This is a Scope of Work (SOW) for a water tank integration and booster pump system installation project at the U.S. Mission in Pretoria, South Africa, prepared by the U.S. Department of State's Overseas Buildings Operations division.
The project involves connecting an existing water storage tank at 30 Gemsbok Street, Koedoespoort Industrial, Pretoria to the warehouse's internal water distribution system to ensure continuous water circulation, prevent stagnation, and provide backup supply during municipal outages. Key deliverables include: (1) water tank connection with inlet/outlet pipework and isolation ball valves; (2) supply and installation of a three-stage industrial water filtration system (sediment pre-filter, activated carbon filter, and fine polishing filter); (3) supply and installation of two DAB Esybox Max booster pumps on a DAB Esytwin platform allowing tandem or independent operation; (4) complete pipework and fittings appropriately sized for system flow and pressure; (5) bypass valve system enabling isolation of the backup system; and (6) system commissioning, pressure testing, and documentation. All work must comply with South African National Standards (SANS) including SANS 10252-1 (water supply installations), SANS 10086-1 (pumping systems), SANS 10142-1 (electrical installations), and applicable Tshwane Metropolitan Municipality regulations. The contractor must employ registered plumbers through the Institute of Plumbing South Africa, obtain necessary permits, maintain safety compliance per the Occupational Health and Safety Act 85 of 1993, submit a detailed site-specific safety plan for Post Occupational Safety & Health Officer review, and provide as-built drawings, pressure test certificates, commissioning reports, equipment warranties, and a compliance certificate upon completion. The project contact is Robert E Tshabalala (010 452 2188 / TshabalalaRE@state.gov), with alternate contact Zander Smuts (079 111 7150 / SmutsZ@state.gov).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U N C L A S S I F I E D
Scope of Work:
Water Tank Integration & Booster Pump System Installation
30 Gemsbok Street, Koedoespoort Industrial, Pretoria, Prepared by: Robert Tshabalala, Residential Maintenance Supervisor
U.S Mission South Africa, Pretoria, 100 Totius Street, Groenkloof, 0027
(+27) 012 452 2188 / (+27) 079 111 6868
Date: June 2026
U N C L A S S I F I E D P a g e 1
SCOPE OF WORK
Project: Water Tank Integration & Booster Pump System Installation
Location: 30 Gemsbok Street, Koedoespoort Industrial, Pretoria, 0186
Project Overview
The purpose of this project is to connect the existing water storage tank to the warehouse water distribution system. The installation will ensure water circulation throughout the building to prevent stagnation and water quality deterioration, and to provide a reliable water supply during municipal water outages.
1. Water Tank Connection
• Connect the existing water storage tank to the building's internal water distribution system.
• Install inlet and outlet pipework as required to integrate the tank into the system.
• Install a ball valve on the inlet pipe and a ball valve on the outlet pipe to allow isolation of the tank for maintenance purposes.
• Install a bypass valve arrangement to allow the backup water system to be isolated and bypassed without interrupting water supply to the building.
2. Three-Stage Industrial Water Filtration System
• Supply and install a three-stage industrial water filtration system, comprising:
o Stage 1: Sediment pre-filter (to remove suspended solids, sand, and particulates) o Stage 2: Activated carbon filter (to remove chlorine, odours, and organic compounds) o Stage 3: Fine filtration/polishing filter (to ensure water quality suitable for building use)
• All filter housings, fittings, and associated pipework to be supplied and installed by the contractor.
• Filter housings to be rated for the operating pressures of the system.
U N C L A S S I F I E D P a g e 2
3. Booster Pump System
• Supply and install two (2) DAB Esybox Max booster pumps mounted on the DAB
Esytwin platform.
• The Esytwin platform shall allow both pumps to operate in tandem or independently, providing redundancy and variable flow capacity.
• Electrical connections to the pump system to be carried out by a registered electrician in accordance with applicable standards.
• The contractor shall commission the pump system and confirm correct operation, pressure settings, and flow rates upon completion.
4. Pipework & Fittings
• Supply and install all pipework, fittings, connectors, and supports required to complete the installation.
• All pipework to be appropriately sized for the system's flow and pressure requirements.
• All joints and connections to be pressure-tested upon completion.
5. Bypass System
• Install a valve arrangement to enable the backup water system (tank and pumps) to be fully bypassed, allowing direct municipal supply to the building when the backup system is not required or is undergoing maintenance.
• Bypass valves to be clearly labeled for ease of operation.
6. Commissioning & Testing
• The contractor shall commission the complete system upon installation.
• Pressure testing of all pipework and connections shall be conducted and documented.
• The contractor shall demonstrate the operation of the system to the CO's representative, including normal operation, bypass mode, and filter maintenance procedures.
• A commissioning report shall be submitted to the client upon project completion.
U N C L A S S I F I E D P a g e 3
7. Applicable SANS Standards
The contractor shall carry out all work in accordance with the latest editions of the following
South African National Standards (SANS):
SANS Code Description
SANS
10252-1
Water supply installations for buildings – Part 1: Water supply installations for buildings
SANS
10254
The installation, maintenance, replacement and repair of fixed electric storage water heating systems
SANS
10400-P
National Building Regulations – Part P: Drainage
SANS
10400-W
National Building Regulations – Part W: Fire Protection (where applicable to water systems)
SANS 241-1 Drinking water – Part 1: Microbiological, physical, aesthetic, and chemical determinands
SANS 1200 Standardized Specification for Civil Engineering Construction (applicable sections for pipework and civil works)
SANS
10142-1
The wiring of premises – Part 1: Low-voltage installations (for electrical connections to pump system)
SANS
10086-1
The installation, maintenance and management of pumping systems
Note: The contractor is responsible for ensuring compliance with all applicable local municipal bylaws and regulations governing water installations in the Tshwane Metropolitan Municipality area.
U N C L A S S I F I E D P a g e 4
8. Contractor Responsibilities
• Supply all materials, equipment, tools, and labour required to complete the works.
• Ensure all work is carried out by suitably qualified and registered tradespeople (plumbers registered with the Institute of Plumbing South Africa (IPSA) or equivalent).
• Obtain all necessary permits and approvals prior to commencement of work.
• Ensure the work site is kept clean, safe, and compliant with applicable health and safety regulations under the Occupational Health and Safety Act (OHSA), Act 85 of 1993, and the Construction Regulations 2014.
• Remove all waste materials and debris from site upon completion.
• Provide the COR with all manufacturer warranties, manuals, and documentation for installed equipment.
9. Exclusions
Unless explicitly stated otherwise, the following are excluded from this scope of work:
• Structural or civil works beyond what is necessary for pipe supports and equipment mounting.
• Replacement or repair of the existing water storage tank.
• Municipal connection upgrades or works outside the property boundary.
• Ongoing maintenance of the installed system (unless a separate maintenance agreement is concluded).
10. Deliverables
Upon completion, the contractor shall provide:
1. As-built drawings of the installed system.
2. Pressure test certificates.
3. Commissioning report.
4. Equipment warranties and manuals.
5. Compliance certificate from a registered plumber.
U N C L A S S I F I E D P a g e 5
6. Warranty
The Contractor shall warrant all workmanship and materials for a period to be agreed upon in the contract.
11. Safety & Health
All contractors and subcontractors performing duties on behalf of the U.S. Government at U.S.
Government-held sites are required to do so safely and healthfully. This is in accordance with
South African law via the Occupational Health and Safety Act 85 of 1993 and American regulations via the U.S. Army Corps of Engineers’ EM 385-1-1: Safety and Occupational
Health Requirements (accessible at https://www.publications.usace.army.mil/USACE-
Publications/Engineer-Manuals/) and U.S. Mission South Africa’s Mission Policy P-070B-
24, Safety Requirements for Contractors & Subcontractors. The U.S. Embassy Pretoria Post
Occupational Safety & Health Officer (POSHO) must ensure strict compliance with current safety regulations as well as the overall health and safety of personnel, avoiding any damage or injury. The Contractor must accept all legal requirements and/or regulations currently enforced concerning safety for staff, technicians, other workers, and the public whom the work may directly or indirectly impact.
Contractors must submit a detailed, site-specific safety plan for POSHO review as part their tender documents, addressing hazard mitigation and control methods. The safety plan, which must always be accessible at the U.S. Government-held work site, must address the following requirements:
• General Safety
• Barricading and Warning Signs
• Personal Protective Equipment
• Safety Inspections
• Hand & Power Tool Safety
• Emergency Response
• High-Risk Work
• Electrical Safety
• Fall Protection
• Scaffolding
• Hazard Communication & Chemical Substances Safety
• Lifting Loads, Use of Cranes, or Elevating Work Platforms Safety
• Welding & Open Flame Operation Safety
• Confined Spaces Safety
The following items are generally included in the site-specific safety plan:
• Contractor appointment letter
• Agreement between Client and Contractor https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.publications.usace.army.mil%2FUSACE-Publications%2FEngineer-Manuals%2F&data=05%7C02%7CTshabalalaRE%40state.gov%7C07d2c12b12c34c79d03a08dd5bd0bb51%7C66cf50745afe48d1a691a12b2121f44b%7C0%7C0%7C638767674229541180%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=YgvgMBdsC1SKMGqUuyf2XXS9A%2BCakPwcTRBkjOhhsjc%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.publications.usace.army.mil%2FUSACE-Publications%2FEngineer-Manuals%2F&data=05%7C02%7CTshabalalaRE%40state.gov%7C07d2c12b12c34c79d03a08dd5bd0bb51%7C66cf50745afe48d1a691a12b2121f44b%7C0%7C0%7C638767674229541180%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=YgvgMBdsC1SKMGqUuyf2XXS9A%2BCakPwcTRBkjOhhsjc%3D&reserved=0
U N C L A S S I F I E D P a g e 6
• Notification of construction work (if applicable)
• Copy of the Occupational Health and Safety Act 85 of 1993
• Occupational Health and Safety Policy (company-specific)
• Occupational Health and Safety Management Plan (company-specific)
• Letter of Good Standing
• Material Safety Data Sheets (for all chemicals and hazardous materials, where applicable)
• Tax clearance certificate
• Risk assessments
• Safe work procedure (site-specific)
• Fall protection plan (site-specific, where applicable)
• Legal appointments (e.g., CEO, Risk Assessor, First Aider) [must include proof of training]
• Incident reporting procedures
• Emergency preparation documents
• First aid documents
• List of employees (site-specific) [must include proof of training and issued protective equipment, where applicable]
• Log of incident reports and accidents
Inquiries concerning contractor safety requirements at U.S. Government work sites can be directed to the U.S. Embassy Pretoria Safety Office at PretoriaPOSHO@state.gov.
12. Point Of Contact (Poc)
• Primary POC: Robert E Tshabalala
• Phone: 010 452 2188 / 079 111 6868
• Email: TshabalalaRE@state.gov
• Alternate POC: Zander Smuts
• Phone: 079 111 7150
• Email: SmutsZ@state.gov
This scope of work is subject to site inspection and may be revised following a joint site visit between the contractor and the CO's representative.
End of SOW_______________________________________________________ mailto:PretoriaPOSHO@state.gov mailto:SmutsZ@state.gov
File details come from the government source that posted it. Updated .