SOW with Parts Attachment.pdf
PDF 128 KB Posted
- Attached to
- Masterclock Grandmaster GMR1000 Timing Units
- Solicitation number
- 116973
About this file
This is a Statement of Work for the procurement of timing equipment for the Utah Test and Training Range (UTTR) at Dugway Proving Ground (DPG). The government requires the acquisition of twelve (12) new Masterclock Grandmaster GMR1000 timing units with associated components to support high-speed camera operations and provide precise timing synchronization for instrumentation systems while maintaining compatibility with existing UTTR Masterclock timing infrastructure. Delivery must occur no later than September 18, 2026, to the UTTR/A4L facility at Hill Air Force Base, Utah. All items must be new, TAA compliant (where required), and shipped via traceable means with estimated delivery timeframes included in the quote.
The detailed equipment specification in Attachment A includes the primary GMR1000 multi-function grand master generator with NTP client/server capabilities (12 units), a GPS/GLONASS/Beidou/Galileo receiver module (12 units), a time code generator supporting multiple formats including IRIG and SMPTE (12 units), a 24 VDC North American power transformer (12 units), a window-mount GPS antenna (12 units), a 1U rack mount bracket (12 units), BNC-to-SMA adapters (12 units), and freight. Products manufactured by Masterclock include a 5-year limited parts and labor warranty. Contractor deliveries are restricted to Monday through Thursday, 7:00 A.M. to 4:00 P.M., with a minimum 24-hour advance notice requirement. Acceptance occurs upon inspection verifying correct quantities, manufacturers, model numbers, and documentation compliance. Invoices must clearly display the contract number and delivery date. Points of contact are the Logistics and Procurement Specialist (801-777-5393) or Supply Technician (801-777-2355).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Redacted Brand Name Justification.pdf | ||
| RFQ Combined Synopsis Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
MASTERCLOCK GMR1000 TIMING UNITS
15 JULY 2026
1. OBJECTIVE: The purpose of this procurement is to acquire twelve (12) Masterclock Grandmaster GMR1000 timing units to support high-speed camera operations for the Utah Test and Training Range (UTTR) on Dugway Proving Ground (DPG). The equipment will provide precise timing synchronization for instrumentation and high-speed camera systems while maintaining compatibility with the UTTR’s existing Masterclock timing units installed throughout the North and South UTTR.
2. SCOPE OF WORK: The Contractor shall furnish and deliver twelve (12) new TAA Compliant Masterclock Grandmaster GMR1000 timing units and components, outlined in Attachment A with standard manufacturer documentation, firmware, operating manuals, accessories, and warranty information required for complete operational capability.
3. WARRANTY REQUIREMENTS: Products designed and manufactured by Masterclock carry a 5-year limited parts and labor warranty. Third-party accessories carry the original manufacturer's warranty.
4. PERIOD OF PERFORMANCE: Delivery shall occur no later than 18 September 2026.
5. HOURS OF OPERATION: Contractor deliveries must be performed during normal duty hours, which are currently Monday through Thursday, 07:00 A.M. to 04:00 P.M., no Friday, Saturday, Sunday, or Federal Holidays will be accepted.
Deliveries shall be scheduled with personnel outlined in this SOW. A minimum of 24 hours’ notice is required prior to delivery.
6. DELIVERY INFORMATION: Delivery shall be made to: UTTR/A4L 5948 Southgate Ave, Bldg. 1A, Hill AFB, UT 84056.
7. INSPECTION AND ACCEPTANCE: The UTTR will inspect delivered equipment to verify that the correct quantities, manufacturer, model numbers, options, accessories, and documentation have been provided. Acceptance will occur upon confirmation that the equipment conforms to the requirements of this Statement of Work.
8. REPORTS: The contract number and delivery date must be clearly visible on each invoice.
9. UTTR POINTS OF CONTACT: Logistics and Procurement Specialist: 801-777-
5393 or Supply Technician: 801-777-2355.
CLIN#
Brand Name
Required
MFR P/N DESCRIPTION
TAA
Required
U/I QTY
1 N/A COC Include Certificate of Conformance and Test Reports N/A EA 12 2 N/A COO Include Country of Origin: United States of America, Saint Charles, Missouri 63301 N/A EA 12
3 Yes Masterclock GMR1000 Multi Function Grand Master Generator, NTP Client, NTP Server w/ offset, NENA Format 0 &1 in / output, NMEA 0183 input, TCXO Oscillator, 6 Digit Time / Date Display, SPST Dry Contact Relay, 9-28 VDC input.
Yes EA 12
4 Yes Masterclock GMR1000:-GMR-GNSS GPS, GLONASS, Beidou, Galileo Receiver, SMA Connector Constellation Software Configurable Yes EA 12
5 Yes Masterclock GMR1000:-GMR-TCG Time Code Generator (IRIG B, IRIG A, IRIG E, SMPTE 12M, 309M, 24/25/30 ND fps - 29.97 Drop Frame).
DB9 connector (Includes DB9FTBA DB9 Female to Terminal Block Breakout Adapter with BNC pigtail)
Yes EA 12
6 Yes Masterclock GMR1000:-POWER-DC-NA North American 24 VDC Wall Transformer with Locking Plug Yes EA 12
7 Yes Masterclock GPSANT-Window Indoor - Window Mount 26 dB gain, 3.3/5V preamplified GPS/GLONASS antenna, 16'/5m cable, SMA-M connector, magnetic mount. CE Approved Yes EA 12
8 Yes Masterclock RM4 1U rack mount bracket, 4 position w/ blank panels, black aluminum, 19 x 1.75 in (48.25 x 4.45cm) No EA 12 9 No BNC-SMA BNC-F to SMA-M Adapter Yes EA 12
10 N/A Freight EA 1
SOW ATTACHMENT A UTTR MASTERCLOCK
NOTES:
1. ALL ITEMS SHALL BE NEW
2. QUOTE SHALL INCLUDE ESTIMATED DELIVERY TIMEFRAMES
3. ALL ITEMS SHALL BE SHIPPED BY TRACEABLE MEANS
| SOW_UTTR Masterclock Timing Units.pdf |
| UTTR_SOW Attachment A.pdf |
| IGCE 1 |
File details come from the government source that posted it. Updated .