SOW_Trail_and_Levee_Clearing_Marais_des_Cygnes_NWR.pdf
PDF 2 MB Posted
- Solicitation number
- 140FS226Q0177
About this file
This is a Statement of Objectives for trail and levee tree clearing services at Marais des Cygnes National Wildlife Refuge in Pleasanton, Kansas. The project encompasses vegetation trimming, mulching, and clearing along 20,675 feet of designated trail and access routes within the refuge, with work performed according to treatment types shown on the project map.
The scope of work includes two primary treatment categories: Canopy Trimming (Orange and Yellow line treatments) requiring trimming trees and woody vegetation from ground level to a minimum height of 20 feet above the path, mulching branches and brush up to 25 feet from the center path while protecting designated keep trees, and ensuring all mulched vegetation does not exceed 3 inches in diameter and 18 inches in length; and Total Clearing (Red line treatment) requiring removal and mulching of all vegetation and trees within a 30-foot corridor on each side of the path, with stumps ground below grade or cut flush with the ground. Ground protection requirements mandate avoidance of rutting, soil displacement, puddling, and erosion, with work pausing immediately when conditions become too wet for safe operation. Safety requirements include adherence to safe operating procedures for chainsaws and mulchers, mandatory personal protective equipment (helmets, gloves, eye and ear protection, high-visibility garments, and cut-resistant leg protection), daily tailgate safety briefings, and fire season precautions such as equipment spark arrestors, fire extinguishers on all equipment, and prohibition of operations during red-flag warnings. Environmental requirements include preservation of keep trees, avoidance of wetland and sensitive area damage, prevention of debris entering waterways, and equipment cleaning to prevent invasive species spread. The contractor is provided a 6-month performance window to accommodate weather delays, deer hunting season restrictions, fire season shutdowns, and other operational limitations determined by the refuge manager. Deliverables include daily or weekly work progress reports upon request, before and after photos for each treated segment, verification of corridor widths and vertical clearance compliance, and final inspection with the refuge manager. The refuge headquarters contact is 24141 Kansas Hwy 52, Pleasanton, Kansas 66075, with office phone 913-352-8956 and office hours 8am–4:30pm.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Trail and Levee Tree Clearing Marais des Cygnes National Wildlife Refuge
1. Project Overview This project includes vegetation trimming, mulching, and clearing along 20,675 feet of designated trail and access routes within Marais des Cygnes National Wildlife Refuge. All work shall be performed in accordance with the treatment types delineated on the project map.
2. Location Marais des Cygnes National Wildlife Refuge Headquarters 24141 Kansas Hwy 52 Pleasanton, Kansas 66075 Office Phone: 913-352-8956 Office Hours 8am – 4:30pm
3. Scope of Work
3.1 Canopy Trimming (Orange and Yellow Line Treatment Categories)
• Trimming trees and woody vegetation from ground level up to a minimum height of 20 feet above the path of travel.
• Mulching or grinding all branches, brush, and woody vegetation from the traveled path up to 25 feet from the center of the path, while protecting designated keep trees.
• Keep trees will be identified and marked by refuge staff prior to work.
• Protecting all good hardwood and designated keep trees; avoiding bark damage, root disturbance, and mechanical injury.
• Ensuring all mulched vegetation or grindings do not exceed 3 inches in diameter and 18 inches in length.
3.2 Total Clearing (Red Line Treatment Category)
• Removing and mulching all vegetation and all trees within the designated corridor.
• Clearing width of 30 feet from the path of travel on each side.
• Grinding stumps below grade or cutting them flush with the ground to eliminate tripping and catching hazards.
• Ensuring mulch and grindings are no larger than 3 inches in diameter and 18 inches in length.
3.3 Ground Protection Requirements
• Contractor must avoid rutting, soil displacement, puddling, and erosion, especially in wet or soft areas.
• Work shall pause immediately when the refuge manager determines conditions are too wet for safe operation.
4. Safety Requirements
4.1 General Safety
• Contractor shall follow safe operating procedures for chainsaws, mulchers, chippers, and heavy equipment.
• Required PPE includes helmets, gloves, eye and ear protection, high‑visibility garments, and cut‑resistant leg protection.
• Daily tailgate safety briefings shall be conducted.
4.2 Fire Season Safety Precautions
Should fire risk conditions arise (drought, wind, low humidity):
• Equipment must have spark arrestors, and operators must inspect for fire risks daily.
• Contractors shall maintain fire extinguishers, water packs, and suppression tools on all equipment.
• No mulching, grinding, or chainsaw use during red‑flag warnings or when directed by the refuge manager.
• Contractor shall conduct end‑of‑day fire watch during high‑risk periods to confirm no smoldering debris or ignition hazards.
• Contractor must comply with all temporary fire‑related shutdowns by the refuge or state/local authorities.
5. Environmental Requirements
• Preserve keep trees and avoid damage to wetlands and sensitive areas.
• Keep debris out of streams, drains, and low‑lying areas.
• Clean equipment before entering/exiting the work site to prevent spread of invasive plant species.
6. Work Schedule & Duration A 6 month performance window is established to accommodate:
• Weather delays
• Deer hunting season access restrictions
• Fire season‑related shutdowns
• Other operational or environmental limitations determined by the refuge manager.
Contractor shall coordinate access, closures, and work sequencing with the refuge manager.
7. Deliverables
• Daily or weekly work progress reports upon request
• Before and after photos for each treated segment
• Verification of corridor widths and vertical clearance compliance
• Final inspection with the refuge manager
Pleasanton City Lake
E 1200 Rd
E 1100 Rd
V e rn o n R d
W a tt le s R d
Marais Des Cygnes National Wildlife Refuge
5 61
1 2
1984 2680
U.S. Fish and Wildlife Service, National Wildlife Refuge System, Division of Realty, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c) OpenStreetMap contributors, and the GIS User Community, Esri, USDA FSA
Marais des Cygnes NWR Trail Clearing Project - Phase 1
Treatment Two Side Canopy Clearing
Two Side Total Clearing
One Side Canopy Clearing
0 0.5 1 1.50.25 Miles