SOW-VP-55 packages Revision 1.docx

DOCX document 25 KB Posted

Attached to
Versa Pac Uranium Shipping Program
Solicitation number
3-B176-Q-00849-00
Issued by

About this file

This statement of work outlines technical support requirements for a uranium shipping program. Argonne National Laboratory seeks to lease Versa-Pac VP-55 or VP-110 packages for a one-time shipment of uranium to two predetermined locations within one year. The contractor must provide the packages equipped with certificates of compliance and testing information to support shipments from Argonne to recipient facilities. Additional requirements include mobilization and demobilization of packages to specified locations, any necessary repairs, and training and technical support. The contractor will retain ownership of the equipment and be responsible for repairs, while Argonne will handle on-site work. The related federal contract opportunity is a solicitation from the Department of Energy Office of Science seeking these uranium shipping services.

View the file

Other files

File Type Posted
Addendum and Acknowledgement Doc.doc DOC document
ANL-407C Quality Assurance Procurement Requirements - Pressure V.doc DOC document
Appendix A-71COM-13-FEB-2023.PDF PDF
On-Site Work (Low)-01-SEP-2023.PDF PDF
Reps and Certs ANL-70B.doc DOC document
ANL-70 Request for Quotation.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Argonne National Laboratory Statement of Work VP-55 packages shipping program and technical support.

Revision 1, 09/07/2023

Background Argonne National Laboratory is seeking Versa-Pac VP-55 or VP-110 packages to use for a one-time shipment of uranium to two pre-determined locations within a one year performance period.

Objective The contractor will perform the following:

· Participate in planning and project meetings to support the project activities with Argonne personnel.

· Interface with Argonne project technical staff during the review process

· Respond to questions during the review process and support resolution of the questions

· Provide verbal training for packages loading and closure

· Proctor mock-up and demonstration evolutions, as necessary (no hands-on work)

Deliverables

1. VP-55 or VP-110 packages in single or dual pipe container for lease

1. VP-55 or VP-110 packages equipped with a High Capacity Basket for lease

1. Packages Certificate of Compliance (CoC) and testing information, supporting shipments from the Argonne Site to receipt facilities

1. Mobilization and demobilization of the VP55 packages to the site specified by Argonne Alternatively, Argonne may select to pick up and return the packages to a location specified by the contractor

1. Any required repairs or decontamination work to packages due to Argonne’s shipping campaign

1. Provide training and technical support as needed

Requirements These packages shall comply with DOT RADIOACTIVE MATERIALS PACKAGE DESIGN CERTIFICATE USA/9342/AF-96, REVISION 6. The contractor will remain the full owner of the equipment through the entirety of the program, and provide the Laboratory with a clear price list for repairs or replacement if the packages are returned damaged.

The contractor will prepare and deliver VP-55 or VP-110 packages for use (CoC, annual inspections, etc.) and perform any repairs required after use by Argonne and/or subcontractors. The contractor will assist by verbal correspondence only with loading, closure of packages, and any other support as needed. Argonne will be responsible for all hands-on work.

All work performed at the Argonne Site is to be completed in accordance with Argonne’s QA Plan requirements (where applicable). All work performed on the VP containers will be performed under the contractor QA Program.

Schedule and required number and type of packages will be identified at the time of request.

The level of support will be determined based on Argonne need and with discussion with contractor. That includes the campaign duration and lead time.