SOI - SF Vault Toilets.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
GAOA Vault Toilet Replacement - Santa Fe National Forest
Solicitation number
127EAX25R0022
Issued by

About this file

This Schedule of Items (SOI) details vault toilet replacement work for the USDA Forest Service in Santa Fe National Forest under the Great American Outdoors Act (GAOA). The project encompasses three campground locations - Jacks Creek, Links Tract, and Field Tract - with a total project scope involving demolition of existing toilet facilities and installation of new precast concrete double-vault toilets. Specific work includes pumping out existing tanks, demolishing existing structures (ranging from 80 to 635 square feet), backfilling foundations, installing new toilets, constructing sidewalks and gravel pathways, and removing/reinstalling trash bins. The project requires six double-vault toilets at Jacks Creek Campground, one double-vault toilet at Links Tract Campground, and one double-vault toilet at Field Tract Campground, with additional site preparation and infrastructure work at each location. Mobilization is included as a line item for each campground, and the project involves specialized tasks such as asbestos abatement at the Field Tract site.

View the file

Other files

File Type Posted
SOW - SF Vault Toilets.pdf PDF
GAOA - Santa Fe Vault Toiltet Replacement PLVRD.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI

USDA Forest Service - Santa Fe National Forest
GAOA - Santa Fe Vault Toilet Replacements
Schedule of Items
Jacks Creek Campground
Item No.DescriptionUnitQtyMethod of MeasurementUnit PriceAmount
1Pump Solids and Liquids out of 4 Compost Tanks & 4 Vaults. Estimated Quantity: 9,000 gallonsLS1DQ
2Toilet 1 (Single Dual Compost) DemolitionSF350DQ
3Toilet 2 (Single Dual Compost) DemolitionSF350DQ
4Toilet 3 (Single Dual Compost) DemolitionSF350DQ
5Toilet 4 (Double Dual Compost) DemolitionSF635DQ
6Toilet 5 (Vault) DemolitionSF350DQ
7Toilet 6 (Vault) DemolitionSF350DQ
11Backfill for 4 Compost Toilet BasementsTons153DQ
13Precast Concrete Double Vault Toilets Delivery/InstallEach6DQ
16Sidewalks and Trash Bin PadsSF3,077DQ
17Trash Bin Removal & Reinstallation (6 sites, 2 bins per site)Each12DQ
19MobilizationLS1DQ
JACKS CREEK SUBTOTALSubtotal
Links Tract Campground
Item No.DescriptionUnitQtyMethod of MeasurementUnit PriceAmount
1Pump Solids and Liquids out of 1 Vault.
Estimated Quantity: 750 gallonsLS1DQ
8Single Vault Toilet DemolitionSF80DQ
11Backfill for Vault ToiletTons7DQ
14Precast Concrete Double Vault Toilets Delivery/InstallEach1DQ
18Gravel PathwaysSF230DQ
19MobilizationLS1DQ
LINKS TRACT SUBTOTALSubtotal
Field Tract Campground
Item No.DescriptionUnitQtyMethod of MeasurementUnit PriceAmount
1Pump Solids and Liquids out of 1 Septic Tank.
Estimated Quantity: 2000 gallonsLS1DQ
9Flush Toilet DemolitionSF288DQ
10Asbestos AbatementLS1DQ
11Backfill for Septic TankTons7DQ
12Septic Tank DecommissionEach1DQ
15Precast Concrete Double Vault Toilets Delivery/InstallEach1DQ
18Gravel PathwaysSF770DQ
19MobilizationLS1DQ
FIELD TRACT SUBTOTALSubtotal