Text version

AMENDMENT OF SOLICITA TIONIMODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE 10F 6

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITIONIPURCHASE REQ. NO. 5. PROJECT NO.

0002 See Block 16C SP0600-08-1254 (lj applicable)

6. ISSUED BY CODE

I SP0600 7. ADMINISTERED BY CODE (Ifother than lIem 6) UDEFENSE ENERGY SUPPORT CENTER

8725 JOHN J. KINGMAN ROAD, SUITE 3830

FT. BELVOIR, V A 22060-6222

BUYER/SYMBOL: Jordan Salata/DESC-EA PHONE: (703)767-8131 E-MAIL: Jordan.Salata(Q)dla.mil

8. NAME AND ADDRESS OF CONTRACTOR (NO, street, city ,county, State, and ZIP Code) 9a. AMENDMENT OF SOLICITATION NO.

X SP0600-08-R-0804

9b. DATED (SEE ITEM 11) 19 June 2008 lOa. MODIFICATION OF CONTRACT/ORDER NO.

lOb. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X] is not extended

Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning _1_ copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. Ifby virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (ljrequired) Not Applicable.

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM lOA

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in payin~ office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAR 43.01

OTHER (Specify type ofmodification and authority)

E. IMPORTANT: Contractor [ ] is not, rX ] is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitationlcontract subject matter where feasible)

Utilities Privatization at the Aberdeen Proving Ground, MD

See Additional Pages for Further Details.

15A NAME AND TITLE OF SIGNER (Type or print) 16A NAME OF CONTRACTING OFFICER (Type or print)

- r-... MARTHA A. GRAY 15H. NAME OF CONTRACTOR/OFFEROR l5C. DATE SIGNED ~UNITEJ!..l!..~ OF~RlCA 16C.DATE SIGNED

A--I. ~" .A. M f2..{1 ~ /z.oOf((Signature ofperson authorized to si~) (Signature ofConlracting Offic¢1\

NSN 7540-01-152-8070 STANDAWORM30 (REV. 10-83)

PrevIOus Edition Unusable Prescnbed by GSA FAR (48 CFR) 53.243

Aberdeen Proving Ground, MD SP0600-08-R-0804 Utilities Privatization Amendment 0002

The purpose of this amendment is to establish Section C.11.3.3 of the Request for Proposals (RFP), add the Aberdeen Proving Ground electrical distribution system and corresponding Section J3 to the RFP, and set a deadline for receipt of proposals for the electrical distribution system.

A. The following Section C.11.3.3 is hereby established as follows:

C.11.3.3 Third Party Construction

(a) Where the Government contracts with a third party to construct new infrastructure that is intended to connect to the Contractor’s system, the following terms and conditions shall apply:

(1) The Contractor will provide the Government and the third party contractor with specifications (the “Specifications”) applicable under the terms of this Contract for its system components and for interconnections.

(2) The Government will require the third party contractor to renovate or construct any infrastructure that will connect to the Contractor’s existing systems in accordance with the Specifications.

(3) The Government will coordinate with the Contractor to ensure the existing system can accommodate any additional load requirements necessitated by the renovation/construction. Should the contractor determine that the existing systems require upgrades to support the additional load requirements; a price for the upgrade will be negotiated in accordance with FAR 52.243-1, Changes – Fixed- Price, Alt I.

(b) At the Government’s option, the Contractor will take ownership of system components renovated or constructed by the third party contractor to the Specifications. Any adjustment to service requirements and the contract price as a result of these actions will be in accordance with FAR 52.243-1, Changes – Fixed- Price, Alt I.

(c) The Contractor shall have the right to reasonably inspect the third party contractor’s construction of system components for which the Contractor will take ownership. The fixed-price hourly rate to be paid by the Government for such inspections shall be specified below and shall be subject to redetermination in accordance with the Price Redetermination – Prospective Clause. If no rate is specified, then inspections shall be deemed to be among the utility services included in the monthly utility service charge. Any inspection charge rates identified below will not considered in evaluation of offers for awards although rates may be addressed during negotiations.

Hourly Inspection Charge Rate: $_________ per hour.

(d) If third party constructed system components are not built to the Specifications, the Contractor shall identify such components and the basis for the discrepancy to the Government with specificity. The Government may direct the Contractor to perform any work required to bring the system into compliance with the Specifications, in which case the Contractor will be compensated in accordance with FAR 52.243-1, Changes – Fixed- Price, Alt I.

(e) In the event the parties are unable to agree on an equitable price adjustment for any of the above paragraphs, the matter shall be resolved under the provisions of this contract.

(FAR 52.241-9)

B. The following sections of the RFP are amended to incorporate the Aberdeen Proving Ground electrical distribution system. Additions to the current version of the RFP are shown in blue.

B.3 Systems to be Privatized Schedule A represents the utility systems included in this solicitation for privatization:

SCHEDULE A

Utility Systems to be Privatized

Installation Utility System

Aberdeen Proving Ground – Edgewood, MD Water Distribution

Aberdeen Proving Ground – Edgewood, MD Wastewater Collection

Aberdeen Proving Ground, MD Electric Distribution

C.3.5 Energy/Water Commodity Supply Electric and water commodity supply is not included in this contract, even if water and/or electricity production facilities are included as part of the system to be conveyed. The Government retains the right to procure or supply water and/or electricity that will be transported on the system(s) covered by this contract from any source, including the Contractor, if the Contractor proposes to supply it via an alternate proposal.

Offerors may submit an alternative proposal that includes the supply of commodities (See Section L.6.2, Alternative Proposals and Exceptions to Terms and Conditions). Such offers will be considered on a case-by-case basis. The Government will remain the customer of record and retain ownership of all commodities transported and distributed through the Contractor-owned systems unless otherwise provided in the contract. The Contractor shall, however, own wastewater from the point of demarcation, defined in Section J4, until final discharge.

SECTION J

List of Attachments

TABLE J.1-1

Installation- and Utility-Specific Attachments to RFP in the Case of Multiple Contract Awards

RFP Attachment Installation Utility System

J1 Aberdeen Proving Ground – Edgewood, Maryland

Water Distribution

J2 Aberdeen Proving Ground – Edgewood, Maryland

Wastewater Collection

J3 Aberdeen Proving Ground, Maryland Electric Distribution

L.2.1.5 Site Visits and Preproposal Conferences Pursuant to FAR 52.237-1, Site Visit, a site visit(s) will be scheduled (see below). All Offerors intending to submit an offer on a utility system may attend the site visit. The site visit is intended to provide prospective Offerors with adequate information to prepare proposals. Pot holing (digging up underground utilities to check/verify condition) by the attendees during the site visit will not be permitted.

In conjunction with the site visit(s), a pre-proposal conference will be held where Offerors will be given the opportunity to ask questions. Results of the pre-proposal conference will be documented and made available to all interested Offerors.

The following is the schedule for the water distribution/wastewater collection systems site visits and pre-proposal conference (subject to change):

(1) Pre-proposal Conference:

Installation Date Time Aberdeen Proving Ground 1:00 – 4:00 p.m “Top of the Bay” 30 Spesutie Island Rd

APG, MD 21005-5001

(2) Site Visit:

Aberdeen Proving Ground 9:00 a.m.

Building E-5185 in Edgewood

The following is the schedule for the electric distribution system site visits and pre-proposal conference (subject to change):

(1) Pre-proposal Conference:

Aberdeen Proving Ground January 8, 2009 1:00 – 4:00 p.m Building 4304 Susquehanna Ave.

(2) Site Visit:

Aberdeen Proving Ground January 9, 2009 9:00 a.m.

Building 4304 Susquehanna Ave.

L.4.2 Sub-factor 2: Operations and Maintenance/Quality Management Plan Offeror shall submit an Operations and Maintenance/Quality Management Plan (Plan) in accordance with the requirements of Section C.12, Operations and Maintenance/Quality Management, of this solicitation. Regulated utilities who have submitted documents similar to the requested Plan to their State Utility Regulatory Commission may submit that documentation in lieu of the specifically requested information in this section. The Plan will be incorporated into the contract at time of award. The Plan shall describe the Offeror’s operations and maintenance and quality management policies and procedures. The Plan shall propose performance standards and/or specifications for the provision of utility service.

When developing the Plan, the elements listed below (Table L-1) should be considered if applicable.

TABLE L-1

Service Standards Criteria

Water System Quality Reliability Recurring and

Preventative Maintenance

Sampling/ Analysis

Demand and Distribution Capacity

Water Storage Requirements

Fire Flow Capacity/ Duration

Corrosion Control (To Include Cathodic Protection)

Minimization of Water Use

Safety of Government Personnel and Property

Service Connection Standards and Specifications

Exterior Backflow Prevention

New Construction Standards

Commissioning Standards

Color Identification and Markings

System Inspections

Service Interruption Frequency

Operating Permits Employee Certifications

Disaster Recovery

Maintaining System Pressure

Minimization of Leaks and Losses

Water and Sewer Line Separation

Meter and Equipment Calibration

Wastewater System Effluent Quality Reliability Recurring and

Preventative Maintenance

Sampling/ Analysis

Permitting Demand and Collection Capacity

Pre-Treatment Requirements

(Left Blank)

Corrosion Control (To Include Cathodic Protection)

(Left Blank) Minimization of Inflow and Infiltration

Safety of Government Personnel and Property

Service Connection Standards and Specifications

Blockages and Cross Connections

Water and Sewer Line Separation

New Construction Standards

Commissioning Standards

Color Identification and Markings

System Inspections Meter and Equipment Calibration

Service Interruption Frequency

Operating Permits Employee Certifications

Disaster Recovery

Electric System Quality Limitation of Fault

Current Service Connection Standards and Specifications

System Inspections

Reliability (Left Blank) (Left Blank) Meter and Equipment Calibration

Recurring and Preventative Maintenance

Corrosion Control Line Separation Service Interruption Frequency

Availability Lightning Protection and Harmonics Problems

New Construction Standards

Operating Permits

Voltage Regulation Minimization of System Losses and Power Factor Corrections

Commissioning Standards

Employee Certifications

Demand and Distribution Capacity

Safety of Government Personnel and Property

Color Identification and Markings

C. The following is hereby incorporated into the solicitation as Section J3.

Section J3-Electrical Distribution System

D. The deadline for receipt of proposals for the Aberdeen Proving Ground electrical distribution system is April 2, 2009 at 3:00pm local time, Fort Belvoir, VA. The SF-33 attached below must be completed and signed and should accompany any proposal as required by Section L.6.1 of the

RFP.

Electric SF-33

E. All other Terms and Conditions shall remain unchanged and in full force and effect.

End of Amendment

SOLICITATION, OFFER AND AWARD

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)

RATING

PAGE OF PAGES

1 | 75

2. CONTRACT NO.

3. SOLICITATION NO.

SP0600-08-R-0804

4. TYPE OF SOLICITATION

[ ] SEALED BID (IFB)

[X] NEGOTIATED (RFP)

5. DATE ISSUED

19 JUN 2008

6. REQUISITION/PURCHASE NO.

SP0600-08-1254

7. ISSUED BY CODE

SP0600

8. ADDRESS OFFER TO (If other than item 7)

DEFENSE ENERGY SUPPORT CENTER

8725 JOHN J. KINGMAN ROAD, SUITE 3830

FT. BELVOIR, VA 22060-6222

OFFICER/SYMBOL: Douglas G. Smith/EF (703) 767-2397

FAX: (703) 767-2382 Email: Douglas.G.Smith@dla.mil P.P. 8.2

ATTN: MARTHA A. GRAY, DESC-EF, SUITE 3830

DEFENSE ENERGY SUPPORT CENTER

8725 JOHN J. KINGMAN ROAD, SUITE 3830

FT. BELVOIR, VA 22060-6222

Email: Martha.Gray@dla.mil

NOTE: In sealed bid solicitation "offer" and "offeror mean "bid" and "Bidder".

SOLICITATION

9. Sealed offers for the privatization of the electrical distribution system in original hard copy and 4 (CD) copies will be received at the place specified in Item 8, or if hand carried, in the depository located in ROOM 3830 until 3:00 PM EST local time April 2, 2009.

(hour) (date)

Caution - Late Submissions, Modifications, and Withdrawals: See Section L. Provision No. 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL: (703) 767-2397

A. NAME

DOUGLAS G. SMITH

B. TELEPHONE NO. (Include Area Code) (NO COLLECT CALLS)

(703) 767-2397

11. TABLE OF CONTENTS

(x)

SEC.

DESCRIPTION

PAGES

(x)

SEC.

DESCRIPTION

PAGES

PART I - THE SCHEDULE

PART II - CONTRACT CLAUSES

X

A

SOLICITATION/CONTRACT FORM

X

I

CONTRACT CLAUSES

X

B

SUPPLIES OR SERVICE AND PRICES/COSTS

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACH.

X

C

DESCRIPTION/SPECS/WORK STATEMENT

X

J

LIST OF ATTACHMENTS

X

D

PACKAGING AND MARKETING

PART IV - REPRESENTATIONS AND INSTRUCTIONS

X

E

INSPECTION AND ACCEPTANCE

X

K

REPRESENTATIONS, CERTIFICATIONS, AND

X

F

DELIVERIES OR PERFORMANCE

OTHER STATEMENTS OF OFFERORS

X

G

CONTRACT ADMINISTRATION

X

L

INSTRS., COND., AND NOTICES TO OFFERORS

X

H

SPECIAL CONTRACT REQUIREMENTS

X

M

EVALUATION FACTORS FOR AWARD

OFFER (Must be fully completed by offeror)

NOTE: ITEM 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within 300 calendar days (60 calendar days unless a different period is inserted by the offer) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See section I, Clause No 52.232-8)

10 CALENDAR

DAYS

20 CALENDAR

DAYS

30 CALENDAR DAYS

CALENDAR DAYS

14. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT NO.

DATE

AMENDMENT NO.

DATE

(The offeror acknowledges receipt of amendments to the solicitation for offerors and related documents numbered and dated.

15A.

NAME

CODE

FACILITY

16. NAME AND TITLE OF PERSON AUTHORIZED

AND

ADDRESS

OF

OFFEROR

CAGE CODE-

TO SIGN OFFER (Type or print)

FAX #

15B. TELEPHONE NO. (Include area code)

15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE

17. SIGNATURE

18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEM NUMBERED

20. AMOUNT (EST)

21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

[ ] 10 U.S.C. 2304(c)( ) [ ] 41 U.S.C. 253(c)( )

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

24. ADMINISTRATION BY (If other than Item 7) CODE

25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER (Type or print)

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

SECTION J3 – ELECTRICAL DISTRIBUTION SYSTEM

UTILITIES PRIVATIZATION – ABERDEEN PROVING GROUND, MARYLAND

DECEMBER 2008

J3-1

ATTACHMENT J3

Aberdeen Proving Ground Electrical

TABLE OF CONTENTS

ABERDEEN PROVING GROUND ELECTRICAL DISTRIBUTION SYSTEM

J3 ABERDEEN PROVING GROUND ELECTRICAL DISTRIBUTION SYSTEM

J3.1 Aberdeen Proving Ground Overview J3.2 Electrical Distribution System Description

J3.2.1 Electrical Distribution System Fixed Equipment Inventory J3.2.1.1 System Description J3.2.1.2 Points of Demarcation J3.2.1.3 Condition Assessment J3.2.1.4 Inventory

J3.2.2 Electrical Distribution System Non-Fixed Equipment and Specialized Tools J3.2.3 Electrical Distribution System Manuals, Drawings, and Records

J3.3 Specific Service Requirements J3.3.1 On-Site Contractor Facility J3.3.2 Temporary Contractor Facilities J3.3.3 Restricted Access Areas J3.3.4 Limited Access J3.3.5 Vehicles J3.3.6 Coordination Requirements Prior to Performing Work J3.3.7 Planning and Programming J3.3.8 Request for Action (RFA) Process J3.3.9 Mapping Requirements J3.3.10 Updated Utility Maps J3.3.11 Disposition of Removed or Salvaged Materials J3.3.12 Component Replacement J3.3.13 Excavation Marking Process

J3.3.13.1 Contractor-Provided Markings J3.3.13.2 APG-Provided Digging Permits

J3.3.14 System Survey and Assessment / Utility Record Drawings J3.3.15 Installation Design Guide J3.3.16 Supervisory Control and Data Acquisition System J3.3.17 Fire Control and Safety J3.3.18 Inspection and Maintenance J3.3.19 Environmental Issues J3.3.20 Required Regulatory Reports J3.3.21 First Response Investigation J3.3.22 Response to Service Requests J3.3.23 Utility Outage J3.3.24 Emergency Operations J3.3.25 Temporary Service

J3-2

J3.3.26 Planned Outages J3.3.27 Cost of Supporting Utilities J3.3.28 Cultural Resources J3.3.29 Standards and Regulations J3.3.30 Network Access Requirements J3.3.31 Soil Management Plan J.3.3.32 Standby Power Generation

J3.4 Secondary Metering J3.4.1 Existing Meters

J3.5 Monthly Submittals J3.6 Energy Saving Projects

J.3.6.1 General Operating Requirements Effecting Energy Saving Projects:

J3.7 Service Area J3.8 Off-Installation Sites J3.9 Specific Transition Requirements J3.10 Government Recognized System Deficiencies

LIST OF TABLES

TABLE 1 - POINTS OF DEMARCATION

TABLE 2 - FIXED INVENTORY

TABLE 3 - SPARE PARTS

TABLE 4 - SPECIALIZED VEHICLES AND TOOLS

TABLE 5 - MANUALS, DRAWINGS, AND RECORDS

TABLE 6 - EXISTING SECONDARY METERS

TABLE 7 - RECOGNIZED SYSTEM DEFICIENCIES

J3-3

J3 Aberdeen Proving Ground Electrical

J3.1 Aberdeen Proving Ground Overview Aberdeen Proving Ground (APG or the Installation) is the Army's oldest active proving ground.

APG was established on October 20, 1917, six months after the United States entered World War I, to provide the military a facility where design and testing of ordnance materiel could be carried out in close proximity to the nation's industrial and shipping centers. The Installation officially opened on December 14, 1917, and the first gun was fired on January 2, 1918.

APG covers over 72,500 acres in Harford County, Maryland located approximately 35 miles northeast of Baltimore along and into the Chesapeake Bay. The Installation’s northernmost point is marked by the confluence of the Susquehanna River and the Chesapeake Bay. On the south it is bordered by the Gunpowder River. The Installation actually includes two principal areas, separated by the Bush River. The northern area is known as the Aberdeen Area, and the southern area, formerly Edgewood Arsenal (established in November, 1917 - as a chemical weapons research, development and testing facility), is the Edgewood Area The two areas were administratively combined in 1971. APG property not attached to the main installation includes the Churchville Test Site in Harford County and Carroll Island and Graces Quarters in Baltimore County.

APG is home to 66 tenants and a host of satellite activities. Among the major tenants are the U.S.

Research, Development and Engineering (RDECOM) , U.S. Army Ordnance Center and Schools, U.S. Army Developmental Test Command, U.S. Army Aberdeen Test Center, U.S.

Army Center for Health Promotion and Preventive Medicine, Northeast Region Civilian Personnel Operations Center, U.S. Army Medical Research Institute of Chemical Defense, U.S.

Army Chemical Materials Agency and major elements of the Army Research Laboratory.

As a center for Army materiel testing, laboratory research and military training, the post is a key element in the nation's defense. All tanks and wheeled vehicles which have served U.S. forces for the past 50 years have been tested for performance and durability at APG - from the M4 Sherman tank of World War II to the M1 tank and High Mobility Multipurpose Wheeled Vehicle and Family of Stryker Vehicles of today.

Known as the "Home of Ordnance," APG has provided training for Army ordnance personnel since 1918. The Army's ordnance training was consolidated at the proving ground during World War II, and today the U.S. Army Ordnance Center and School provides mechanical maintenance training for more than 20,000 U.S. and foreign personnel each year. APG’s Ordnance Center is also the regimental headquarters for the Army's Chief of Ordnance.

The Edgewood Area has been a center for chemical warfare research and development since it was established. From the trenches of France and Belgium in World War I to the desert battlefields of Iraq nearly 80 years later, the work done at APG has contributed to the defense and safety of American forces threatened by chemical weapons.

J3-4

More than 7,500 civilians work at APG, and more than 5,000 military personnel are assigned there. In addition, there are nearly 3,000 contractors and private business employees working on the proving ground.

There are 2,148 military family members living on the post and another 155 off post. The post supports more than 16,000 military retirees and retiree family members. The post is Harford County's largest employer and one of the largest employers in the state of Maryland.

J3.2 Electrical Distribution System Description J3.2.1 Electrical Distribution System Fixed Equipment Inventory APG’s electrical distribution system consists of all appurtenances physically connected to the distribution systems between the points of demarcation separating government ownership of the distribution system from the electric supplier and separating the distribution system from end-users. The Installation’s electrical distribution systems primarily serve the Aberdeen, Edgewood and Churchville Test Areas. The system may include, but is not limited to, circuit breakers, transformers, circuits, protective devices, utility poles, duct banks, switches, street lighting fixtures, and other ancillary fixed equipment. The following description and inventory is included to provide the Offeror with a general understanding of the size and configuration of the distribution system. The Offeror shall base the proposal on site inspections, information in the Offerors’ technical library, other pertinent information, and to a lesser degree the following description.

The Offeror shall base its proposal on the description and inventory listed in Section J3, on site inspections, information in the technical library and other pertinent information. The Offeror’s proposal first shall be based on the information that the Government provides in the solicitation, Section J3 and inventory. As described in RFP Section C11.1, Equitable Adjustment, if after award the Offeror identifies additional substantial inventory not listed in Section J3.2.1.4, the Offeror may submit to the Contracting Officer a request for an equitable adjustment. If the Offeror determines that the inventory listed in Section J3.2.1.4 is overstated / understated, the Offeror shall report the extent of the overstatement/understatement to the Contracting Officer, who will determine an equitable adjustment.

The Government uses the following useful lives in determining the value of the electrical distribution system to be privatized:

Component Useful Life OH conductor 35 years UG Conductor 25 years Pole-mounted Transformers 35 years Pad-Mounted Transformers 35 years Street Lights 20 years Meters 20 years Services 35 years

J3-5

J3.2.1.1 System Description

Aberdeen Area The Government currently purchases electrical power for Aberdeen Area from Baltimore Gas & Electric Company (BG&E) at a single delivery point at the BG&E-owned Main Electric Supply Substation, which is located near the northwest corner of the Installation.

The electrical utility system is configured as a double-ended 34.5 kV sub-transmission loop supplying the distribution substations. The primary distribution system consists of a total of 50

4.16 kV and 13.8 kV circuits. The majority of the distribution circuits are configured with loop tie switches to neighboring circuits. The distribution system is composed primarily of overhead, pole-line construction (conventional open wire construction) with pole-mounted transformer banks. However, there is also a substantial amount of underground primary construction, utilizing both direct burial and duct-type construction practices. In addition to the utilization loads served from the 4.16 kV and 13.8 kV distribution systems, numerous loads are also served at utilization voltage directly from the 34.5 kV sub-transmission system.

The Government owns and operates an electrical distribution system at the Aberdeen Area consisting of:

• three 34.5 kV switching stations

• seventeen 34.5 kV distribution substations (the output of all 34.5-13.8 kV power transformers at the Aberdeen Area are adjusted to operate at 13.2 kV)

• approximately 89.03 circuit-miles of overhead primary distribution line (operating at both

4.16 kV and 13.2 kV)

• approximately 26.31 circuit-miles of underground primary distribution line (operating at both 4.16 kV and 13.2 kV)

• approximately 1,880 distribution transformers

As noted in Section J3.10, Government Recognized System Deficiencies, the Government plans to upgrade the 2.4 kV and 4.16 kV circuits to 13.8 kV within the main cantonment area of the Aberdeen area.

Substation No. 1 (Located near Building 365B) is a conventional, outdoor, air-insulated substation consisting of one 34.5 kV line termination, two 5 MVA 34.5 - 13.8 kV LTC (load tap-changing) power transformers, and seven 13.8 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for four 13.8 kV distribution feeders.

Substation No. 2 (Located near Building 333) is a 34.5 kV switching station consisting of two

34.5 kV line terminations and one 34.5 kV circuit breaker. This substation provides control and over-current protection for one 34.5 kV lateral.

Substation No. 3 (Located near Building 449B) is a conventional, outdoor, air-insulated substation consisting of one 34.5 kV line termination, two 5 MVA 34.5 - 13.8 kV LTC power transformers, and nine 13.8 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for six 13.8 kV distribution feeders.

J3-6

Substation No. 4 (Located near Building 5038) is a conventional, outdoor, air-insulated substation consisting of two 34.5 kV line termination, one 34.5 kV oil circuit breaker, two 3.75 MVA 34.5 - 4.16 kV power transformers, one 750 kVA 4.16 kV voltage regulator, and eight

4.16 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for seven 4.16 kV distribution feeders.

Substation No. 5 (Located near Building 728) is an outdoor, pad mounted substation consisting of one 1.5 MVA and one 5 MVA 34.5 - 13.8 kV LTC power transformers, and nine 13.8 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for six 13.8 kV distribution feeders.

Substation No. 6 (Located near Building 3516) is a conventional, outdoor, air-insulated substation consisting of one 34.5 kV line termination, one 34.5 kV oil circuit breaker, one 5 MVA 34.5 - 4.16 kV LTC power transformer, and two 4.16 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for two 4.16 kV distribution feeders.

Substation No. 7 (Located near Building 1126) is a conventional, outdoor, air-insulated substation consisting of one 34.5 kV line termination, one 2 MVA 34.5 - 13.8 kV LTC power transformer, and three 13.8 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for three 13.8 kV distribution feeders.

Substation No. 9 (Located near Building 2210) is a conventional, outdoor, air-insulated substation consisting of one 34.5 kV line termination, one 34.5 kV oil circuit breaker, one 5 MVA 34.5 - 4.16 kV power transformer, one 500 kVA 4.16 kV voltage regulator, and three 4.16 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for three 4.16 kV distribution feeders.

Substation No. 11 (Located near Building 859) is a conventional, outdoor, air-insulated substation consisting of one 34.5 kV line termination, one 1 MVA 34.5 - 4.16 kV LTC power transformer, and two 4.16 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for three 4.16 kV distribution feeders.

Substation No. 13 (Located near Building 394B) is a conventional, outdoor, air-insulated substation consisting of one 34.5 kV line termination, one 5 MVA 34.5 - 13.8 kV LTC power transformer, and three 13.8 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for three 13.8 kV distribution feeders.

Substation No. 14 (Located near Building 5044) is a conventional, outdoor, air-insulated substation consisting of one 34.5 kV line termination, one 2.5 MVA 34.5 - 4.16 kV LTC power transformer, and two 4.16 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for two 4.16 kV distribution feeders.

Substation No. 16 (Located near Building 259) is a 34.5 kV switching station consisting of three

34.5 kV line terminations and two 34.5 kV oil circuit breakers. This substation provides 34.5 kV loop switching, control, and over-current protection.

Substation No. 25 (Located near Building 3650) is an outdoor, pad mounted substation consisting of one 2 MVA 34.5 - 13.8 kV LTC power transformer, and two 13.8 kV metal-clad

J3-7 circuit breakers. This substation provides voltage regulation, control, and over-current protection for two 13.8 kV distribution feeders.

Substation No. 29 (Located near Building 4318) is an outdoor, pad mounted substation consisting of two 3.75 MVA 34.5 - 13.8 kV power transformers, one has load tap changers (LTC) and one does not have LTC; and nine 13.8 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for six 13.8 kV distribution

Substation No. 31 (Located near Building 3650) is a conventional, outdoor, air-insulated substation consisting of two 34.5 kV line terminations, two 3.75 MVA 34.5 - 13.8 kV power transformers, two 500 kVA 13.8 kV voltage regulator banks, and three 13.8 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for three 13.8 kV distribution feeders.

Substation No. 32 (Located near Building 120) is an outdoor unit substation consisting of one

34.5 kV metal-clad circuit breaker and one 3.0 MVA 34.5 – 0.480 kV power transformer. This substation provides utilization service delivery.

Substation B is a 34.5 kV switching station consisting of two 34.5 kV line terminations and one

34.5 kV air switch. This substation provides loop switching capability for one 34.5 kV circuit.

The electrical substations were designed to be remotely monitored from two locations. The master computer terminal, which runs Basler Electric software on the Windows operating system, is located in Building 334. It receives data from the individual substation devices over the Installation’s fiber-optic communications system. A slave terminal (using a telephone modem communications link) is located in the High-Voltage Shop. This equipment is currently inoperative.

Aberdeen Area Peak Shaving Plant: APG currently uses a peak shaving plant (fuel oil fired) with a rated capacity of 15 MW. This peak shaving plant is used to reduce the Installation’s demand during the summer and APG’s peak load contribution (PLC), which in turn reduces the cost of electric service for the installation.

a. The peak shaving plant is also used to sell electricity back to the grid when it is economic to do so. This allows APG to receive credits from the Pennsylvania- New Jersey-Maryland (PJM) Interconnection that helps to pay for the financed cost of constructing the plant. The Contractor will ensure that this functionality can continue.

b. APG has also enrolled in the Emergency Load Response (ELR) program (known as Rider 24 under BG&E) which allows APG to act as a load reduction on the grid in case of emergency or critical loads that would help keep the PJM grid up and running. The Contractor shall ensure that this function will remain intact throughout the term of the UP contract and/or the terms of the BGE ELR Program.

c. APG is also in the process of attempting to turn the peak shaving plant into an emergency generator for the northern area of the Aberdeen Area. This would allow critical loads at APG to continue running during an outage or emergency as

J3-8 an island. The Contractor shall ensure that this functionality continues to exist should the enhancements be made.

d. Although the ownership, operation and maintenance of the peak shaving plant will not be transferred with the potential privatization action, the ownership, operation and maintenance of the peak shaving plant may be re-evaluated in the future.

Edgewood Area The Government currently purchases electrical power for the Edgewood Area from BG&E at a single delivery point at the BG&E-owned Magnolia Substation, which is located near the northwest corner of the Installation.

The electrical distribution system is configured as a double-ended 34.5 kV sub-transmission loop supplying the distribution substations. The 34.5 kV sub-transmission loop was at one time operated in closed mode with protection provided by an RFL Electronics digital current differential relay system using a dedicated fiber optic communications system. However, this system was unreliable and is not being used any more. This is no longer a closed loop.

The primary distribution system consists of a total of 35 4.16 kV and 13.8 kV circuits. The majority of the distribution circuits are configured with loop tie switches to neighboring circuits.

The distribution system is composed primarily of overhead, pole-line construction (conventional open wire construction) with pole-mounted transformer banks. However, there is also a substantial amount of underground primary construction, utilizing both direct burial and duct-type construction practices. In addition to the utilization loads served from the 4.16 kV and 13.8 kV distribution systems, several loads are also served at utilization voltage directly from the 34.5 kV sub-transmission system.

The Government owns and operates an electrical utility system at Edgewood Area consisting of:

• one 34.5 kV switching station

• seventeen 34.5 kV distribution substations (the output of all 34.5-13.8 kV power transformers at the Edgewood Area are adjusted to operate at 13.2 kV)

• approximately 61.76 circuit-miles of overhead primary distribution line (operating at 2.4 kV, 4.16 kV and 13.2 kV)

• approximately 2.95 circuit-miles of underground primary distribution line (operating at 2.4 kV, 4.16 kV and 13.2 kV)

As noted in the Government identified system deficiencies, the Government plans to upgrade the

2.4 kV and 4.16 kV circuits to 13.8 kV within the main cantonment area of the Edgewood area.

Substation A (Located near Building E5128) is a conventional, outdoor, air-insulated substation consisting of two 34.5 kV line terminations, two 34.5 kV oil circuit breakers, one 3.75 MVA

34.5 - 2.4 kV LTC power transformer, and four 2.4 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for three 2.4 kV

Substation B (Located near Building E5361) is a conventional, outdoor, air-insulated substation consisting of two 34.5 kV line terminations, one 34.5 kV oil circuit breaker, one 3.75 MVA 34.5

J3-9

- 4.16 kV LTC power transformer, and five 4.16 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for four 4.16 kV distribution

Substation C (Located near Building E5681) is a conventional, outdoor, air-insulated substation consisting of two 34.5 kV line terminations, one 34.5 kV oil circuit breaker, one 1,661 kVA 34.5 kV voltage regulator, two 3.75 MVA 34.5 - 4.16 kV power transformers, and four 4.16 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for three 4.16 kV distribution feeders.

Substation E (Located near Building E3304) is a conventional, outdoor, air-insulated substation consisting of two 34.5 kV line terminations, two 34.5 kV oil circuit breakers, two 3.75 MVA

34.5 - 4.16 kV LTC power transformers, and seven 4.16 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for five 4.16 kV

Substation F (Located near Building E3364) is a conventional, outdoor, air-insulated substation consisting of two 34.5 kV line terminations, one 34.5 kV oil circuit breaker, one 1,661 kVA 34.5 kV voltage regulator, two 3.75 MVA 34.5 - 13.8 x 4.16 kV power transformers, and eight 4.16 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for five 4.16 kV distribution feeders.

Substation G (Located near Building E1520) is a conventional, outdoor, air-insulated substation consisting of two 34.5 kV line terminations, one 34.5 kV oil circuit breaker, one 2 MVA 34.5 -

4.16 kV LTC power transformer, and two 4.16 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for two 4.16 kV distribution

Substation H (Located near Building E4532) is a conventional, outdoor, air-insulated substation consisting of two 34.5 kV line terminations, one 34.5 kV oil circuit breaker, two 2 MVA 34.5 -

4.16 kV LTC power transformers, and three 4.16 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for two 4.16 kV distribution

Substation I (Located near Building E1356) is a conventional, outdoor, air-insulated substation consisting of two 34.5 kV line terminations, two 34.5 kV oil circuit breakers, one 1,661 kVA

34.5 kV voltage regulator, two 3.75 MVA 34.5 - 13.8 x 4.16 kV power transformers, and eight

4.16 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for five 4.16 kV distribution feeders.

Substation L (Located near Building E3102) is a conventional, outdoor, air-insulated substation consisting of two 34.5 kV line terminations, two 34.5 kV oil circuit breakers, one 2 MVA 34.5 -

4.16 kV LTC power transformer, and three 4.16 kV metal-clad circuit breakers. This substation provides voltage regulation, control, and over-current protection for three 4.16 kV distribution

Substation P (Located near Building E1419) is a conventional, outdoor, air-insulated substation consisting of one 34.5 kV line termination, one 2 MVA 34.5 - 13.8 kV LTC power transformer, one 750 kVA 13.2 - 4.16 kV step-down transformer, and four 13.8 kV metal-clad fused-

J3-10 interrupter switches. This substation provides voltage regulation, control, and over-current protection for two 13.8 kV and one 4.16 kV distribution feeders.

Substation P1 (Located near Building E3599) is a 34.5 kV switching station consisting of four

34.5 kV line terminations and three 34.5 kV oil circuit breakers. This substation provides 34.5 kV loop switching, control, and over-current protection.

Substation Q (Located near Building E5100) is a conventional, outdoor, air-insulated substation consisting of one 34.5 kV line termination and one 1.5 MVA 34.5 - 0.480 kV power transformer.

This substation provides utilization service delivery.

Substation R (Located near Building E5943) is a conventional, outdoor, air-insulated substation consisting of two 34.5 kV line terminations, one 34.5 kV oil circuit breaker, and one 1 MVA

34.5 - 0.480 kV LTC power transformer. This substation provides utilization service delivery.

Substation T (Located near Building E4303) is a conventional, outdoor, air-insulated substation consisting of one 34.5 kV line termination and one 2 MVA 34.5 - 0.480 kV power transformer.

This substation provides utilization service delivery.

Substation U (Located near Building E3839) is an outdoor unit substation consisting of one 34.5 kV fused interrupter switch and one 2.5 MVA 34.5 – 0.480 kV power transformer. This

Substation V (Located near Building E4515) is an outdoor unit substation consisting of one 34.5 kV fused interrupter switch and one 2.0 MVA 34.5 – 0.480 kV power transformer. This

Substation W (Located near Building E4514) is an outdoor unit substation consisting of one 34.5 kV fused interrupter switch and one 2.0 MVA 34.5 – 0.480 kV power transformer. This

The electrical substations were designed to be remotely monitored from two locations. The master operator workstation, which runs Advanced Control Systems software, is located in Building E1375. It receives data from the individual substation devices over a dedicated fiber-optic communications system. A remote terminal is also located in Building E5126. This equipment is currently inoperative.

Churchville Test Area The Government currently purchases electrical power for the Churchville Test Area from Delmarva Power Company (DPC) at a single delivery point from one of DPC’s 4.16 kV primary feeder, which is located near the northwest corner of the site.

The Government owns and operates an electrical distribution system at Churchville Test Area consisting of approximately 0.44 circuit-miles of 4.16 kV overhead primary distribution line. It is conventional, open wire, pole-line construction with pole-mounted transformer banks.

Carroll Island The Government purchases electrical power for Carroll Island from BG&E at a single delivery point from one of BG&E’s primary feeders.

J3-11

The Government owns and operates an electrical distribution system at Carroll Island consisting of approximately 1.45 circuit-miles of 3-phase 2.4 kV overhead primary distribution line. The overhead line is conventional, open wire, pole-line construction with pole-mounted transformer banks.

Graces Quarters The Government purchases electrical power for Graces Quarters from BG&E at a single delivery point from one of BG&E’s primary feeders.

The Government owns and operates an electrical distribution system at Graces Quarters consisting of approximately 0.90 circuit-miles of 3-phase 13.2 kV and 0.56 circuit miles of single phase 13.2 kV primary overhead distribution line. The overhead line is conventional, open wire, pole-line construction with pole-mounted transformer banks.

J3.2.1.2 Points of Demarcation

The point of demarcation is defined as the point on the distribution system where ownership changes from the system owner to the building owner. The electrical distribution system consists of all components from the point where APG takes ownership from the supplier to the point where electrical service is delivered to end-users.

Table 1 identifies the type of service and general location of the point of demarcation with respect to each building served by the distribution system.

TABLE 1

Points of Demarcation Electrical Distribution System, Aberdeen Proving Ground, Maryland

Point of Demarcation Applicable Scenario Sketch

Point of demarcation is the down current side of the meter

Residential service and a self-contained meter installation.

Electric Meter exists within five feet of the exterior of the building on an underground secondary line.

downstream side of the demand side of the meter pan or the first isolation device supply point.

Residential service without meter but has a meter pan and / or an isolation device.

None.

Structure

Pad Mounted Transformer

Point of Demarcation

Distribution Line

S P

Meter

J3-12

Point of Demarcation Applicable Scenario Sketch

Secondary terminal of the transformer inside of the structure.

All non-residential service with transformer located inside of structure and an isolation device is in place with or without a meter.

Note: Utility Owner must be granted 24-hour access to transformer room.

Service LinePoint of Demarcation

Isolation Device

Secondary terminal of the transformer inside of the structure.

All non-residential service with transformer located inside structure with no isolation device in place.

Note: Utility Owner must be granted 24-hour access to transformer room.

Service LinePoint of Demarcation supply point inside the first isolation device located on or inside the building.

All non-residential facilities located within a building such as airfield lighting, water wells, pump house, treatment plants, lift stations, etc.

supply point inside the first isolation device at the immediate proximity of the electric load served.

For all facilities not located in a building such as airfield lighting, water wells, pump house, treatment plants, lift stations, etc.

J3.2.1.3 Condition Assessment

The electrical distribution system is a mixture of components installed on average between the 1960s and the 2000s. Though some older components require near-term replacement, the electrical distribution system is generally in good condition.

Several substations are over 35 years old and are approaching the end of their design life. They will require minor updates and modernization for life extension. The existing monitoring system only identifies the current loads on the system and does not provide any control capability.

The electrical distribution system is a mixture of components installed on average between the 1960s and the 2000s. Though some older components require near-term replacement, the electrical distribution system is generally in good condition.

Several substations are over 35 years old and are approaching the end of their design life. They will require minor updates and modernization for life extension.

J3-13

Churchville Test, Carroll Island and Graces Quarters Areas

The electrical distribution systems are predominately of original installation from 1986. Though some minor components require near-term replacement, the electrical distribution systems are generally in good condition.

J3.2.1.4 Inventory

The property being sold in this action will be as described in Table 2 of this utility specific attachment of the solicitation. The system will be sold in an “as is, where is” condition without any warranties, representations, or obligations on the part of the Government to make any alterations, repairs, or improvements. Any proposal that offers an alternative description of the property being sold may be deemed technically unacceptable.

Ancillary equipment attached to, and necessary for, operating the system, though not specifically mentioned herein, is considered part of the purchased utility.

When not specifically identified by system geographic information system (GIS) drawings and databases, the size and type of system components were estimated based on the size of the piping the component was connected to. Additionally, when the year of construction was not known, it was estimated based on the age of the piping or the age of the facility served.

TABLE 2

Fixed Inventory

Component Quantity Unit Average Year of Construction

Overhead 3 Phase - Open Wire Large 34 kV 57,869 LF 1974 3 Phase - Open Wire Small 34 kV 32,208 LF 1976 3 Phase - Open Wire Large 15 kV and smaller 82,474 LF 1973 3 Phase - Open Wire Small 15 kV and smaller 258,762 LF 1977 1 Phase - Open Wire 15 kV and smaller 38,755 LF 1974 Secondary 112,781 LF 1976 Gang Operated Air Break Switch 34 kV 27 Each 1976 Gang Operated Air Break Switch 15 kV and smaller 26 Each 1975 Underground 3 Phase - Large 15 kV and smaller 49,853 LF 1991 3 Phase - Small 15 kV and smaller 70,735 LF 1991 1 Phase - Direct Buried 15 kV and smaller 18,334 LF 1987 Secondary 1,637 LF 1988 Primary Sectionalizing Switches 35 Each 1996 Transformers – Pole Type 1 Phase - 15 kVA & smaller 276 Each 1976 1 Phase - 25 kVA 382 Each 1976

J3-14

1 Phase - 37.5 kVA 273 Each 1976 1 Phase - 50 kVA 291 Each 1976 1 Phase - 75 kVA 96 Each 1976 1 Phase - 100 kVA 116 Each 1976 1 Phase - 167 kVA 11 Each 1976 3 Phase - 112.5 kVA & Smaller 16 Each 1978 3 Phase - 150 kVA 2 Each 1976 3 Phase - 300 kVA 1 Each 1976 3 Phase - 500 kVA 1 Each 1976 3 Phase - 1000 kVA 1 Each 1976 Transformers – Pad Mount 1 Phase - 15 kVA & Smaller 44 Each 1987 1 Phase - 25 kVA 36 Each 1989 1 Phase - 37.5 kVA 31 Each 1987 1 Phase - 50…