This Statement of Work (SOW) details the flooring replacement project for the 12x20 main building at the Splatter Swamp Paintball Course on Moody Air Force Base. The project scope involves removing existing damaged flooring and sub-flooring caused by Hurricane Helene, and installing new ¾ plywood sub-flooring with VCT tile and base. The contractor is required to supply all necessary equipment, provide a dumpster and portable restroom, and will receive a staging area near the worksite.

The project is part of Solicitation FA483025R0007, a 100% Small Business Set-Aside under the Department of the Air Force Air Combat Command. The objective is to restore the structural integrity, functionality, safety, and aesthetics of the building, which will help Moody AFB recover paintball course income. The contractor will receive a standard 1-year warranty, and the VCT tile color will be chosen by the customer before work begins. A site visit is scheduled for Friday, June 6th at 1000, with questions due by Tuesday, June 10th at 1000.

View the file

Other files

File Type Posted
Pictures.pdf PDF
Combo Synopsis Shelters.pdf PDF
QandA.pdf PDF
Base Pass Template.pdf PDF
SOW - Picnic Shelters and Storage Structures.pdf PDF
Combo Synopsis Shelters.pdf PDF
base map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Replace Flooring in 12x20 Main Bldg at Splatter Swamp Paintball Course – 23d FSS

1. Scope The project involves the replacement of the plywood sub-floor and installation of VCT tile and base at the Splatter Swamp Paintball Course on Moody AFB. The damages were incurred during Hurricane Helene, necessitating the demo of the entire flooring and sub-flooring and installation of new sub-flooring and VCT tile and base. The objective of the project is to restore the structural integrity, functionality, safety, and aesthetics of the 12x20 building at Moody AFB.

2. Background 23d FSS strives to meet the needs of our customer base. The Splatter Swamp Paintball Course at Moody AFB has a 12x20 building that incurred damage from water entering the building through a leak in the door during Hurricane Helene. Moody AFB is not able to supply the demand for our paintball course to our customers due to the building damage sustained by Hurricane Helene. This has a direct, negative impact on the health of the MWRF. Replacing the flooring in our main building that stores all our equipment will allow Moody AFB to recover these lines of income in support of the MWRF.

3. Requirements

3.1 12x20 Main Building at Splatter Swamp Paintball Course (Moody AFB) o Overall Dimensions: 12’x20’ Portable Building o Material

VCT tile and base Plywood sub-flooring o Site Preparation, Demolition, and Installation Customer will remove all materials and equipment currently located inside of the building.

Contractor will remove and dispose of the existing flooring and sub-flooring into a contractor provided dumpster located on-site.

Install new ¾ plywood sub-floor throughout the building Install VCT tile and base

• VCT tile color to be chosen by customer before work begins

Standard 1-year warranty to be provided by Contractor.

3.2 Equipment Requirements

All Equipment Required to Complete the Flooring in Its Entirety Shall Be

Supplied by the Contractor Contractor is responsible for providing their own dumpster to be located on-site and portable restroom.

• Customer commits to providing a staging area close to the worksite