Tariff Charge proposed in the appropriate Schedule B. In particular the Offeror shall differentiate between the operation and maintenance costs and renewals and replacements. This information shall be provided in a separate Schedule 1 for each utility system included in the proposal
Section 3 – Standard Estimating Methodology
In this section the offeror:
Summarize it’s standard estimating system as it pertains to this acquisition.
For Offerors proposing Cost Accounting Standards (CAS) compliant accounting systems as a Uniform System of Accounts (USOA): state whether or not your Disclosure Statement has been determined adequate by the cognizant Government ACO.
If determined adequate, provide date of approval. Identify any outstanding CAS violations; provide status/action being taken. If exempted from submitting a CAS Disclosure Statement so state, and identify the reason for the exemption.
Section 4 – Cost Risk Assessment
In this section the offeror:
Submit a risk analysis that identifies price risk areas and the recommended management approach to mitigate/control the impact of those price risks on the overall success of the program.
The format of this analysis shall be IAW the format provided in Section L.7.5 of the solicitation.
Evaluation Process
| General |
| If an award is made it will go to the offer that represents the “BEST VALUE” to the Government. |
| The 5 evaluation factors are: |
| Technical Capability |
| Past Performance |
| Risk |
| Socioeconomic Plan |
| Price |
(con’t) Technical Capability and Risk are further broken out into the following subfactors:
Technical Capability
| Subfactor 1: Service Interruption/Contingency and Catastrophic Loss Plan |
| Subfactor 2: Operations and Maintenance Plan/Quality Management Plan |
| Subfactor 3: Initial System Deficiency Corrections/Upgrades/ |
| Connections and Renewals and Replacements Plan |
| Subfactor 4: Operational Transition Plan |
| Subfactor 5: Financial Strength |
| Risk |
| Subfactor 1: Performance |
| Subfactor 2: Assurance of Long-term Price and Service Stability |
| Subfactor 3: Cost Realism |
| Subfactor 4: Other possible long-term costs and benefits to the United States may be considered, especially if the conveyance affects separate contract relationships, particularly for commodities. |
Basis for Award Basis for Contract Award
IAW 10 U.S.C. 2688, award can only be made if the long-term economic benefits exceed the long-term costs.
To determine whether that criterion is met, the Government will use the Schedule 5 for evaluation and economic analysis with federal taxes accounted for to develop a projected 50-year cash flow.
Basis for Award
If it is determined that the long-term economic benefits outweigh the long-term economic costs a BEST VALUE decision will be based upon the following evaluation criteria:
Technical Capability, Past Performance, and Risk are of approximately equal importance. Socioeconomic Plan is somewhat less important than Technical Capability, Past Performance and Risk. When combined, Technical Capability, Past Performance, Risk, and Socioeconomic Plan are significantly more important than Price. Technical Capability and Risk will be evaluated at the subfactor level. Under Technical Capability, Subfactors 1, 2, 3, 4, and 5 are of approximately equal importance. Under Risk, Subfactors 1, 2, 3, and 4 are of approximately equal importance.
Technical Library/Site Visits Contents of Library
Availability of Copies: Will be provided to all offerors that successfully complete the DD Fm 2345 certification process.
Contact Nikki Yarrington, 703-767-8456 to Schedule Library/Site Visits, if needed
Escort Requirements: Yes
Installation Access Requirements: Yes
Milestones
| Issue Request for Proposal | 2 Sep 09 | ||
| Complete Technical Library | 22 Sep 09 | ||
| Hold Preproposal Conference | 22 Sep 09 | ||
| Complete Site Visits | 23 Sep 09 | ||
| Receive Initial Proposals | 4 Dec 09 |
DESC Points of Contact
| Contracting Officer |
| James Shillingford, DSN 703-767-9556 |
| James.Shillingford@dla.mil |
| Contract Specialist |
| Nikki Yarrington, 703.767.8456 |
Nikki.Yarrington@dla.mil
File details come from the government source that posted it. Updated .