This Schedule of Items (SOI) details vault toilet replacement work for the USDA Forest Service in Santa Fe National Forest under the Great American Outdoors Act (GAOA). The project encompasses three campground locations - Jacks Creek, Links Tract, and Field Tract - with a total project scope involving demolition of existing toilet facilities and installation of new precast concrete double-vault toilets. Specific work includes pumping out existing tanks, demolishing existing structures (ranging from 80 to 635 square feet), backfilling foundations, installing new toilets, constructing sidewalks and gravel pathways, and removing/reinstalling trash bins. The project requires six double-vault toilets at Jacks Creek Campground, one double-vault toilet at Links Tract Campground, and one double-vault toilet at Field Tract Campground, with additional site preparation and infrastructure work at each location. Mobilization is included as a line item for each campground, and the project involves specialized tasks such as asbestos abatement at the Field Tract site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW - SF Vault Toilets.pdf | ||
| GAOA - Santa Fe Vault Toiltet Replacement PLVRD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
| USDA Forest Service - Santa Fe National Forest |
| GAOA - Santa Fe Vault Toilet Replacements |
| Schedule of Items |
| Jacks Creek Campground | ||||||
| Item No. | Description | Unit | Qty | Method of Measurement | Unit Price | Amount |
| 1 | Pump Solids and Liquids out of 4 Compost Tanks & 4 Vaults. Estimated Quantity: 9,000 gallons | LS | 1 | DQ | ||
| 2 | Toilet 1 (Single Dual Compost) Demolition | SF | 350 | DQ | ||
| 3 | Toilet 2 (Single Dual Compost) Demolition | SF | 350 | DQ | ||
| 4 | Toilet 3 (Single Dual Compost) Demolition | SF | 350 | DQ | ||
| 5 | Toilet 4 (Double Dual Compost) Demolition | SF | 635 | DQ | ||
| 6 | Toilet 5 (Vault) Demolition | SF | 350 | DQ | ||
| 7 | Toilet 6 (Vault) Demolition | SF | 350 | DQ | ||
| 11 | Backfill for 4 Compost Toilet Basements | Tons | 153 | DQ | ||
| 13 | Precast Concrete Double Vault Toilets Delivery/Install | Each | 6 | DQ | ||
| 16 | Sidewalks and Trash Bin Pads | SF | 3,077 | DQ | ||
| 17 | Trash Bin Removal & Reinstallation (6 sites, 2 bins per site) | Each | 12 | DQ | ||
| 19 | Mobilization | LS | 1 | DQ | ||
| JACKS CREEK SUBTOTAL | Subtotal |
| Links Tract Campground | ||||||||
| Item No. | Description | Unit | Qty | Method of Measurement | Unit Price | Amount | ||
| 1 | Pump Solids and Liquids out of 1 Vault. | |||||||
| Estimated Quantity: 750 gallons | LS | 1 | DQ | |||||
| 8 | Single Vault Toilet Demolition | SF | 80 | DQ | ||||
| 11 | Backfill for Vault Toilet | Tons | 7 | DQ | ||||
| 14 | Precast Concrete Double Vault Toilets Delivery/Install | Each | 1 | DQ | ||||
| 18 | Gravel Pathways | SF | 230 | DQ | ||||
| 19 | Mobilization | LS | 1 | DQ | ||||
| LINKS TRACT SUBTOTAL | Subtotal |
| Field Tract Campground | ||||||||
| Item No. | Description | Unit | Qty | Method of Measurement | Unit Price | Amount | ||
| 1 | Pump Solids and Liquids out of 1 Septic Tank. | |||||||
| Estimated Quantity: 2000 gallons | LS | 1 | DQ | |||||
| 9 | Flush Toilet Demolition | SF | 288 | DQ | ||||
| 10 | Asbestos Abatement | LS | 1 | DQ | ||||
| 11 | Backfill for Septic Tank | Tons | 7 | DQ | ||||
| 12 | Septic Tank Decommission | Each | 1 | DQ | ||||
| 15 | Precast Concrete Double Vault Toilets Delivery/Install | Each | 1 | DQ | ||||
| 18 | Gravel Pathways | SF | 770 | DQ | ||||
| 19 | Mobilization | LS | 1 | DQ | ||||
| FIELD TRACT SUBTOTAL | Subtotal |