This is a Statement of Work (SOW) for U.S. Coast Guard Sector Delaware Bay heads and shower renovation, PR #37050PR260000043.

The contractor shall remove 15 existing shower stalls and install 15 new showers in their entirety at the U.S. Coast Guard Sector Delaware Bay facility located at 1 Washington Ave, Philadelphia, PA 19147. Installation requirements include Proflo (or equivalent) fiberglass shower pans, waterproofed cement board, white subway tile with grout, spackle and paint as needed, new Moen (or equivalent) diverter valves with chrome trim, and one handheld faucet shower head per shower. The contractor must furnish all personnel, equipment, tools, transportation, supervision, and services necessary to complete the work. Work hours are 8:00 am to 3:00 pm EST, Monday through Friday, excluding federal holidays. The period of performance is to be determined.

The contractor must provide a designated Project Manager as the single point of contact who is fluent in English and available to respond to the Contracting Officer's Representative (COR) via telephone within 24 hours of notification. All contractor employees must wear identification badges displaying the contractor name, comply with government facility regulations regarding safety, security, sanitation, and conduct, and present a professional appearance at all times. The contractor is responsible for providing replacement personnel for absences or notifying the COR in advance. The government will not furnish resources; the contractor must provide all facilities, materials, and equipment. The COR will review deliverables and notify the contractor of acceptance or provide documented reasons for non-acceptance and opportunity for correction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR #: 37050PR260000043

STATEMENT OF WORK

PAGE 1/3

STATEMENT OF WORK (SOW)

FOR

U.S. COAST GUARD SECTOR DELAWARE BAY HEADS AND SHOWER

RENOVATION

1.0 GENERAL

1.1 SCOPE

The contractor shall provide all personnel, equipment, tools, transportation, supervision and other items and services necessary to replace 15 showers in their entirety. Any questions regarding this Statement of Work (SOW) must be directed to the Contracting Officer assigned to this contract.

2.0 SPECIFIC REQUIREMENTS/TASKS

• Remove 15 shower stalls

• Install 15 new showers to include:

- Install Proflo (or equivalent) fiberglass shower pans

- Install & waterproof new cement board in shower

- Install white subway tile and grout.

- Spackle and paint were where needed.

- Install new Moen (or equivalent) diverter valves and Chrome trim.

- Include (1) handheld faucet shower head.

3.0 CONTRACTOR PERSONNEL

The contractor must not employ persons for work on this contract if such employee is considered by the contracting officer to be a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

3.1 QUALIFIED PERSONNEL

The Contractor must provide qualified personnel to perform all requirements specified in this

SOW.

3.2 CONTINUITY OF SUPPORT

The Contractor must ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor must ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor must provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor must provide a fully qualified replacement.

PAGE 2/3

STATEMENT OF WORK

3.3 PROJECT MANAGER

The Contractor must provide a Project Manager who must be responsible for all Contractor work performed under this SOW. The Project Manager must be a single point of contact for the Contracting Officer and the COR. The name of the Project Manager, and the name(s) of any alternate(s) who must act for the Contractor in the absence of the Project Manager, must be provided to the Government as part of the Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate must have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates must be able to read, write, speak and understand English. Additionally, the Contractor must not replace the Project Manager without prior approval from the Contracting Officer.

3.3.1 The Project Manager must be available to the COR via telephone and must respond to a request for discussion or resolution of technical problems within 24 hours of notification.

3.4 EMPLOYEE IDENTIFICATION

3.4.1 Contractor employees visiting Government facilities must wear an identification badge that, at a minimum, displays the Contractor name. Visiting Contractor employees must comply with all Government escort rules and requirements. All Contractor employees must identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.

3.5 EMPLOYEE CONDUCT

Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

3.6 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons.

Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

4.0 PERIOD OF PERFORMANCE

The period of performance for this contract is to be determined.

4.1 PLACE OF PERFORMANCE

United States Coast Guard Sector Delaware Bay 1 Washington Ave Philadelphia, PA 19147

PAGE 3/3

STATEMENT OF WORK

4.2 HOURS OF OPERATION

Contractor employees must generally perform all work beginning at 8:00 am and ceasing work daily at 3:00 pm EST, Monday through Friday (except Federal holidays) .

4.3 PROTECTION OF INFORMATION

Contractor access to information protected under the Privacy Act is required under this SOW.

Contractor employees must safeguard this information against unauthorized disclosure or dissemination in accordance with the law and Government policy and regulation.

Contractor access to proprietary information is required under this SOW. Contractor employees must safeguard this information against unauthorized disclosure or dissemination in accordance with the law and Government policy and regulation.

Contractor access to proprietary information is required under this SOW. Contractor employees must safeguard this information against unauthorized disclosure or dissemination in accordance with DHS MD 11042.1, Safeguarding Sensitive But Unclassified (For Official Use Only) Information. The Contractor must ensure that all Contractor personnel having access to business or procurement sensitive information sign a non-disclosure agreement (DHS Form 11000-6).

5.0 GOVERNMENT FURNISHED RESOURCES

The Government will not furnish any resources to the Contractor in support of this contract.

6.0 CONTRACTOR FURNISHED PROPERTY

The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract.

7.0 GOVERNMENT ACCEPTANCE PERIOD

The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.