SOW Package PBG MALSR Site Improvements.pdf
PDF 3 MB Posted
- Solicitation number
- 2403395
About this file
This document is a Statement of Work (SOW) for the Federal Aviation Administration (FAA) site located at Plattsburgh International Airport in Plattsburgh, New York. The SOW covers drainage improvements and replacement of the low voltage electrical service at the FAA's MALSR (Medium Intensity Approach Lighting System) site.
The key requirements include performing a ground penetrating radar survey, providing and installing power from the on-site transformer to the MALSR shelter, removing and disposing of the existing wood post disconnect rack, installing new 4-inch French drains, restoring the grass area, replacing two heaved bollards, and providing and installing new fabric, crushed stone, and landscape timber. The work must be completed within 33 calendar days of the contractor's Notice to Proceed. The contractor must have experience in similar site work and drainage systems, and the electrical work must be performed by a licensed journeyman electrician. Badging and movement area driving privileges at the Plattsburgh Airport are required. All work must comply with Davis Bacon Labor Rates and OSHA requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plans PBG MALSR Site Improvements 23005465.pdf | ||
| Additional Site Pictures.pdf | ||
| Payment Bond.pdf | ||
| Bid Bond.pdf | ||
| Performance Bond.pdf | ||
| Experience Information Form 6973GH24R00200.pdf | ||
| WD NewYork.pdf | ||
| 6973GH-24-R-00200.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Aviation Administration
Statement of Work PBG (Plattsburgh, NY) MALSR
Site Improvements
SITE IMPROVEMENTS JANUARY 2024
MALSR PLATTSBURGH, NY
1. DESCRIPTION: The PBG (Plattsburgh, NY) MALSR (Medium Intensity Approach Lighting
System) is a FAA site located on RWY 35 at Plattsburgh International Airport. The site includes an 8’x16’ fiberglass equipment shelter supported by a concrete foundation, wood post service disconnect rack and a 50 kVA transformer on a concrete pad that was installed approximately 20 years ago. The site is experiencing poor drainage where there is standing water on the site and the existing disconnect rack has heaved. The site is in need of drainage improvements and to replace the low voltage electrical service.
2. FACILITY: The project is located at the following location:
1. FAA site at Plattsburgh International Airport (PBG), RWY 35 MALSR Shelter
2. GPS Coordinates: 44°37'58.35"N, 73°27'33.64"W
3. GENERAL: The contractor must furnish all labor, supervision, engineering, materials, services, insurance, equipment, and tools necessary to accomplish the Scope of Work and project requirements. All work must follow Davis Bacon Labor Rates and comply with OSHA requirements.
4. SCOPE OF WORK:
1. Perform a State of New York dig safe and a private ground penetrating radar survey at construction start.
2. Provide and install power from the secondary side of the on-site 50 kVA transformer to the MALSR shelter main disconnect which includes a new disconnect rack concrete pad, disconnect rack, electrical equipment, duct bank, conductors, grounding and lightning protection as shown in the contract drawings.
3. The MALSR is critical to the operation of the runway. The contractor must follow the phasing plan listed in sheet C001. The MALSR must remain operational throughout the project except for a minimized, scheduled cut over used to transfer from existing power to new.
4. Perform all electrical testing and terminations per the contract drawings. FAA will operate the equipment. The Contractor is responsible to coordinate with the utility to remove power to the transformer. Live electrical work is not permitted.
5. Remove and dispose of the existing wood post disconnect rack and associated electrical equipment after the cut over.
6. Remove the top 6 inches of compacted crusher run gravel and fabric in the approximate 30’x 40’ gravel area.
7. Remove 3’wide section of the top 6 inches of soil and grass at the north side of the site along the entire 30’ length.
8. Provide and install new 4-inch French drains as shown in sheet C002. New French drains must extend to the culvert/swale.
9. Restore the grass area disturbed by the French drain installation by hydroseeding with an airport approved grass seed mix.
10. Replace the 2 heaved bollards between the MALSR shelter and paved access road with 2 new bollards.
11. Provide and install new fabric and 6 inches of ¾” crushed stone throughout the gravel area and the 3’ wide gravel extension area.
12. Provide and install new pressure treated landscape timber at the perimeter of the gravel and gravel extension area.
13. Soil spoils may be disposed at the Airport spoils area which is located on the northern half of the airfield.
14. Contractor must attain badging and movement area driving privileges at the Plattsburgh Airport. Contractor must allocate at least 1 person for 40 hours in their bid. Badging contact is Tom Rogers Thomas.Rogers@clintoncountyny.org.
15. Provide redlines showing the exact locations of the new duct banks and French drains.
5. MATERIALS:
1. Materials furnished by the contractor for this project must be new, unless specified materials can be re-used. All product to be installed to manufacturer’s specification.
2. Hazardous Materials. No materials supplied by the contractor for this project shall contain asbestos or lead-based materials. All SDS sheets must be provided prior to construction for all required materials.
6. PERFORMANCE PERIOD: Complete all work within 33 calendar days of Contractor’s Notice to
Proceed. Based on facility requirements, night work is not required.
7. MEETINGS: Attend 2 separate meetings at the facility/ virtual (CO/COR discretion) after contract award and prior to start of work. Meetings may be on different days and several days or weeks apart. All meetings are mandatory. Meetings include:
A. Preconstruction:
1. Logistics, schedule, deliveries, mobilization, etc.
2. Contractor personnel
3. Submittal approval
B. Operational Risk Management/ Mitigation:
1. Personnel and facility safety requirements
2. Coordination and communication for outages
8. SECURITY: Site access is restricted. Contractor must have a badged employee. Contractor only allowed to work on site with FAA representative present. Comply with all facility and airport security and operations requirements and inspections.
A. All personnel performing work under this contract will be subject to the security requirements of the facility and airport.
9. SUBMITTALS: Materials and Equipment. Provide submittal data for all equipment and materials proposed for use. Electronic portable document format (PDF) files of manufacturer’s complete performance data and descriptive literature shall be submitted to the Contracting Officer (CO) for review and approval. Highlight specific model numbers, styles, and types scheduled for installation. All equipment and material that are not in accordance with the contract drawings and specifications shall be specifically noted and highlighted in the submission.
1. All submittals must be completed prior to starting construction.
2. Submit on all materials.
3. Submit on a schedule. Schedule must be continuous and efficient.
4. Submit on an excavation plan showing the excavation process, equipment, risk mitigations and dates of work.
5. Submit on a cut over plan outlining a step-by-step process on cutting over the power from existing to new. Include dates and duration of work.
mailto:Thomas.Rogers@clintoncountyny.org
10. INSTALLER QUALIFICATIONS:
A. The installing contractor must have experience in similar site work and drainage systems.
B. Electrical work must be completed by a licensed journeyman electrician familiar with the installation and requirements in the contract documents. The electrician must present license upon request. The electrician must review FAA electrical standards 1217 and FAA Grounding standard 19F. Copies of these standards can be provided upon request.
11. PROJECT CONDITIONS:
A. Work Hours:
1. Accomplish all work during hours between 7:00 AM and 5:00 PM (local time), Monday through Friday on mutually agreeable dates. Hours and dates are subject to change due to FAA operational requirements. Work must not impact operational time of Air Traffic or airport operations.
B. Operational Risk Avoidance:
1. General. This facility provides services to assist in the control of aircraft movement, operates 24 hours a day, 365 days a year, and is vital to the National Airspace System.
The building is densely filled with electric and electronic equipment. This facility is secured with locked interior and exterior doors. All work will be performed with the facility maintaining full operation.
2. Coordination of Work Affecting Operational Systems or Personnel. Coordinate all work that has any or may have any impact on any operational systems or personnel within the facility through the COR. Cease any work that is adversely impacting the operations of the facility or personnel and immediately report impact to the COR;
repair or restore any portion of the operational system that has been damaged or suffered diminished performance as a result of the Contractor’s activities.
3. Avoid actions deemed detrimental or increasing risk to the facility’s mission, occupants, or equipment.
4. Avoid activities that create objectionable noise, release detectable odors, or generate smoke.
5. Avoid activities that impede traffic flow to maximum extent feasible, which may delay or impede access of personnel to the facility. Coordinate any impacts in advance.
6. Circuit Breakers and disconnect switches will be operated by FAA personnel only.
Contractor personnel must not operate circuit breakers or any other electrical disconnecting device. FAA will lockout/tagout equipment to insure personnel safety while safeguarding facility operations. Contractor shall participate as an observer in lockout/tagout procedures in order to protect contractor as well as FAA personnel.
Contractor required to submit lockout/ tagout plan for approval, prior to construction.
C. Safety:
1. Perform all work safely and in accordance with the following requirements.
2. Comply with FAA Electrical Standards, FAA Safety Standards, National Electrical Code (NFPA 70), National Fire Code, OSHA, manufacturer’s recommendations, local, state, and federal regulations, other authorities having jurisdiction, and local facility requirements. FAA Standards are available on request.
3. Workers must use Personal Protective Equipment (PPE) as required by code, regulation, standard, or manufacturer’s recommendation.
4. Operators of and heavy equipment or machinery must be properly certified.
5. Digsafe must be called and all known utilities marked prior to excavations.
6. Contractor to secure the working area at all times to protect personnel and their belongings from debris, machinery or any working hazard as they access or leave the facility. The work area shall be properly lit when needed and cleaned after construction activities to avoid any damage. The construction site shall be maintained in a clean and orderly fashion at all times.
D. Coordination and Approval: Coordinate with and obtain approval from the COR for work schedule, hours, and activities on a daily basis. Coordinate high risk tasks with COR prior to work start. High risk tasks include, but not limited to outages, cutovers, rigging activity, and temporary road closures.
E. Drawings. The contractor to maintain redline drawings throughout construction to be provided to the COR at project completion.
12. CLEANUP:
1. Remove all debris, rubbish, scrap, dirt, and protective coverings from the work areas upon completion of the work shift each day. Site conditions throughout construction period will not impact site operations. The affected work areas shall be thoroughly cleaned to their original condition at the end of each work shift. Site must be returned to original condition prior to project completion.
2. Contractor must use a covered dumpster. Do not allow foreign object debris to spread on the airfield and affect operations.
13. TEMPORARY SANITARY FACILITIES: Provide temporary sanitary facilities to be used by workers on site. Facilities must remain on site for the duration of the contract. Final location will be coordinated with the COR and approved by the COR.
14. UTILITIES: Single 120v outlet located inside the MALSR shelter is available. Water is not available at the site.
15. QUALITY ASSURANCE AND WORKMANSHIP: All work shall be accomplished in a neat, workmanlike manner by skilled workmen regularly engaged in their respective trade resulting in an installation that is absolutely satisfactory in both function and appearance as determined by the COR.
16. WARRANTY:
A. All material, equipment, and workmanship provided in the project shall be warranted for a period of one (1) year, from date of acceptance by the COR.
17. INSPECTION: Submit a written request for inspection for Substantial Completion, also referred to as the Contractor Acceptance Inspection (CAI). On receipt of request, COR will either schedule the inspection within fourteen (14) days or notify Contractor of unfulfilled requirements. COR will prepare the Certificate of Substantial Completion after the inspection or will notify Contractor of items, either on Contractor's list or additional items identified by COR, that must be completed or corrected before certificate will be issued. COR will also provide a punch list that will form the basis of requirements for Final Completion.
18. PROJECT CLOSEOUT: Contractor should request final inspection prior to contract completion date. Before requesting final inspection for determining date of Final Completion, complete the following:
a. Submit a Final Application for Payment.
b. Submit a certified copy of COR’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by the COR. The certified copy of the list must state that each item has been completed or otherwise resolved for acceptance.
c. Submit specific warranties, final certifications and similar documents.
d. Perform final cleanup.
END OF SECTION
APPENDIX
List of Drawings
PBG-22-G001 Coversheet PBG-22-C001 Existing Site Layout PBG-22-C002 New Drainage and Site Work PBG-22-C003 New Disconnect Rack and Duct Bank PBG-22-E001 Disconnect Rack One Line, Layout and Grounding
Specifications
03 33 00 – Cast In Place Concrete 26 05 00 – Electrical 26 05 19 – Low Voltage Electrical Power Conductors and Cables 26 05 29 – Hangers and Supports for Electrical Systems 31 23 00 – Excavation and Fill
Site Pictures
Pages 1-4 as attached to this package.
CAST-IN-PLACE CONCRETE 03 30 00 - 1
SECTION 03 30 00 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. This Section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes, for the following:
1. Slabs-on-grade
2. Concrete pier (bollards)
1.2 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume; subject to compliance with requirements.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Design Mixtures: For each concrete mixture. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.
1. Indicate amounts of mixing water to be withheld for later addition at Project site.
C. Steel Reinforcement Shop Drawings: Placing drawings that show bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, splices and laps for concrete reinforcement.
D. Qualification Data: Installer shall have at least 5 year’s experience in concrete construction.
E. Material Test Reports: For the following, from a qualified testing agency, indicating compliance with requirements:
F. Material Certificates: For each of the following, signed by manufacturers:
1. Cementitious materials.
2. Admixtures.
3. Form materials and form-release agents.
4. Steel reinforcement and accessories.
5. Curing compounds.
6. Floor and slab treatments.
7. Bonding agents.
8. Repair materials.
CAST-IN-PLACE CONCRETE 03 30 00 - 2
G. Floor surface flatness and levelness measurements to determine compliance with specified tolerances.
1.4 QUALITY ASSURANCE
A. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.
1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities."
B. ACI Publications: Comply with the following unless modified by requirements in the Contract Documents:
1. ACI 301, "Specification for Structural Concrete,"
2. ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."
3. ACI 305R-20, “Guide to Hot Weather Concreting.”
4. ACI 306R-16, “Guide to Cold Weather Concreting.”
1.5 DELIVERY, STORAGE, AND HANDLING
A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:
1. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products specified.
2. Products: Subject to compliance with requirements, provide one of the products specified.
3. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, manufacturers specified.
4. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers specified.
2.2 FORM-FACING MATERIALS
A. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.
CAST-IN-PLACE CONCRETE 03 30 00 - 3
1. Plywood, metal, or other approved panel materials.
2. Exterior-grade plywood panels, suitable for concrete forms, complying with DOC PS 1, and as follows:
a. Medium-density overlay, Class 1 or better; mill-release agent treated and edge sealed.
b. Grade C
B. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum.
C. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.
1. Formulate form-release agent with rust inhibitor for steel form-facing materials.
2.3 STEEL REINFORCEMENT
A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed.
2.4 REINFORCEMENT ACCESSORIES
A. Joint Dowel Bars: ASTM A 615/A 615M, Grade 60, plain-steel bars, cut bars true to length with ends square and free of burrs.
B. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:
2.5 CONCRETE MATERIALS
A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project:
1. Portland Cement: ASTM C 150, Type [I]
a. Fly Ash: ASTM C 618, Class [C] [F].
b. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 100 or 120.
2. Blended Hydraulic Cement: ASTM C 595, Type [IP, portland-pozzolan] [I (PM), pozzolan-modified portland] [I (SM), slag-modified portland] cement.
B. Silica Fume: ASTM C 1240, amorphous silica.
C. Normal-Weight Aggregates: ASTM C 33, Class 3S coarse aggregate or better, graded. Provide aggregates from a single source.
1. Maximum Coarse-Aggregate Size: 3/4 inch nominal.
2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.
CAST-IN-PLACE CONCRETE 03 30 00 - 4
D. Water: ASTM C 94/C 94M and potable.
2.6 ADMIXTURES
A. Air-Entraining Admixture: ASTM C 260.
B. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other admixtures and that will not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.
1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.
2. High-Range, Water-Reducing Admixture: ASTM C 494/C 494M, Type F.
3. Plasticizing: ASTM C 1017/C 1017M, Type II.
C. Granular Fill: Clean mixture of crushed stone or crushed or uncrushed gravel; ASTM D 448, Size 57, with 100 percent passing a 1-1/2-inch sieve and 0 to 5 percent passing a No. 8 sieve.
D. Fine-Graded Granular Material: Clean mixture of crushed stone, crushed gravel, and manufactured or natural sand; ASTM D 448, Size 10, with 100 percent passing a 3/8-inch sieve, 10 to 30 percent passing a No. 100 sieve, and at least 5 percent passing No. 200 sieve;
complying with deleterious substance limits of ASTM C 33 for fine aggregates.
2.7 CURING MATERIALS
A. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry.
B. Moisture-Retaining Cover: Prevent cover from coming in contact with concrete to avoid imperfections.
C. Water: Potable.
D. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating. Contractor must ensure ACI 305 is followed if hot weather is expected.
1. Available Products:
a. Anti-Hydro International, Inc.; AH Curing Compound #2 DR WB.
b. Burke by Edoco; Aqua Resin Cure.
c. ChemMasters; Safe-Cure Clear.
d. Conspec Marketing & Manufacturing Co., Inc., a Dayton Superior Company;
W.B. Resin Cure.
e. Dayton Superior Corporation; Day Chem Rez Cure (J-11-W).
f. Euclid Chemical Company (The); Kurez DR VOX.
g. Kaufman Products, Inc.; Thinfilm 420.
h. Lambert Corporation; Aqua Kure-Clear.
i. L&M Construction Chemicals, Inc.; L&M Cure R.
j. Meadows, W. R., Inc.; 1100 Clear.
CAST-IN-PLACE CONCRETE 03 30 00 - 5
k. Nox-Crete Products Group, Kinsman Corporation; Resin Cure E.
l. Symons Corporation, a Dayton Superior Company; Resi-Chem Clear Cure.
m. Tamms Industries, Inc.; Horncure WB 30.
n. Unitex; Hydro Cure 309.
o. US Mix Products Company; US Spec Maxcure Resin Clear.
p. Vexcon Chemicals, Inc.; Certi-Vex Enviocure 100.
2.8 RELATED MATERIALS
A. Bonding Agent: ASTM C 1059, Type II, non-redispersible, acrylic emulsion or styrene butadiene.
B. Epoxy Bonding Adhesive: ASTM C 881, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class suitable for application temperature and of grade to suit requirements, and as follows:
2.9 CONCRETE MIXTURES, GENERAL
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.
1. Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures.
B. Cementitious Materials: Use fly ash, pozzolan, ground granulated blast-furnace slag, and silica fume as needed to reduce the total amount of portland cement, which would otherwise be used, by not less than 40 percent.
1. Fly Ash: 25 percent.
2. Combined Fly Ash and Pozzolan: 25 percent.
3. Ground Granulated Blast-Furnace Slag: 50 percent.
4. Combined Fly Ash or Pozzolan and Ground Granulated Blast-Furnace Slag: 50 percent portland cement minimum, with fly ash or pozzolan not exceeding 25 percent.
5. Silica Fume: 10 percent.
6. Combined Fly Ash, Pozzolans, and Silica Fume: 35 percent with fly ash or pozzolans not exceeding 25 percent and silica fume not exceeding 10 percent.
7. Combined Fly Ash or Pozzolans, Ground Granulated Blast-Furnace Slag, and Silica
Fume: 50 percent with fly ash or pozzolans not exceeding 25 percent and silica fume not exceeding 10 percent.
C. Admixtures: Use admixtures according to manufacturer's written instructions.
1. Use high-range water-reducing or plasticizing admixture in concrete, as required, for placement and workability if desired.
2. Use water-reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions if desired.
CAST-IN-PLACE CONCRETE 03 30 00 - 6
2.10 CONCRETE MIXTURES FOR BUILDING ELEMENTS
A. Slabs on Grade: Proportion normal-weight concrete mixture as follows:
1. Minimum Compressive Strength: 4000 psi at 28 days.
2. Maximum Water-Cementitious Materials Ratio: 0.45
3. Slump Limit: 4 inches maximum. 8 inches for concrete with verified slump of 2 to 4 inches before adding high-range water-reducing admixture or plasticizing admixture] or minus 1 inch.
4. Air Content: 5.5-7 percent, plus or minus 1.5 percent at point of delivery for 1-1/2-inch nominal maximum aggregate size.
2.11 FABRICATING REINFORCEMENT
A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."
2.12 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M], and furnish batch ticket information.
1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes.
PART 3 - EXECUTION
3.1 FORMWORK
A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads.
B. Per ACI 318, slab on grade must not have forms removed prior to 3 days placement.
C. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117.
D. Limit concrete surface irregularities, designated by ACI 347R as abrupt or gradual, as follows:
1. Class B, 1/4 inch Class C, 1/2 inch for rough-formed finished surfaces.
E. Construct forms tight enough to prevent loss of concrete mortar.
F. Fabricate forms for easy removal without hammering or prying against concrete surfaces.
Provide crush or wrecking plates where stripping may damage cast concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.
1. Do not use rust-stained steel form-facing material.
CAST-IN-PLACE CONCRETE 03 30 00 - 7
G. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces. Provide and secure units to support screed strips; use strike-off templates or compacting-type screeds.
H. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar. Locate temporary openings in forms at inconspicuous locations.
I. Chamfer exterior corners and edges of permanently exposed concrete.
J. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.
K. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.
L. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.
3.2 REMOVING AND REUSING FORMS
A. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form-facing material will not be acceptable for exposed surfaces. Apply new form-release agent.
B. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints.
Align and secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved by COR.
C. Forms must be removed after concrete has cured.
3.3 SHORES AND RESHORES
A. Comply with ACI 318 and ACI 301 for design, installation, and removal of shoring and reshoring.
1. Do not remove shoring or reshoring until measurement of slab tolerances is complete.
B. Plan sequence of removal of shores and reshore to avoid damage to concrete. Locate and provide adequate reshoring to support construction without excessive stress or deflection.
Formwork must not be removed until concrete has cured for 3 days.
3.4 STEEL REINFORCEMENT
A. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that would reduce bond to concrete.
CAST-IN-PLACE CONCRETE 03 30 00 - 8
B. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing reinforcing bars.
C. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.
3.5 CONCRETE PLACEMENT
A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections have been performed.
B. Do not add water to concrete during delivery, at Project site, or during placement unless approved by COR.
C. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301.
1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.
D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated.
Deposit concrete to avoid segregation.
1. Deposit concrete in horizontal layers of depth to not exceed formwork design pressures and in a manner to avoid inclined construction joints.
2. Consolidate placed concrete with mechanical vibrating equipment according to ACI 301.
3. Do not use vibrators to transport concrete inside forms. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity. At each insertion, limit duration of vibration to time necessary to consolidate concrete and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.
E. Cold-Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.
1. When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.
2. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials.
3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.
F. Hot-Weather Placement: Comply with ACI 301 and 305 and as follows:
CAST-IN-PLACE CONCRETE 03 30 00 - 9
1. Maintain concrete temperature below 90 deg F at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.
2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.
G. Curing: When curing concrete the Contractor must use an absorptive type cover per 2.7 B Curing Materials.
3.6 FINISHING FORMED SURFACES
A. Rough-Formed Finish: As-cast concrete texture imparted by form-facing material with tie holes and defects repaired and patched. Remove fins and other projections that exceed specified limits on formed-surface irregularities.
1. Apply to concrete surfaces.
3.7 FINISHING FLOORS AND SLABS
A. General: Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.
B. Float Finish: Consolidate surface with power-driven floats or by hand floating if area is small or inaccessible to power driven floats. Restraighten, cut down high spots, and fill low spots.
Repeat float passes and restraightening until surface is left with a uniform, smooth, granular texture.
C. Broom Finish: Apply a broom finish to exterior concrete platforms, steps, and ramps, and elsewhere as indicated.
1. Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route. Coordinate required final finish with COTR before application.
3.8 MISCELLANEOUS CONCRETE ITEMS
A. Filling In: Fill in holes and openings left in concrete structures, unless otherwise indicated, after work of other trades is in place. Mix, place, and cure concrete, as specified, to blend with in-place construction. Provide other miscellaneous concrete filling indicated or required to complete the Work.
B. Equipment Bases and Foundations: Provide machine and equipment bases and foundations as shown on Drawings. Set anchor bolts for machines and equipment at correct elevations, complying with diagrams or templates from manufacturer furnishing machines and equipment.
CAST-IN-PLACE CONCRETE 03 30 00 - 10
3.9 CONCRETE PROTECTING AND CURING
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-weather protection and ACI 301 for hot-weather protection during curing.
B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.
C. Formed Surfaces: Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces. If forms remain during curing period, moist cure after loosening forms. If removing forms before end of curing period, continue curing for the remainder of the curing period.
D. Unformed Surfaces: Begin curing immediately after finishing concrete. Cure unformed surfaces, including floors and slabs, concrete floor toppings, and other surfaces.
E. Cure concrete according to ACI 308.1, by one or a combination of the following methods:
1. Moisture Curing: Keep surfaces continuously moist for not less than seven days with the following materials:
a. Water.
b. Continuous water-fog spray.
c. Absorptive cover, water saturated, and kept continuously wet. Cover concrete surfaces and edges with 12-inch lap over adjacent absorptive covers. See
2. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions immediately after finishing.
3.10 CONCRETE SURFACE REPAIRS
A. Defective Concrete: Repair and patch defective areas when approved by COR. Remove and replace concrete that cannot be repaired and patched to COR's approval.
B. Patching Mortar: Mix dry-pack patching mortar, consisting of one part portland cement to two and one-half parts fine aggregate passing a No. 16 sieve, using only enough water for handling and placing.
C. Repairing Formed Surfaces: Surface defects include color and texture irregularities, cracks, spalls, air bubbles, honeycombs, rock pockets, fins and other projections on the surface, and stains and other discolorations that cannot be removed by cleaning.
1. Immediately after form removal, cut out honeycombs, rock pockets, and voids more than 1/2 inch in any dimension in solid concrete, but not less than 1 inch in depth. Make edges of cuts perpendicular to concrete surface. Clean, dampen with water, and brush-coat holes and voids with bonding agent. Fill and compact with patching mortar before
CAST-IN-PLACE CONCRETE 03 30 00 - 11
bonding agent has dried. Fill form-tie voids with patching mortar or cone plugs secured in place with bonding agent.
2. Repair defects on surfaces exposed to view by blending white portland cement and standard portland cement so that, when dry, patching mortar will match surrounding color. Patch a test area at inconspicuous locations to verify mixture and color match before proceeding with patching. Compact mortar in place and strike off slightly higher than surrounding surface.
3. Repair defects on concealed formed surfaces that affect concrete's durability and structural performance as determined by COR.
D. Perform structural repairs of concrete, subject to COR's approval, using epoxy adhesive and patching mortar.
E. Repair materials and installation not specified above may be used, subject to COR's approval.
END OF SECTION 03 30 00
SITE IMPROVEMENTS
MALSR
JANUARY 2024
PLATTSBURGH, NY
ELECTRICAL 26 05 00- 1
DIVISION 26 - ELECTRICAL
SECTION 26 05 00 - COMMON WORK RESULTS FOR ELECTRICAL
PART 1 – GENERAL
1.1 SUMMARY
A. General:
1. The general electrical requirements in this section are applicable to both Government Furnished Equipment (GFE) and non-GFE. Materials and equipment shall comply with all requirements of the contract documents. Materials furnished by the Contractor shall be new, the standard products of manufacturers regularly engaged in the production of such materials, and of the manufacturer's latest designs that comply with the specification requirements. If material and equipment requirements conflict, the order of precedence for selection shall be as follows: special contract provision, this specification, the contract drawings; and then in continuing order of precedence, military specifications, federal specifications, NFPA publications, IEEE standards, UL standards and NEMA standards.
Wherever standards have been established by Underwriters Laboratories, Inc., the material shall bear the UL label.
1.2 REFERENCES
A. Use latest versions of FAA Orders and Standards:
1. FAA-STD-1217, Electrical Work, Interior
2. FAA-STD-1391 Installation and Splicing of Underground Cables
3. FAA-STD-019, Lightning and Surge Protection, Grounding, Bonding and Shielding Requirements for Electronic Equipment
B. National Fire Protection Association (NFPA)
1. NFPA 70, National Electrical Code.
2. NFPA 110 Standard for Emergency and Standby Power
Systems
3. NFPA 780 Standard for the Installation of Lightning
Protection Systems
C. Institute of Electrical and Electronic Engineers (IEEE)
1. IEEE C2 National Electrical Safety Code
2. IEEE Std 100 Dictionary of Electrical and Electronics Terms
D. National Electrical Manufactures Association (NEMA)
1. NEMA ICS 6 Industrial Control and Systems Enclosures
2. NEMA MG 1 Motors and Generators
JANUARY 2024
ELECTRICAL 26 05 00- 2
1.3 ELECTRICAL CHARACTERISTICS
A. Provide the following electrical equipment and systems:
1. Equipment, wiring devices and electrical connections required for installation of electrical equipment.
2. Raceways and wiring for power and controls.
3. Grounding systems.
4. Cutting and patching for electrical construction.
B. Spacing Requirements:
1. Electrical equipment sizes indicated on the drawings are generally based on specified manufacturer. Verify that the equipment proposed will fit in the space indicated on the drawings. Coordinate building dimensions with architectural and structural drawings.
Equipment furnished and installed under other Sections of this Specification shall be coordinated with the requirements of this Section. Maintain clearances required by NFPA 70 around electrical equipment. Establish the exact location of electrical equipment based on the actual field verified dimensions of equipment furnished.
C. Departure from Dimensions Shown:
1. Minor departures from exact dimensions shown in electrical plans may be permitted when required to avoid conflict or unnecessary difficulty in placement of a dimensioned item, provided all contract requirements are met. The Contractor shall promptly obtain written approval from the Contracting Officer's Representative prior to undertaking any such departures and shall provide appropriate documentation of the departure.
1.4 SUBMITTALS
A. Product Data: For each type of product specified.
B. Samples: When the adequacy, quality and safety of a material will be better demonstrated and it will expedite approval, provide single samples of items proposed for use. Conform to the procedures specified. Submit samples of color, lettering style, and other graphic representation required for each identification product for the project.
C. Operation and Maintenance Data:
1. Provide two copies of operating and maintenance instructions, equipment service manuals, catalog cuts and illustration as described in this section. The operations and maintenance (O&M) data shall be placed in suitable binders for use by maintenance personnel. The material shall include equipment model and serial numbers, performance characteristics, power and utility requirements and manufacturer's recommended maintenance schedules.
Final acceptance of this equipment is contingent upon submission of required documents to and approval by the Contracting Officer’s Representative prior to the facility turnover.
Operating and maintenance instructions shall contain the following minimum data and shall comply with submittal requirements specified in individual Division 26 Sections.
a. Operating instructions shall include illustrations and explanations for controls, initial set points and startup and shutdown procedures for both normal and emergency conditions.
b. Maintenance instructions shall include periodic inspection and lubrication requirements and where applicable, equipment performance verification
JANUARY 2024
ELECTRICAL 26 05 00- 3
requirements.
2. O&M Data:
a. The O&M binder shall include tabs for insertion of all GFE data. Prepare and distribute operations and maintenance data as specified in Section 01 78 23, “Operation and Maintenance Data.” The O&M data shall contain as appropriate, the following:
1) Wiring diagrams.
2) Electrical schematics.
3) Control diagrams.
4) Wire terminal assignments.
5) Equipment layouts.
3. Record electrical drawings, modified to record actual conditions and modifications, including dimensions.
D. Substitutions: Contractor shall submit on any proposed alternatives.
1.5 QUALITY ASSURANCE
A. Comply with NFPA 70, FAA 19F and FAA-C-1217 for components and installation. In case of conflict between provisions of codes, laws and ordinances, the more stringent requirement shall apply.
B. Material and Equipment Qualifications: Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in the technical section.
C. Listing and Labeling:
1. Provide products specified in the Section that are listed and labeled. The terms "listed and labeled" as defined in the National Electrical Code, Article 100. Listing and labeling agency qualifications: NRTL as defined in 29 CFR 1910.7.
D. Summary:
1. Submit a summary of the Electrical Test Report, noting deviations from requirements listed below:
a. Continuity
b. Insulation Resistance Test
E. Equipment Training (Non-GFE):
1. After final tests and adjustments have been completed, fully instruct the Contracting
Officer’s Representative and other personnel, as directed by the Contracting Officer’s Representative in details of operation and maintenance of special equipment, including
JANUARY 2024
ELECTRICAL 26 05 00- 4
control system as installed.
F. Project Record Documents
1. Maintain at the job site a separate set of white prints of the contract documents for the purpose of recording the system and dimension changes of those portions of work in which actual construction is at variance with the contract documents. The Contractor shall record changes for both GFE and Contractor provided equipment. Upon acceptance of the project, submit documents to the Contracting Officer's Representative, with verification of data accuracy. Mark the drawings with colored pencil. Prepare the drawings as the work progresses. Upon completion of work submit drawings clearly indicating the following:
a. Locations of devices, conduits, equipment and other pertinent items. Indicate the depth of buried ducts and direct burial cable.
b. Schematic and interconnection wiring diagrams of the completed power and control system incorporating the data derived from the equipment shop drawings and the cable and conduit schedule. The drawings shall be detailed to wire and terminal block numbers, conductor color coding, device designations locations and reflect identifications established at the site.
c. Cable and conduit schedule for cables and conduits actually installed; include the type, size, origin, destination, and approximate length for each cable and conduit.
Indicate for each cable the voltage rating, number of conductors, cable number, color coding and routing.
G. Material and Equipment Manufacturing Date: Products manufactured more than 3 years prior to date of delivery to site shall not be used, unless specified otherwise.
1.6 DELIVERY, STORAGE AND HANDLING
A. Contractor provided equipment shall be protected from damage and stored in a dry location from the time of site delivery. Furnish and energize space heaters or provide desiccant recommended by the equipment manufacturer to prevent condensation. Conduct routine inspections of stored equipment to check equipment condition.
B. Interruption of Power:
1. Contractor is advised that the project site is located at a fully operational facility.
Unscheduled power interruptions to any of the electrical distribution systems are not allowed. Work requiring a temporary or permanent de-energizing of the electrical service shall be scheduled and approved in writing by the Contracting Officer's Representative at least 10 calendar days in advance of performance of the work. Work may not commence until written authorization is received from the Contracting Officer's Representative.
PART 2 - PRODUCTS
2.1 SUPPORTING DEVICES
A. Channel and angle supports, sleeves and fasteners shall be as specified in Section 26 05 29, “HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS.”
JANUARY 2024
ELECTRICAL 26 05 00- 5
2.2
ELECTRICAL IDENTIFICATION
A. Provide electrical identification as specified in Section 26 05 53, “IDENTIFICATION FOR
ELECTRICAL SYSTEMS.” Manufacturer's standard products to use colors prescribed by ANSI A13.1 and NFPA 70.
B. Manufacturer's Nameplate: Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.
PART 3 - EXECUTION
3.2 EXCAVATION FOR ELECTRICAL WORK
A. All excavations shall comply with OSHA requirements. Shore and brace as required for stability of excavation.
B. De-Watering:
1. Prevent surface water and subsurface or groundwater from flowing into excavations and from flooding project site and surrounding area. Do not allow water to accumulate in excavations. Remove water to prevent softening of bearing materials. Provide and maintain de-watering system components necessary to convey water away from excavations. Establish and maintain temporary drainage ditches and other diversions outside excavation limits to convey surface water to collecting or run-off areas. Do not use trench excavations as temporary drainage ditches.
C. Material Storage:
1. Stockpile satisfactory excavated materials where directed, until required for backfill or fill. Place, grade and shape stockpiles for proper drainage. Locate and retain soil materials away from edge of excavations. Do not store within drip-line of trees indicated to remain. Remove and legally dispose of excess excavated materials and materials not acceptable for use as backfill or fill.
D. Excavation for Underground Electrical Structures:
1. Conform to elevations and dimensions shown within a tolerance of plus or minus 0.10-foot;
plus a sufficient distance to permit placing and removal of concrete formwork, installation of services, other construction and for inspection. This includes trenching, installation and splicing or other joining of cables and testing of cables. Excavate, by hand, areas within drip-line of large trees. Protect the root system from damage and dry-out. Maintain moist conditions for root system and cover exposed roots with burlap. Paint root cuts of 1-inch in diameter and larger with emulsified asphalt tree paint. Take care not to disturb bottom of excavation.
Excavate by hand to final grade just before concrete reinforcement is placed.
E. Trenching:
1. Excavate trenches for electrical installations as follows:
a. Excavate trenches to the uniform width, sufficiently wide to provide ample working room and clearance on both sides of raceways and equipment.
b. Excavate trenches to depth indicated or required.
JANUARY 2024
ELECTRICAL 26 05 00- 6
c. Limit the length of open trench to that in which installations can be made and the trench backfilled within the same day.
F. Cold Weather Protection:
1. Protection excavation bottoms against freezing when atmospheric temperature is less than 35 degrees F:
G. Backfilling and Filling:
1. Place soil materials in layers to subgrade elevations for each area classification listed below, using materials specified in PART 2 of this Section. Backfill excavations as promptly as work permits, but not until completion of inspection, testing, approval, and locations of underground utilities have been recorded; concrete formwork has been removed; voids have been backfilled;
and trash and debris has been removed.
a. Under building slabs, use drainage fill materials.
b. Under piping and equipment, use sub-base materials where required over rock bearing surface and for correction of unauthorized excavation.
c. Other areas, use excavated or borrowed materials.
H. Placement and Compaction:
1. Place backfill and fill materials in layers of not more than 8 inches in loose depth for material compacted by heavy equipment and not more than 4 inches in loose depth for material compacted by hand-operated tampers.
I. Before Compaction:
1. Moisten or aerate each layer as necessary to provide optimum moisture content. Compact each layer to required percentage of maximum dry density or relative dry density for each area classification specified. Do not place backfill or material on surfaces that are muddy, frozen, or contain frost or ice.
J. Backfill Placement:
1. Place backfill and fill materials evenly adjacent to structures, piping and equipment to required elevations.