SOW_PR 31110PR260000003.pdf
PDF 48 KB Posted
- Attached to
- USCG BASE NCR FACILITIES CARPET AND TILE REPLACEMENT Federal contract opportunity
- Solicitation number
- 31110PR260000003
About this file
This is a Statement of Work (SOW) for carpet tile replacement services at a federal facility.
The vendor must replace approximately 1,300 square feet of carpet tiles in four specified spaces: 6S13-04, 6S13-05, 6S13-03, and 6S13-02. The vendor is responsible for rolling and disposing of existing carpet at no additional cost to the government, lifting and relocating furniture as needed, and returning all furniture to original locations upon completion. The work must be completed within one business day at a mutually scheduled date between the vendor and government. The vendor assumes responsibility for any security delays encountered when accessing the campus and construction location, and must arrange background checks for all employees and subcontractors. The carpet material must meet GSA, DHS, and Coast Guard requirements, along with applicable industry practices. The vendor shall provide multiple near-match options aligned with existing building standards, from which the government will select a single option for installation. The document includes a floor plan diagram identifying the four spaces requiring carpet replacement within a larger facility layout.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Carpet Tile Color and Model type_Picture.pdf | ||
| Questions_Answers to 31110PR260000003 .pdf | ||
| Base NCR Facilities_SF1449 (1).pdf | ||
| Attachment 2 - Pricing Spreadsheet (Solicitation) (1).xlsx | XLSX spreadsheet | |
| 12a. RFQ Schedule 31110PR260000003 (FINAL).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The basic scope of work is as follows:
Replace carpet tiles within spaces: 6S13-04; 6S13-05; 6S13-03 and 6S13-02. Existing carpet is rolled and will need to be disposed of without additional cost to the government. Vendor will lift and/or relocate furniture; all furniture will be in their original location at the conclusion of the work.
Vendor will be responsible for any security delays in accessing the campus and construction location. Background checks will be performed on all employees and sub-contractors. Vendor will provide options of a near match to existing building standard of which the government will select a single option. The carpet must meet all GSA, DHS and CG requirements, and industry practices.
The work must be completed within one work-day at a mutually scheduled business day between the vendor and the government.
*Amplifying information, for this project it is ~1,300 sqft of carpet for carpet squares and below is a diagram of the area.