This statement of work outlines requirements for a contractor to repair a steam leak at a USDA facility in Ames, Iowa. The contractor must procure materials including a 14-inch schedule 40 or 80 black pipe spool with welded flanges, flexotalic gaskets, and bolts. The contractor will remove an existing leaking valve and replace it with the spool piece within an scheduled steam system shutdown. The work must be scheduled within 14 days of award and completed within 30 days. Evaluation will be based on lowest price technically acceptable offer that meets the required scheduling timeline. Delivery and performance of work will be at 1920 Dayton Avenue in Ames. This statement of work corresponds to solicitation number 12505B23Q0226 issued by the USDA Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area to obtain these repair services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Project: Procure materials and labor for repair of Valve Vault 101 Steam leak for USDA in
Ames IA
GENERAL INFORMATION
1.0 Scope of Work: Repair steam leak on 14” valve in valve vault 101. Remove existing valve and replace with a “spool” which consists of a piece of 14” schedule 40 or 80 black pipe with 2 - 14” flanges welded on each end. Install with 2 flexotalic gaskets. New bolts will also be required.
2.0 Background: The current leaking valve replacement will need replaced with a scheduled campus steam shutdown with USDA personnel. Valve Vault 101 is an underground concrete vault with a single access from the top using a stationary built in ladder. Safety harness and air monitoring will be required.
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks:
Contractor shall provide the following items to complete repair and labor to satisfactorily complete repair:
1. 1 - Piece of 14” schedule 40 or 80 black pipe (length to be determined by contractor)
2. 2- 14” weldneck or slip on 300lb flanges
3. 2- 14” flexotalic gaskets
4. 40 new bolts for flanges
5. Contractor will be expected to remove existing 14” valve and replace with a flanged spool piece.
6. Work will need to be completed onsite at 1920 Dayton Rd, Ames IA, 50010.
4.0 Deliverables/Schedule: Work shall be scheduled within 14 days of date of award. Work shall be completed within 30 days of date of award. A USDA steam system shutdown will be required for this repair.
5.0 Evaluation Factors: Lowest price technically acceptable within scheduling timeline required.
6.0 Place of Delivery: 1920 Dayton Avenue, Ames IA 50010