This document contains construction drawings and specifications for site improvements at the Plattsburgh International Airport's Medium-intensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR) facility. The key details are:
The project requires drainage improvements and replacement of the low voltage electrical service to the MALSR facility. The work includes installing a new disconnect rack, duct bank, and grounding system. Phasing requirements are provided to maintain MALSR operations during construction. The contractor must perform site excavation, backfill, and grading work. Associated electrical equipment, wiring, and testing requirements are also included.
The Federal Aviation Administration (FAA) is issuing a solicitation for a firm-fixed price contract to perform this work. The solicitation has a NAICS code of 238210 with a $19 million size standard. Contractors must be registered in the System for Award Management (SAM) to be eligible. A site visit is scheduled for August 16, 2024, and proposals are due by August 19, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Additional Site Pictures.pdf | ||
| Payment Bond.pdf | ||
| Bid Bond.pdf | ||
| Performance Bond.pdf | ||
| Experience Information Form 6973GH24R00200.pdf | ||
| WD NewYork.pdf | ||
| 6973GH-24-R-00200.pdf | ||
| SOW Package PBG MALSR Site Improvements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
IN 4" RGS CONDUIT
6 AWG BARE COPPER
OF NO. 9 AWG & NO.
25 SHIELDED PAIR
IN 2" RGS CONDUIT
ELECTRICAL SERVICE
SHELTER
8'X16' MALSR
PULLBOX
UNDERGROUND
RACK DISCONNECT
MALSR SHELTER
ACCESS WELL
GROUND
CABLES IN CONDUIT
POWER AND CONTROL
UNDERGROUND MALSR
EXISTING BOLLARDS
GRAVEL UNDERLAIN BY FABRIC
CRUSHER RUN
6" OF COMPACTED
PERIMETER OF GRAVEL AREA
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DRAWING NO
DESIGNED
REVIEWED BY
/2
:1
:3
P
M lo tt e d b y S
R V
-C
-E
O
APPROVED
p g -2
-c
.d w
8 234567
IS
U
12/14/2023
MGR: ENGINEERING CENTER
JW
PLATTSBURGH
PBG-23005465-C001
MALSR
SITE IMPROVEMENTS
EXISTING SITE LAYOUT
OPS INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
N
T
IO
PLATTSBURGH INTERNATIONAL AIRPORT
DRAWING PRODUCED ON AEA RO CAD SYSTEM
PROJECT ENGINEER
23005465
NY
SCALE: 1" = 6'-0"
EXISTING SITE LAYOUT
C001
NOTES:
1) PROJECT IS LOCATED IN THE AIRFIELD OF PLATTSBURGH INTERNATIONAL AIRPORT . CONTRACTOR
MUST RECEIVE AIRFIELD DRIVING PERMISSIONS BEFORE WORK CAN BEGIN.
2) THE APPROACH LIGHTING SYSTEM (MALSR) IS A CRITICAL OPERATIONAL FACILITY. THE MALSR MUST
REMAIN OPERATIONAL THROUGHOUT THE ENTIRE PROJECT EXCEPT DURING A SCHEDULED CUT OVER.
ALL WORK MUST BE COORDINATED WITH THE FAA RESIDENT ENGINEER.
3) LOCATIONS OF EXISTING UTILITIES ARE APPROXIMATE. THE CONTRACTOR IS REQUIRED TO
CALL AND PERFORM A STATE OF NEW YORK DIG SAFE PERMIT.
4) THE CONTRACTOR MUST ALSO PERFORM A PRIVATE GROUND PENETRATING RADAR SURVEY PRIOR
TO ANY EXCAVATION. THE CONTRACTOR MUST COORDINATE THIS ACTIVITY WITH THE FAA SO
THE FAA CAN TURN ON POWER TO ASSIST WITH CABLE DETECTION.
5) THE CONTRACTOR IS NOT PERMITTED TO PERFORM LIVE ELECTRICAL WORK. THE CONTRACTOR MUST
COORDINATE WITH THE UTILITY TO REMOVE POWER AT THE TRANSFORMER DURING THE CUT OVER TO
NEW POWER.
6) PHASING PLAN:
6)1) THE CONTRACTOR MUST INSTALL A NEW LOW VOLTAGE DUCT BANK AND MAKE READY TO
INTERCEPT THE EXISTING LOW VOLTAGE CONDUITS AT THE TRANSFORMER AND SHELTER.
6)2) THE CONTRACTOR MUST INSTALL A NEW DISCONNECT RACK AND RACK FOUNDATION AS
SHOWN IN C003.
6)3) THE CONTRACTOR MUST HAVE ALL ELECTRICAL EQUIPMENT INSTALLED AS MUCH AS
POSSIBLE TO MINIMIZE THE TIME TO CUT OVER THE MALSR SHELTER TO NEW POWER. THE FAA WILL
WILL NOT APPROVE A CUT OVER UNTIL THE ELECTRICAL INSTALLATION HAS BEEN INSTALLED AS MUCH
POSSIBLE.
6)4) CUTTING OVER THE MALSR EQUIPMENT FROM EXISTING POWER TO NEW POWER IMPACTS THE
NATIONAL AIRSPACE AND NEEDS TO BE APPROVED AHEAD OF TIME. SCHEDULE MALSR EQUIPMENT
CUT OVER WITH FAA AT LEAST 10 CALENDAR DAYS IN ADVANCE. SUBMIT ON CUTOVER PROCECURES, TIMES AND DURATIONS.
6)5) WHEN APPROVED FOR A CUT OVER, INTERCEPT THE EXISTING LOW VOLTAGE CONDUITS AT THE
TRANSFORMER AND SHELTER STUB UPS , PULL NEW CONDUCTORS, TEST AND TERMINATE NEW
CONDUCTORS. FAA TO RESTORE POWER. CONTRACTOR MUST REMAIN ON SITE FOR AT LEAST TWO
HOURS TO ENSURE NEW MALSR SHELTER POWER IS OPERATING CORRECTLY WITH FAA. IF THE
POWER IS NOT OPERATING CORRECTLY, THE CONTRACTOR MUST REVERT BACK TO THE EXISTING
POWER SYSTEM.
6)6) DUE TO POTENTIAL RISK AND STAFFING LIMITS, CUT OVER MUST NOT TAKE PLACE ON A FRIDAY OR
WEEKEND.
6)7) CONTRACTOR MUST BACKFILL AND PROCEED TO COMPLETE THE SITE IMPROVEMENT
REQUIREMENTS AS SHOWN ON C002.
7) CONTRACTOR MUST DEMO THE EXISTING MALSR SHELTER DISCONNECT RACK AFTER THE CUT OVER
HAS BEEN FULLY COMPLETED. DEMO ANY EXISTING CONDUITS DOWN TO 2' BELOW GRADE. PROVIDE
LOCATION MEASUREMENTS OF THE EXISTING MALSR DISCONNECT RACK TO THE FAA FOR REDLINE
PURPOSES.
TO GLIDESLOPE
TRANSFORMER
MOUNTED
PAD
PAVED ACCESS ROAD
MALSR.
APPROXIMATELY 3' LOWER THAN
GRADE ELEVATION IS
EXISTING CULVERT AND SWALE
GRASS AREA
AIRFIELD
6' 0 6' 12'
SCALE: 1" = 6'
pbg-23005465-c001
2024-04-01T07:59:24-0400
HENRY B NEWCOMB
2024-04-01T07:53:21-0400
JOHN R WEST
DRAINAGE PIPE
4" PERFORATED
STONE
WRAPPED AROUND
FABRIC
GEOTEXTILE
4 OZ. NON WOVEN
AND DRAIN SLOPE
DEPTH TO MATCH GRADE COVER
GRAVEL IN GRAVEL AREA.
SEED IN GRASS AREA.
MIN 3" OF COVER
TO CULVERT/SWALE. SEE NOTE 1
EDGE OF GRAVEL AREA
INSTALL APPROXIMATELY 100' FROM
NEW FRENCH DRAIN.
SEE NOTE 7.
SEE NOTE 6
SEE NOTE 5
PERIMETER OF GRAVEL AREA
SEE NOTE 8
REPLACE BOLLARDS
RACK DISCONNECT
EXISTING MALSR SHELTER
DRAINAGE PIPE
4" PERFORATED
STONE
WRAPPED AROUND
FABRIC
GEOTEXTILE
4 OZ. NON WOVEN
AND DRAIN SLOPE
DEPTH TO MATCH GRADE COVER
GRAVEL IN GRAVEL AREA.
SEED IN GRASS AREA.
MIN 3" OF COVER
45 DEGREE TEE FITTINGS
90 FITTING
FOR CLEANOUT WITH
TYPICAL LOCATION
SEE NOTE 13
TEE FITTING
CLEANOUT WITH
13. TYPICAL
SEE NOTE
:4 lo tt e
4" DIA. STEEL CASING
FINAL GRADE
REGIONAL FROST DEPTH
REFLECTIVE RED MARKINGS
(POST GUARD CL1385D)
52" YELLOW PROTECTIVE SLEEVE
CONCRETE
SPACE WITH
AND ANNULAR
FILLED STEEL PIPE
PBG-23005465-C002
NEW DRAINAGE AND SITE WORK
EXCAVATION IS LOCATED AT A MARKED UTILITY, HAND DIG OR HYDROVAC TO EXPOSE THE UTILITY BEFORE EXCAVATING.
SPOTTER, UTILITY OR DITCHING BUCKET AND CUT IN MAX 6" LAYERS TO AVOID ANY UTILITIES. WHEN TRENCH OR
LIMIT TO CONTRACTOR EXCAVATION: WHEN USING AN EXCAVATOR FOR TRENCHES THE CONTRACTOR MUST HAVE A 14)
INSTALLED INSIDE THE GRAVEL AREA.
BEGINNING OF EACH DRAIN AND ONE IN EACH DRAIN BEFORE THE RUN TO THE CULVERT. ALL CLEANOUTS MUST BE
A RISER PIPE AND A 4" ROUND PVC CATCH BASIN GRATE (COLOR SHALL BE GREEN). QUANTITY MUST BE 7. INSTALL AT
CONTRACTOR MUST INSTALL FRENCH DRAIN CLEANOUTS WHICH CONSISTS OF A 90 DEG FITTING OR A TEE FITTING WITH 13)
REPRESENTATIVE.
EXACT LOCATION OF THE PULLBOX IS UNKNOWN. CONTRACTOR MAY DIVERT AROUND THE PULLBOX. REVIEW WITH FAA 12)
ENDS OF THE FRENCH DRAIN SHALL BE CAPPED.11)
RIGID HDPE (ASTM F810).
CONTRACTOR MUST SUBMIT ON FRENCH DRAIN. FRENCH DRAIN PIPE MUST BE RIGID, SCHEDULE 40 (ASTM D1784) OR 10)
NORTHERN HALF OF THE AIRFIELD.
CONTRACTOR MUST DISPOSE OF ANY SOIL SPOILS AT THE AIRPORT SPOILS AREA. SPOILS AREA IS LOCATED ON THE 9)
WITH FAA. ENSURE THE BOLLARDS ARE PLACED SO AS TO NOT INTERFERE WITH WALL MOUNT HVAC UNIT.
SHELTER. THE CONTRACTOR MUST INSTALL TWO NEW BOLLARDS AS SHOWN IN DETAIL C. REVIEW EXACT LOCATION
THE CONTRACTOR MUST REMOVE THE EXISTING TWO HEAVED BOLLARDS BETWEEN THE PAVED ACCESS ROAD AND THE 8)
CLEARANCE IN FRONT OF THE EXISTING TRANSFORMER.
FRONT OF THE EXISTING TRANSFORMER SO AS TO COMPLY WITH APPROXIMATELY 4' WIDE 10' LONG NEC WORKSPACE
ANCHOR MUST EXTEND INTO THE GROUND 10". CONTRACTOR MUST REMOVE A SECTION OF LANDSCAPE TIMBER IN
STAGGERED. THE CONTRACTOR MUST ANCHOR THE TIMBER TO EARTH WITH TIMBER SPIKES EVERY 4' (TWO PER PIECE).
AREA TO INCLUDE THE GRAVEL EXTENSION AREA. THE NEW TIMBERS MUST BE STACKED TWO SECTIONS HIGH AND
CONTRACTOR MUST INSTALL NEW PRESSURE TREATED 4X4 LANDSCAPE TIMBERS AT ALL PERIMETERS OF THE GRAVEL 7)
" CRUSHED STONE.4
REMOVING 6" OF GRASS AND SOIL AND INSTALLING NEW FABRIC AND 6" OF
THE CONTRACTOR MUST EXTEND THE LENGTH OF THE GRAVEL AREA BY 3 FT ON THE NORTHERN SIDE OF THE SITE BY 6)
" CRUSHED STONE THROUGHOUT THE GRAVEL AREA.4
THE CONTRACTOR MUST INSTALL NEW FABRIC AND 6" OF 5)
OF COMPACTED CRUSHER RUN GRAVEL.
CONTRACTOR MUST REMOVE THE EXISTING SITE GRADING INSIDE THE GRAVEL AREA WHICH CONSISTS OF FABRIC AND 6" 4)
AREA. CONTRACTOR MUST HYDROSEED AND SUBMIT ON AIRPORT APPROVED GRASS SEED MIX.
THE CONTRACTOR MUST RESTORE ANY GRASS AFTER TRENCHING FOR THE FRENCH DRAIN IN THE AIRFIELD GRASS 3)
NEW FRENCH DRAINS MUST BE LOCATED ON BOTH SIDES OF THE NEW DISCONNECT RACK. 2)
SITE LAYOUT FOR LOCATION.
THE DRAINAGE CULVERT/SWALE AT A MINIMUM OF 1% SLOPE. DRAINAGE CULVERT NOT SHOWN IN CLARITY. SEE C001
CONTRACTOR MUST INSTALL NEW FRENCH DRAINS AS SHOWN ON 1/C002. NEW FRENCH DRAINS MUST SLOPE TOWARDS 1)
SCALE: 1/4" = 1'-0"
NEW DRAINAGE AND SITE IMPROVEMENTS LAYOUT
C002
SCALE: NTS
FRENCH DRAIN
BOLLARD DETAIL
1 1 1 1
1 LOCATION OF NEW FRENCH DRAIN
TRANSFORMER
MOUNTED
EXISTING PAD
SHEET C003
RACK PAD. SEE
DISCONNECT
NEW
PULLBOX
4' 0 4' 8'
FRENCH DRAIN
pbg-23005465-c002
2024-04-01T07:59:37-0400
HENRY B NEWCOMB
2024-04-01T07:53:54-0400
JOHN R WEST
CONCRETE PAD
COUPLING (TYP)
EXPANSION
OF DISCONNECT
AT EDGE OF PAD IN FRONT
SLOPE TO AVOID DROP OFF
SLOPE NEW GRAVEL AT 2%
8 OZ FABRIC
WRAPPED IN
" CRUSHED STONE4
STRIPS
" CHAMFER 4
12" OC EW
DEFORMED REBAR
#4 GRADE 60
DOWELS (6 TOTAL)
DEFORMED REBAR
#4 GRADE 60
SEE E001 FOR DISCONNECT RACK LAYOUT
RACK AND CONDUITS NOT FULLY SHOWN FOR CLARITY
PAD. SEE DETAIL A AND B.
NEW DISCONNECT RACK AND
POWER SERVICE. SEE E001.
NEW DUCT BANK FOR SHELTER
RACK
PEDESTAL DISCONNECT
EXISTING WOOD EXISTING CONDUIT RUN
MOUNTED TRANSFORMER
EXISTING PAD
:5 lo tt e
DISCONNECTS
WIREWAY
TVSS
SIDE VIEW
PBG-23005465-C003
NEW DISCONNECT RACK PAD AND DUCT BANK
CONTRACTOR MUST DISPOSE OF ANY SOIL SPOILS AT THE AIRPORT SPOILS AREA. 9)
CONTRACTOR MUST SUBMIT ON GRAVEL AND CONCRETE MIX PRIOR TO INSTALLATION. 8)
PAD AND REVIEW WITH THE FAA.
CONTRACTOR SHALL FIELD DETERMINE THE EXACT LOCATION AND DIMENSIONS OF THE NEW DISCONNECT RACK 7)
EXCAVATING.
OR EXCAVATION IS LOCATED AT A MARKED UTILITY, HAND DIG OR HYDROVAC TO EXPOSE THE UTILITY BEFORE
HAVE A SPOTTER, UTILITY OR DITCHING BUCKET AND CUT IN MAX 6" LAYERS TO AVOID ANY UTILITIES. WHEN TRENCH
PAD. LIMIT TO CONTRACTOR EXCAVATION: WHEN USING AN EXCAVATOR FOR TRENCHES THE CONTRACTOR MUST
DUE TO OPERATIONAL RISK THE CONTRACTOR MUST USE A HYDROVAC TO EXCAVATE FOR THE DISCONNECT RACK 6)
INSTALL NEW REBAR MAT AND DOWELS AS SHOWN IN DETAIL A.5)
" CHAMFER AT ALL CORNERS. 4
WITH A
ENTRAINMENT, WELL GRADED AGGREGATE WITH MAX 3/4", SLUMP OF 4". FINISH MUST BE MEDIUM BROOM FINISH
CONCRETE MIX FOR NEW DISCONNECT RACK MUST BE MINIMUM 4,000 PSI COMPRESSIVE STRENGTH, 5-7% AIR 4)
COMPACT STONE EVERY 4" WITH VIBRATORY COMPACTOR PLATE OR 8" WITH HEAVY COMPACTION EQUIPMENT.3)
STONE WRAPPED IN 8 OZ FABRIC.
" CRUSHED 4
CONTRACTOR MUST REMOVE FROST SUSCEPTIBLE SOIL DOWN TO FROST DEPTH AND PLACE NEW 2)
CONTRACTOR MUST INSTALL NEW DISCONNECT RACK PAD AS SHOWN ON DETAIL A AND B.1)
DISCONNECT RACK PAD ELEVATION
C003
DISCONNECT RACK PAD SIDE ELEVATION
SCALE: 1/4" = 1-0"
SITE LAYOUT
4' 0 4' 8' pbg-23005465-c003
2024-04-01T07:59:51-0400
HENRY B NEWCOMB
2024-04-01T07:54:08-0400
JOHN R WEST
240200K200FRN6F335 MALSR MAIN DS
240 200K200FRN6F235 MALSR MAIN SERVICE DS
240200K100FRN6F135 MALSR SPD DS
(V)
OPERATION VOLTAGE
INTERRUPTING CAP.RATING (A)MODELQTYDESIGNATIONLOCATION
FUSE SCHEDULE
1" PVC#2 GNDCOUNTERPOISESPDF
COATED GRSC
NEW AND EXISTING 2 1/2" PVC
(3) #4/0 THWN & (1) #6 GND 35 MALSR MAIN DS35 MALSR MAIN SERVICE DSE
2 1/2" GRS(3) #4/0 THWN, (1) #6 GND35 MALSR MAIN SERVICE DSMULTI-TAPD
2" GRS(2) #4 THWN & (1) #4 GND CABLE THWNSPD 35 MALSRSPD 35 MALSR DSC
2" GRS(3) #1, THWN, (1) #6 GNDSPD 35 MALSR DSMULTI-TAPB
2 1/2 " PVC COATED GRS THWN, (1) #6 GND0
(3) #MULTI-TAPT-35 MALSR SDA
CONDUITCONDUCTORS WITH GROUNDTOFROM
TAG
CABLE
FEEDER SCHEDULE
200A, 240V, 2 POLE, FUSED DISCONNECT, NEMA 1, HEAVY DUTY, FUSED AT 100A, USE 200A TO 100A FUSE CLIP REDUCERS16
REUSE EXISTING 200A STAINLESS STEEL NEMA 4X15
SPD, RAYVOSS, 80MM STRIKESORB, #120-2S-M1-3-06-A-SS14
STAINLESS STEEL, NEMA 4X, 100 AMP DISCONNECT13
HINGE CLAMP STYLE OPENING
6"X6"X36" WIRE WAY WITH CONDENSATE DRAIN, NEMA 4X, STAINLESS STEEL, WITH BURNDY UNITAPS OR APPROVED EQUAL CONTINUOUS
INSULATED MULTI-TAP CONNECTORS, BURNDY OR APPROVED EQUAL. ENSURE CONNECTORS ARE FULLY INSULATED41
QTYEQPT
EQUIPMENT SCHEDULE
REQUIRED.
SWITCHES AS
PROVIDE ADDITIONAL
SWITCH ARRANGEMENT
TYPICAL SERVICE
CONDUIT
1" PVC
TO BLDG
"CONDUIT2
2 CONDUIT
1" PVC
(TYP)
POST W/CAP
2" GALV. RACK
CHANNEL
STAINLESS STEEL
FROM XFMR
" CONDUIT 2
#6 AWG (TYP)
BUT NO LESS THAN
TABLE 250.66
GEC SIZE IAW NEC
#2 GND
THE APPLICATION
UL LISTED FOR
GROUND CLAMP
PIPE U-BOLT
GROUND ROD
WELDED TO EES
EXOTHERMICALLY
#4/0 BARE CU
CONDUCTOR (TYP)
OR EQUAL DOWN
THOMPSON NO.28R
THOMPSON NO.28R
GROUND ROD
WELDED TO EES
EXOTHERMICALLY
#4/0 BARE CU
WIREWAY
COUPLINGS
EXPANSION
COUNTERPOISE. NOT SHOWN FOR CLARITY
1" PVC WITH #2 GND FROM SPD TO
lo tt e
-e
SP1-RW15 (UTILITY) AREA
POLE
UTILITY
SINGLE PHASE
12,470GY/7200
NYSEG
SA =SURGE ARRESTORTOP
POLE
CUTOUT
FUSE
AREA
35 MALSR SHELTER
LV-240/120
HV-12470GY/7200
50 KVA 1PH
STEP DOWN XFMR
SW.1
T-35 MALSR SD
35 MALSR
2P
240V
100A
200A
SPD-35 MALSR
WIRE-WAY
2B D
SPD DS
MAIN DS
20A,1P
35 MALSR PANEL
20A,2P
F1 F2
F3
MAIN SERVICE DS
CB1
LIGHTS
CB3
SPARE
CB5
RECEPTACLES
CB7
CB9
CB2,4
HVAC UNIT
CB6
CB8 GFCI
CB12,14
100A,2P
TVSS
FOR GS AND ASOS
TO TRANSFORMER
TAP
MTC
FRONT VIEW
MAX 3"
SPD
OR EQUAL (TYP)
611T MOUNTING BASE NO.
THOMPSON NO.572BT AND
AIR TERMINAL 1/2" X 24"
DOWN CONDUCTOR FASTENED TO POST AT INTERVALS NOT EXCEEDING 3'-0"
EXOTHERMIC WELD TO #4/0 AWG COPPER CONDUCTOR NOT LESS THAN 1'-6" ABOVE GROUND LEVEL (TYP)
TAP
COPPER C-TYPE COMPRESSION CONNECTOR
BELOW PAD
FILL
SUSCEPTIBLE
FROST
STONE NON
" CRUSHED 4
GROUND ROD (TYPICAL)
3/4" X 10' COPPER CLAD
4/0 BARE COPPER EES
DISCONNECT SWITCHES
WIREWAY NOT SHOWN
SPD
#2 CONDUCTOR SPD TO GDN
#4/0 GRD CONDUCTOR
(TYPICAL)
EXOTHERMIC WELD
#4/0 GRD CONDUCTOR
(TYPICAL)
RACK POST
GROUNDING ELECTRODE CONDUCTOR
2" PVC
COATED
RGS
BACKFILL
SEE NOTE 9
WARNING TAPE
SEE NOTE 10
NEW FABRIC AND
6" OF STONE
SEE C002
PBG-23005465-E001
DISCONNECT RACK LAYOUT AND GROUNDING
-e
DISCONNECT RACK LAYOUT AND GROUNDING
E001
ONE LINE DRAWING AND ELECTRICAL SCHEDULE
DISCONNECT RACK LAYOUT AND GROUNDING PLAN VIEW
SCALE: NTSE001
INDICATES NEW
THE ELECTRODE GROUNDING CONDUCTOR (REFER TO 19F, AND FIGURE I IN SPECIFICATIONS).
ALL ELECTRICAL CONDUIT ENDS MUST HAVE AN INSULATED AND GROUNDING BUSHING. BUSHING TO BE GROUNDED WITH 15)
ALL UNISTRUT ENDS MUST HAVE A RUBBER END CAP INSTALLED.14)
BONDED OR THE CONTRACTOR MUST INSTALL A BONDING JUMPER IN ORDER TO MAINTAIN ELECTRICAL CONTINUITY.
CONDUIT MATERIAL (RIGID STEEL CONDUIT OR PVC). RIGID STEEL CONDUIT EXPANSION \COUPLINGS MUST BE INTERNALLY
ALL CONDUITS ON THE DISCONNECT RACK MUST HAVE AN EXPANSION COUPLING. EXPANSION COUPLING MUST MATCH 13)
(4 TOTAL).
CONTRACTOR MUST PROVIDE AND INSTALL INLINE GROUNDED EXPANSION COUPLINGS AT THE END OF EACH CONDUIT RUN 12)
REDLINES.
CONTRACTOR MUST RECORD AND PROVIDE EXACT DIMENSIONS OF THE NEW DUCT BANK FOR THE FAA TO INCLUDE IN 11)
LETTERS MUST BE BLACK. TAPE WIDTH MUST BE 6". PLACE TAPE 6" BELOW TOP OF GRADE.
BURIED ELECTRIC LINE BELOW" AND BE DETECTABLE, ALUMINUM BACKED 0.005" THICK WITH RED BACKGROUND COLOR.
CONTRACTOR MUST INSTALL NEW ELECTRICAL WARNING TAPE FOR THE NEW DUCT BANK. TAPE MUST READ "CAUTION 10)
WITH HEAVY DUTY COMPACTION EQUIPMENT.
SITE GRADING). CONTRACTOR MUST COMPACT BACKFILL EVERY 4" WITH VIBRATORY PLATE COMPACTOR OR EVERY 8"
EXISTING MATERIAL ON SITE IS SUITABLE FOR BACKFILL FOR THE LOW VOLTAGE DUCT BANK EXCEPT FOR THE TOP 6" (NEW 9)
PLACED 2-4' FROM EDGE OF PAD.
GRND CONDUCTOR SHALL BE 0
THE CONTRACTOR MUST PROVIDE AND INSTALL ALL GROUNDING SHOWN IN DETAIL B. THE 8)
CONTRACTOR MUST DUCT SEAL ALL CONDUITS THAT LEAD INTO THE GROUND.7)
HUB FITTINGS.
CONDUIT PENETRATIONS THROUGH THE TOPS OF EXTERIOR BOXES/DISCONNECTS MUST BE MADE WITH WEATHERPROOF 6)
PROTECTION AND GROUNDING MUST BE IN ACCORDANCE WITH 19F.
PROVIDE AND INSTALL ALL LIGHTNING PROTECTION AND GROUNDING AS SHOWN IN DETAIL A AND B. LIGHTNING 5)
DETERMINE EXACT DIMENSIONS.
THE CONTRACTOR MUST INSTALL A NEW DISCONNECT RACK AS SHOWN IN A/C001 AND A/E001. CONTRACTOR MUST FIELD 4)
WHICH INCLUDES INSULATION RESISTANCE TESTING AND CONTINUITY TESTING.
PRIOR TO ENERGIZING, THE CONTRACTOR MUST TEST THE NEW CONDUCTORS IN ACCORDANCE WITH 19F AND 1391E 3)
ALL CONDUCTORS MUST BE COLOR CODED.2)
ELECTRICAL EQUIPMENT AS SHOWN AND LISTED IN THE SCHEDULES. ALL EQUIPMENT CIRCLED IN 1/E001 IS NEW.
INFORMATION. EXISTING POWER MUST REMAIN OPERATIONAL UNTIL A CUT OVER IS COMPLETED. INSTALL NEW
CONTRACTOR MUST INSTALL NEW POWER SERVICE TO THE MALSR SHELTER. REFER TO PHASING PLAN FOR ASSOCIATED 1)
LOW VOLTAGE DUCTBANK
pbg-23005465-e001
2024-04-01T08:00:03-0400
HENRY B NEWCOMB
2024-04-01T07:54:54-0400
JOHN R WEST
:2 lo tt e
-g
PBG-23005465-G001
COVER SHEET
-g
PLATTSBURGH, NEW YORK
RUNWAY 35
PBG MALSR
T OF TRANSPO
T A
IC
OF
STATES
IT
P A
TM
EN
AVIA
LA
TRAT
SI
NI
DRAWING NUMBER DRAWING TITLE
PBG-23005465-G001 COVER SHEET AND INDEX OF DRAWINGS
PBG-23005465-C001 EXISTING SITE LAYOUT
PBG-23005465-C002 NEW DRAINAGE AND SITE WORK
PBG-23005465-C003 NEW DISCONNECT RACK PAD AND DUCT BANK
PBG-23005465-E001 DISCONNECT RACK LAYOUT AND GROUNDING
INDEX OF DRAWINGS
pbg-23005465-g001
2024-04-01T07:59:05-0400
HENRY B NEWCOMB
2024-04-01T07:53:08-0400
JOHN R WEST
File details come from the government source that posted it. Updated .