This statement of work outlines requirements for a security camera system replacement project at a National Technology and Development Program facility in Missoula, Montana. The scope of work includes removal of the existing 23-year old analog CCTV system and installation of a new IP-based CCTV surveillance system with high-resolution cameras and low-light capabilities. The contractor must provide all equipment, cabling, software, testing and commissioning. Deliverables are due within 60 days of award and include training no later than 10 business days after replacement. The contractor shall have installation and software technicians on site. Access to the controlled facility will require coordination. No travel outside of Missoula is required. The related federal contract opportunity is issued by the U.S. Department of Agriculture Forest Service for solicitation 12318723Q0477 for a security camera system installation.

View the file

Other files for this federal contract opportunity

Other files attached to Security Camera System w/Installation, newest first.
File Type Posted
Contractor Q and As-Security System Upgrade.pdf PDF
Appendix A-Security System Upgrade.pdf PDF
RFQ-12318723Q0477-Security System Upgrade.pdf PDF
Solicitation-12318723Q0477-Security System Upgrade.pdf PDF
Schedule of Items-Security System Upgrade.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards

Project NTDP Security System

General Information

1.0 Scope of Work

This project is for the supply, install, test, and commission of a high-quality IP-CCTV surveillance system and corresponding software for the National Technology and Development Program – Missoula building. The entire system shall conform to the technical specifications (or suitable substitutes approved by CO/COR) found in Appendix A. Training for USFS employees shall be provided after replacement is complete and testing/commissioning have occurred. Any applicable Operation and Maintenance documentation for new equipment shall be provided prior to contract completion. All installations must be in compliance with all applicable codes.

2.0 Background

There is a need to replace the existing CCTV system at the Missoula NTDP building. The existing system is an analog-type system installed approximately 23 years ago. Recently a neighboring FS compound had multiple vehicles and one facility broken into. One of the cameras at NTDP captured the perpetrators but the age of the equipment and the low resolution meant that FS Law Enforcement Officers said deemed it unusable. FS Law Enforcement also requested that any new system be usable in low illumination environments as well as have “smart bookmarking” capabilities to assist in reviewing footage. The NTDP compound contains many high-value items as well occasional sensitive materials located within the facility and the attached gated yard.

Contractor Requirements

3.0 Technical Requirements / Tasks

Tasks

• Removal of old CCTV surveillance system and installation of new system

• Integrated testing and commissioning of CCTV system

• Training on new equipment

Cleanliness and Workmanship

Project site shall be cleaned up prior to the end of each day and maintained in a neat and orderly manner. All excess materials, debris, and rubbish become the property of the Contractor and shall be removed daily unless otherwise approved by the Contracting Officer (CO).

CO and Contracting Officers Representative (COR) shall be sole judge of workmen-like manner and workmanship.

CO and COR shall use industry standards as basis for judgment of workmanship.

Field Verification Contractor shall field verify all existing conditions affecting the work of this contract prior to bid, ordering products and/or starting work.

Site Visit A site visit is highly advisable.

4.0 Government Furnished

On-site Facilities: Electricity, water, and sanitary facilities are available at the sites at no cost to the contractor.

Performance Period: Work will be completed Monday-Friday between 8:00 am and 5:00 pm unless otherwise approved by CO.

5.0 Deliverables / Schedule

Schedule: Prior to starting work, submit the following items:

• Schedule showing anticipated start and completion dates for work items.

• Installation drawing

• Power distribution scheme

• Specifications and data sheet for each item

• List of software and software licenses

Prior to closing contract, submit the following items:

• Test certificates, internal test reports, etc.

Please coordinate specifics with COR a minimum of 10 workdays prior to anticipate start date. Deliverables are below:

Key Deliverables

Item No. Deliverable Objective Due 1 Surveillance System

Replacement Removal of old CCTV surveillance system and installation of new system

No later than sixty (60) days after contract award

2 Testing and Commissioning

Integrated testing and commissioning of CCTV system

No later than ten (10) business days after system replacement

3 Training Training to NTDP staff on new system including any Applicable Warranty Information

No later than ten (10) business days after system replacement

6.0 Travel

No travel requirements outside of travel to site: 5785 Hwy 10 West, Missoula, MT 59808

7.0 Contractor’s Key Personnel

Installation Technician Software/Controller Technician

8.0 Security Requirements

NTDP is a controlled facility so coordination with COR necessary for access.

9.0 Data Rights

N/A

10.0 Section 508 – Electronic and Information Technology Standards N/A – System must be a closed system and only accessible internally from the building. It must not connect to the FS network or be accessible via remote means.

Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards