SDB SOW Shower renovaton_revised.pdf
PDF 743 KB Posted
- Attached to
- USCG Sector Delaware Bay Shower Replacement
- Solicitation number
- 70Z027-26-R-00008
About this file
This is a Statement of Work (SOW) for shower renovation services at the U.S. Coast Guard Sector Delaware Bay in Philadelphia, PA. The project involves the complete replacement of fifteen existing shower stalls that have exceeded their service life and are experiencing persistent leaks, water damage, and potential mold growth.
The contractor shall provide all labor, materials, and equipment for demolition and installation across four primary tasks: (1) demolition and site preparation including removal of existing tile, backer board, shower pans, and plumbing fixtures down to supply lines; (2) installation of new shower systems with Moen equivalent diverter valves with chrome trim, Proflo equivalent fiberglass shower pans, cementitious backer board, liquid-applied waterproofing membrane, white subway tile, and handheld showerheads with hoses; (3) site cleanup and final inspection including leak testing of all connections before and after installation; and (4) provision of a one-year warranty on all labor and materials. The contractor must field-verify all measurements, obtain QAE approval for all material submittals before purchase, coordinate water shutoff procedures, perform work in accordance with federal, state, and local codes, and repair any contractor-caused damage at no additional cost. The period of performance shall not exceed 90 calendar days from the Notice to Proceed, with work conducted between 0730 and 1500 Eastern Standard Time, Monday-Friday, excluding federal holidays. Key deliverables include a Final Project & Safety Plan, Material Specification Sheets, weekly progress reports, demolition and installation milestone checks, final walkthrough and inspection, and warranty documentation. The Contracting Officer's Representative is SKCS Sergio Cosby, and the QA Evaluator Representative is EM1 Raymond Crowley. Contractor employees must comply with DHS security requirements, obtain visitor badges with 72-hour advance notice, and present Real ID or Passport for facility access.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR #: 37050PR260000043
STATEMENT OF WORK
LAST UPDATED: 24/AUG/2026 PAGE 1/9
Shower Renovations, USCG Sector Delaware Bay
1.0 GENERAL
• 1.1 Background
At U.S. Coast Guard Sector Delaware Bay, the fifteen (15) existing shower stalls have surpassed their service life. The current installations are dated, and several units exhibit persistent leaks from failing plumbing fixtures and pans, causing water damage to the rooms below. This project is necessary to prevent further structural damage, address potential mold growth, and modernize the amenities for personnel. The primary objective is to complete full replacement of all fifteen shower stalls.
• 1.2 Scope
The contractor shall provide all labor, materials, and equipment for the demolition of existing shower stalls and installation of new systems. This includes demolition of existing tile, backer board, and shower pans, as well as removal of existing plumbing down to the supply lines. The contractor is responsible for field-verifying all measurements list on page 7 & 8.
• 1.3 Site Conditions and Abatement
Existing walls are assumed to be standard wood/metal framing with drywall/backer board. The contractor is responsible for identifying any unforeseen conditions upon demolition. If materials suspected of containing asbestos or mold are discovered, the contractor shall immediately cease work in the affected area and notify the QAE. Any necessary abatement shall be handled as a separate modification to this contract.
• 1.4 Materials
LAST UPDATED: 24/AUG/2026 PAGE 2/9
Material submittals shall include manufacturer’s product data model number, finish, dimensions, installation instructions, warranty information, and Safety Data Sheets, as applicable, for shower pans, valves, fixtures, tile, grout, waterproofing membrane, cement board, sealants, and paint. The QAE shall approve all materials before purchase.
2.0 SPECIFIC REQUIREMENTS/TASKS
• 2.1 TASK ONE: Demolition and Preparation
• 2.1.1 The contractor shall perform all work in accordance with applicable federal, state, and local codes and regulations, including applicable building, plumbing, fire, environmental, and occupational safety requirements. The contractor shall obtain and maintain all required permits, licenses, inspections, and approvals necessary to complete the work unless otherwise directed by the Contracting
Officer or Contracting Officer’s Representative. The contractor shall protect existing walls, floors, ceilings, fixtures, equipment, and adjacent spaces from damage, dust, debris, and water intrusion. Any damage caused by the contractor shall be repaired to the satisfaction of the government at no additional cost.
• 2.1.2 Site Preparation: Protect surrounding areas from dust and debris. Post required OSHA safety posters and information for all on-site personnel.
• 2.1.3 Demolition: Demolish and dispose of fifteen (15) existing shower stalls, including tile, backer board, shower pans, and associated plumbing fixtures, off-site in accordance with local laws.
• 2.2 TASK TWO: Shower System Installation
• 2.2.1 Contractor shall coordinate the water shutoff to the shower space with the
Contracting Officer’s QA Evaluator Representative (QAE) before beginning work.
LAST UPDATED: 24/AUG/2026 PAGE 3/9
• 2.2.2 Plumbing: Re-plumb hot/cold supply lines and drains as necessary to accommodate new Moen equivalent diverter valves with Chrome trim. Each shower shall include one (1) handheld showerhead with hose, mounting bracket, and compatible trim.
• 2.2.3 Wall & Pan Installation: Install new Proflo equivalent fiberglass shower pans. Shower wall assemblies shall be installed using cementitious backer board and a liquid-applied waterproofing membrane installed in accordance with the manufacturer’s written instructions. All seams, corners, penetrations, and transitions shall be properly sealed. The contractor shall perform water testing or leak checks prior to final acceptance.
• 2.2.4 Tiling: Install new tile and apply grout. Tiles shall be white subway style. [QAE to approve final tile specifications, including size (e.g., 4”x4"), type
(e.g., glazed ceramic), thickness, and quality grade prior to purchase].
• 2.2.5 Finishing: Spackle and paint any disturbed areas to match the surrounding finish.
• 2.3 TASK THREE: Site Cleanup and Final Inspection
• 2.3.1 Cleanup: The contractor shall legally remove and dispose of all demolition debris, packaging, and project waste off site in accordance with applicable laws and regulations. Government dumpsters shall not be used unless expressly authorized by the COR.
• 2.3.2 Inspection: Conduct a final walkthrough with the QAE to ensure all work is completed to specification. The contractor shall test all supply and drain connections for leaks before the enclosure and again after the installation is
LAST UPDATED: 24/AUG/2026 PAGE 4/9
complete. Any leaks, defective materials, or installation deficiencies shall be corrected at no additional cost to the government before final acceptance.
• 2.4 TASK FOUR: Warranty
• 2.4.1: Provide a one-year warranty on all labor and materials.
3.0 PROJECT ADMINISTRATION
• 3.1 Period of Performance: The period of performance shall not exceed 90 calendar days from the date of Notice to Proceed.
• 3.2 Place of Performance: United States Coast Guard Sector Delaware Bay, 1
Washington Ave, Philadelphia, PA 19147.
• 3.3 Hours of Operation: Work shall be performed between 0730 and 1500 Eastern
Standard Time, Monday-Friday, excluding Federal holidays.
4.0 DELIVERABLES & MILESTONES
Item SOW Ref. Deliverable / Milestone Due By
1 - Final Project & Safety Plan Date of Notice to Proceed
2 - Material Specification Sheets TBD by QAE
3 - Weekly Progress Reports Every Friday
4 - Milestone Check: Demolition Complete TBD by QAE
5 - Milestone Check: Installation Complete TBD by QAE
6 2.3.2 Final Walkthrough & Inspection Prior to contract completion
7 2.4 Warranty Documentation Upon project completion
5.0 ACCESS, BADGING, AND SECURITY REQUIREMENTS
LAST UPDATED: 24/AUG/2026 PAGE 5/9
• 5.1 Employee Identification
All visitors must complete a visitor access request by emailing employee information to the COR 72 hours prior to arrival. Visitors shall present a Real ID or
Passport when attempting to access the facility. Visitors shall also submit:
• Full Name
• Date of Birth
• Last four (4) of SSN
Visiting Contractor employees shall comply with all Government escort rules and requirements. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent and always display all identification and visitor badges in plain view above the waist.
• 5.2 Employee Conduct
Contractor’s employees shall comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The
Contractor shall ensure Contractor employees always present a professional appearance and that their conduct shall not reflect discredit on the United States or the Department of Homeland Security. The Contractor shall ensure
Contractor employees understand and abide by Department of Homeland
Security established rules, regulations and policies concerning safety and security.
LAST UPDATED: 24/AUG/2026 PAGE 6/9
• 5.3 Removing Employees for Misconduct or Security Reasons
The Government may, at its sole discretion (via the Contracting Officer), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The
Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
6.0 CONTRACTING OFFICER’S REPRESENTATIVE (COR)
• The designated Contracting Officer’s Representative for this project is SKCS Sergio
Cosby
Email: Sergio.A.Cosby@uscg.mil
7.0 CONTRACTING OFFICER’S QA EVALUATOR REPRESENTATIVE (QAE)
• The designated Contracting Officer’s QAE Representative for this project is EM1
Raymond Crowley.
Email: Raymond.A.Crowley2@uscg.mil
Phone: (215) 271-4843
7.0 ATTACHMENTS
8.0 Project Photographs w/ Measurements
mailto:Sergio.A.Cosby@uscg.mil mailto:Raymond.A.Crowley2@uscg.mil
LAST UPDATED: 24/AUG/2026 PAGE 7/9
LAST UPDATED: 24/AUG/2026 PAGE 8/9
LAST UPDATED: 24/AUG/2026 PAGE 9/9
File details come from the government source that posted it. Updated .