SOW to Paint Galvanized ASR Tower.pdf

PDF 71 KB Posted

Attached to
Paint Galvanized ASR Tower Ft. Wayne IN Federal contract opportunity
Solicitation number
6973GH-23-Q-00170
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This statement of work outlines requirements for painting a galvanized air traffic control tower located at Fort Wayne International Airport. The contractor will prepare all steel surfaces for painting in accordance with Society for Protective Coatings standards and manufacturer specifications. Work includes painting the existing galvanized tower to manufacturer standards. The contractor must coordinate all work with the Federal Aviation Administration contracting officer's representative and provide temporary facilities for employees. The statement of work also specifies requirements for materials storage, site access, waste management, repairs, pre-bid site visits, and attendance at a pre-construction conference. The related federal contract opportunity is issued by the Department of Transportation Federal Aviation Administration Franchise Acquisition Services for painting the galvanized air traffic control tower at Fort Wayne International Airport under solicitation number 6973GH-23-Q-00170.

View the file

Other files for this federal contract opportunity

Other files attached to Paint Galvanized ASR Tower Ft. Wayne IN, newest first.
File Type Posted
Drawings FWA ASR DT 7155 Roman Signed by Herb on 051622.pdf PDF
Wage Determination IN20230002 6 JUN 23.pdf PDF
SAM SIR 6973GH-23-Q-00170 Ft Wayne IN (1).pdf PDF
Tower Pics Paint Galvanized ASR Tower J.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1A.1 GENERAL: Provide all necessary materials, labor, equipment, tools and supervision to paint the galvanized ASR tower at the Fort Wayne International Airport, Fort Wayne, IN, in accordance with the requirements delineated herein, and the related drawings.

1A.2 SCOPE OF WORK: The work consists of, but is not limited to, the following principal items:

A. Prepare all structural steel surfaces to receive paint in accordance with the appropriate Society of Protective Coatings (SSPC) cleaning classifications, and the paint manufacturer’s specifications and recommendations.

B. Paint the existing galvanized steel ASR tower in accordance with the paint manufacturer’s specifications and recommendations.

1A.3 COORDINATION: All coordination between the Contractor and the FAA shall be through the project Contracting

Officer’s Representative (COR).

1A.4 TEMPORARY FACILITIES: The Contractor shall furnish all temporary facilities as required such as electricity, water, and air.

1A.5 SANITARY FACILITIES: Sanitary facilities are not available at the site. The Contractor shall provide temporary toilet facilities as required for his workmen. Temporary toilet facilities shall be of the type approved by the local governing body. The location shall be as directed by the COR.

1A.6 MATERIALS: The Contractor shall furnish all materials, equipment, and labor to complete the job, unless otherwise specified.

1A.7 MATERIAL STORAGE: The Contractor shall store all materials in a manner to protect them from all elements of the weather and other incidental damage.

Materials shall be stored as directed by the COR.

1A.8 INGRESS AND EGRESS TO WORK AREAS: Ingress and egress to the work areas shall be as directed by the COR.

Security passes may be required of all workmen.

Information on how to obtain these passes will be available at the pre-construction conference.

The Contractor shall keep all vehicles, working equipment and materials where directed by the COR.

1A.9 CLEANING:

A. Working Area: The Contractor shall keep the working area in a clean and proper condition.

All rubbish and waste resulting from the execution of the work shall be removed at the end of each day or stored as directed by the

COR.

B. Waste Packing Material: Immediately after unpacking, all packing material, case lumber, excelsior, or other rubbish, flammable or otherwise, shall be removed from the premises.

C. Final Clean-Up: Upon completion of work, and before final inspection, the Contractor shall remove his working tools, equipment, debris, rubbish, and unused materials from the site.

D. Disposal: Disposal of rubbish, and debris will be off the site at Contractor's expense or as directed by the COR.

1A.10 SUBMISSION OF WASTE MANAGEMENT PLAN: The Contractor shall submit a waste management plan in accordance with the FAA’s Construction Waste Management Contract Clause.

1A.11 CONTRACTOR’S LIABILITY: Damage to existing facilities and equipment caused by the Contractor shall be reported to the COR without delay. The

Contractor will be responsible for repairing, or having repaired, all damaged areas or equipment at the Contractor’s expense. All repairs shall be accomplished to the satisfaction of the COR. The

Contractor shall keep all his working personnel within the work area or in approved access routes.

1A.12 SITE VISIT: The Contractor shall visit the work site prior to bidding the job to verify all dimensions and quantities of materials as specified and to obtain first-hand knowledge of existing conditions. Contractors can contact the

SSC Manager at 260-479-6524 to arrange for a site visit. No subsequent extras will be allowed due to any claim of lack of knowledge for conditions which can be determined by examining the site. Once the

Contractor is chosen to do the job, additional claims for materials, equipment, and labor for represented scope of work areas will not be allowed, unless the

FAA has a need for additional work to be accomplished.

1A.13 PRE-CONSTRUCTION CONFERENCE: The Contractor shall attend a pre-construction conference prior to starting work at a location agreed upon between the Contractor and the Contracting Officer.