This statement of work and related solicitation are for a condenser replacement project at Eglin Air Force Base in Florida. The contractor will be required to remove an existing condenser unit and install a new unit that meets current lab cooling requirements. The contractor must provide all labor, materials, equipment, and safety measures. Technicians must be air conditioning qualified with at least one year of experience. The delivery deadline is 14 weeks after solicitation, and installation must be completed within two weeks once on site. The solicitation number is FA282324Q0015 and was issued by the Department of the Air Force Materiel Command Test Center. Bids are due by the date specified in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Condenser Replacement, newest first.
File Type Posted
Questions and Answers.docx DOCX document
RFQ Addendums 2.pdf PDF
Solicitation Amendment FA282324Q00150002 SF 30.pdf PDF
WD.pdf PDF
Solicitation Amendment - FA282324Q00150002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work 12/12/2023

SCOPE OF WORK DESCRIPTION

Project Location:

Eglin AFB, FL 32542

Project Manager at Location:

Contractor to provide all compatible components necessary to:

•Remove power to existing condenser unit Model TCDV 251-A using proper lock out tag out procedures.

•Remove the existing condenser unit Model TCDV 251-A and all connected hardware.

•Remove and recover refrigerant in accordance with EPA guidelines.

•Install new condenser unit that meets current lab requirements for cooling (see “Unit To Be Replaced Specifications” below).

•Secure power to new condenser unit.

•Charge system with refrigerant to factory specifications.

•Perform start up and verify proper operation.

•Install protective barrier around perimeter to prevent damage to coil intake.

•Removal and disposal of old unit.

Contractor shall provide all labor, materials, equipment, transportation, and safety equipment for all elements of the project to provide a complete and properly operative installation.

Contractor is to provide an itemized service proposal when solicitation is open for bid.

Technicians performing the work shall be Air Condition Systems qualified and have no less than one (1) years minimum of experience inspecting, maintaining, and repairing A/C Systems.

UNIT TO BE REPLACED SPECIFICATIONS

Condenser Model #: TCDV 251-A

Volts: 460 Ph: 3 Hz: 60 No. Fans: 3

Full Load Amps: 5.2 Minimum Supply Circuit Amps: 5.7

Max Fuse or Circuit Breaker Size: 15

Motor Type Qty HP Volts Ph FLA

VFD/Motor 1 0.75 460 3 1.8 Polyphase 2 0.75 460 3 1.7

Suitable for: R12, R22, R500, R502, and R407C

Design Pressure High Side: 320 PSIG

Design Pressure Low Side: 165 PSIG

Max Pressure: 440 PSIG

ORDERING TABLE

PART(S) TO BE ORDERED QUANTITY

Brand name or equal 1

SAFETY REQUIREMENTS

The Contractor shall comply with all Federal, State, and local laws and safety regulations.

Compliance with Occupational Safety and Health Administration (OSHA), Corps of Engineers safety manual EM 385-1 and other applicable laws and regulations for the protection of Contractor employees is exclusively the obligation of the Contractor. The Contractor is responsible for furnishing Contractor employees with all necessary personal protective equipment and site-related safety equipment to perform services.

SECURITY REQUIREMENTS

Contractor shall provide valid driver’s license or other state identification to the Project Manager prior to project start.

Contractor employees will be denied access to the base if they have been convicted of 2 misdemeanors within five years or any felony within 10 years. If a contractor employee has any convictions and has not coordinated with the Contracting Officer in advance prior to incurring costs to fulfill contract requirements, the Government shall not be responsible for payment of any incurred costs.

COMPLETION PROCEDURES

Contractor will submit an electronic copy of the inspection documents to the Project Manager via email.

Contractor shall be responsible for site cleanup, to include legally disposing of remaining waste.

DELIVERY REQUIREMENTS

Not to exceed 14 weeks ARO post-solicitation.

INSTALLATION SPECIFICS

Contractor requiring a base pass must coordinate with the Project Manager at least 7 days prior to scheduled installation and include the names and driver’s license number of each individual requiring base access. Request shall also include anticipated installation time frame for this project to accommodate scheduling downtime for 16EWS labs.

Total installation time not to exceed two weeks.

Work is authorized during normal business hours: M-F: 0700-1500.