SOW - SF Vault Toilets.pdf

PDF 162 KB Posted

Attached to
GAOA Vault Toilet Replacement - Santa Fe National Forest
Solicitation number
127EAX25R0022
Issued by

About this file

This Statement of Work (SOW) details vault toilet replacement projects for three campgrounds in the Santa Fe National Forest's Pecos/Las Vegas Ranger District, located north of Pecos, New Mexico. The project involves demolition and replacement of existing toilet facilities across three sites: Field Tract Campground (removing a 288 sq. ft. concrete block flush toilet building and installing one double-vault pre-cast concrete toilet with a gravel pathway), Link's Tract Campground (demolishing a single-vault toilet and installing a double-vault pre-cast concrete toilet with gravel pathways), and Jack's Creek Campground (demolishing four composting toilets and two double-vault toilet buildings, and installing six double-vault pre-cast concrete toilets with concrete sidewalks).

The contract has a 180-day performance period, with estimated work timeframe from May 1, 2025, to October 31, 2025. The specific campground locations are precisely identified by GPS coordinates: Field Tract Campground (35.6871, -105.6937), Links Tract Campground (35.7569, -105.6624), and Jack's Creek Campground (35.8391, -105.6560). Referenced attachments include specifications, drawings, and additional documents such as the 1996 Jacks Creek Contract Package Drawings, Field Tract Restroom Photo & Floor Plan, and Links Tract Toilet Photo.

View the file

Other files

File Type Posted
GAOA - Santa Fe Vault Toiltet Replacement PLVRD.pdf PDF
SOI - SF Vault Toilets.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Santa Fe Vault Toilet

Replacements 2023

FY23 TASK ORDER INFORMATION

Dated October 24, 2023

BRIEF DESCRIPTION OF PROJECT:

This project consists of the following:

Field Tract Campground: The work consists of demolition of one 288 sq. ft. concrete block flush toilet building (including the concrete foundation) and installation of one double-vault pre-cast concrete toilet. It also includes installing a gravel pathway from the road to the toilet.

Link’s Tract Campground: The work consists of demolition of one single-vault toilet building and installation of one double-vault pre-cast concrete toilet. It also includes gravel pathways around the new toilet.

Jack’s Creek Campground: The work consists of demolition of four composting toilets and two double-vault toilet buildings and installation of six double-vault pre-cast concrete toilets. The work also includes construction of concrete sidewalks leading to and around the toilets.

Location:

The site locations are on the Pecos/Las Vegas Ranger District of the Santa Fe National Forest and include three separate campgrounds. All the campgrounds are north of Pecos, New Mexico off

NM-63. The campgrounds are listed below:

1. Field Tract Campground: 35.6871, -105.6937

2. Links Tract Campground: 35.7569, -105.6624

3. Jack’s Creek Campground: 35.8391, -105.6560

Period of Performance:

Contract time begins on the effective date of the Notice to Proceed (NTP) and runs 180 days.

Estimated time of work is May 1, 2025, to October 31, 2025.

References:

• Specifications

• Drawings

• Referenced Attachments o Ref 1 - 1996 Jacks Creek Contract Package Drawings o Ref 2 - Field Tract Restroom Photo & Floor Plan o Ref 3 - Links Tract Toilet Photo