SOW Outdoor Electronic Sign.docx

DOCX document 36 KB Posted

Attached to
Outdoor Electric Sign
Solicitation number
Not on record
Issued by

About this file

This Statement of Work (SOW) details the procurement, delivery, and installation of an outdoor electronic sign for the 950th Spectrum Warfare Group at Robins Air Force Base in Georgia. The project requires a 6'x 11' brick sign with two shields and an 8'x 4' LED electronic sign, to be completed within 60 days of contract award. The contractor is responsible for design, fabrication, delivery, and professional installation, ensuring weather-resistant materials and unit-specific branding meet military standards.

Key requirements include comprehensive environmental compliance, strict security protocols, and adherence to base regulations. The contractor must provide a 30-day warranty covering installation-related damages, maintain a clean work site, and coordinate closely with base security personnel. All contractor personnel must be U.S. citizens with proper identification, subject to background checks and base access restrictions. Work is limited to normal duty hours (7:00 AM to 5:30 PM, Monday through Friday), excluding government holidays, with the government providing utilities and emergency services.

View the file

Other files

File Type Posted
Outdoor Signage 1.docx DOCX document
Clauses and Provisions_FA850125Q0033.pdf PDF
Outdoor Electric Signs Combined Synopsis Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

F1T0BK4263A001

950TH SPECTRUM WARFARE GROUP

OUTDOOR ELECTRONIC SIGN

BUILDING 2051N

ROBINS AFB, GA

1. SCOPE OF WORK:

The scope of work involves the procurement, delivery and installation of an outdoor electronic sign. This task requires sourcing high-quality, durable products that meet military standards and specifications. Signage must be fabricated from weather-resistant materials and include unit-specific branding and informational content as required. The contractor is responsible for ensuring that all items are produced to exact specifications, delivered on schedule, and installed. Coordination with military representatives for design approval and compliance with relevant regulations is essential. Period of performance is 60 days from date of award.

SPECIFIC TASKS:

Design, Deliver and Install:

1. 1- LED Outdoor Electronic Sign w/ Brick with 2 Shields

2. ACCESSORIES AND INCIDENTALS

Contractor shall provide all accessories and incidentals necessary to deliver and install signage.

3. WARRANTIES

The contractor shall ensure that all items are delivered and installed with the utmost care and professionalism. Warranty covers any damages directly resulting from the installation process. Should any property incur damage due to contractor handling, it will be addressed promptly and arrange for necessary repairs or compensation. Warranty should be valid for 30 days from the completion of the delivery and installation service.

4. MAINTENANCE/SERVICE: N/A

5. SUBMITTALS: N/A

6. QUALITY ASSURANCE

The government will inspect all work performed by the contractor. Work performance shall be deemed satisfactory and acceptable to the government when the Contracting Officer Representative (COR) declares the project satisfactory. The government will document all inspections. All contracting actions and/or correspondence should be forwarded to the Contracting Officer.

7. ENVIROMENTAL REQUIREMENTS

The contractor shall perform all work in accordance with federal, state, and local environmental regulations (including maintenance of Materials Safety Data Sheets (MSDS’s) IAW EPA regulations and criteria so as to minimize pollution, exploitation, and degradation of natural resources. The contractor shall use non-hazardous materials when possible. The contractor shall perform all work in accordance with industrial, environmental, and OSHA standards.

8. CLEAN UP

· The contractor shall furnish and maintain barricades, warning signs, and waste containers on the government job site and ensure equipment is secured at the end of each workday.

· Ensure entire project area is left in a vacuum-clean condition.

· All packing, wrapping and packaging materials shall also be removed from the project area. All debris, refuse and trash shall be removed from the site.

· The contractor shall ensure a clean job site at end of each workday.

· Upon completion the buildings shall be returned to a final clean professional appearance.

9. PROJECT MATERIALS PROTECTION

Do not use protective materials that will leave any type of residual print, outline or imaging.

10. MAINTENANCE INSTRUCTIONS: N/A

11. HOURS OF OPERATION

Normal duty hours are from 7:00 Am to 5:30 PM, Monday through Friday, except on government holidays. Contractor should coordinate work with 950 SWG Security Officer (POC will be provided at the time of award)

Government Holidays:

New Year’s Day: 1 January Martin Luther King, Jr.’s Birthday: Third Monday in January President’s Day: Third Monday in February Memorial Day: Last Monday in May Independence Day: 4 July Labor Day: First Monday in September Columbus Day: First Monday in October Veteran’s Day: 11 November Thanksgiving Day: Third Thursday in November Christmas Day: 25 December

12. DAMAGES

The contractor shall take precautions to prevent damage to government property. The contractor shall repair or replace damaged items at no additional cost to the government.

13. INSPECTION AND ACCEPTANCE

A designated representative shall perform inspection and acceptance of all work at regular intervals as required and upon final completion of this project. All discrepancies identified during inspections shall be corrected prior to final payment.

14. GOVERNMENT FURNISHED SERVICES: The Government shall provide utilities (water and electricity) and emergency, fire and Security Police response.

15. TRAFFIC REGULATIONS: Contractor employees shall comply with all base traffic regulations, and are subject to random vehicle speed control checks. Contractor’s personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of cell phones, except hands-free phones, is prohibited while driving on the military installation.

16. SECURITY REQUIREMENTS: The Government reserves the right to deny access at any time, for any reason.

· Contractor and all associated sub-contractor’s employees shall provide all information required for background checks to meet installation access requirements to be accomplished by 78th Air Base Wing Security Forces Pass and Identification (ID) Office. Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, United States Air Force (USAF), and local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

· The Contractor will coordinate with the Authorized Government Representative (AGR) on all security issues and to gain access to the base and all areas necessary to execute this service.

· The Contractor shall ensure that all employees, suppliers, and subcontractors and their employees comply with established security procedures for entering the installation and its facilities, including special security procedures for entry to restricted or controlled areas.

· All prospective contractors MUST be U.S. citizens. All prospective contractors MUST have at least one form of US government issued photo identification (driver’s license, US passport, US work visa, etc.) for entry to the installation. Security Forces (SF) will review any questionable identification documents for determination as to whether or not said identification is authorized for access to the installation.

· All personnel, vehicles and property are subject to search upon entering or exiting the installation, or at any point while on the installation. Any vehicles or personnel found in possession of prohibited items will be removed, and/or barred, from the installation and released to the appropriate civil authorities.

· The Government will not be held liable for any delays or breach of contract caused by refusal of the Security Forces to allow entry.

· Photography and recording is not allowed except for official use and by permit only. Photographs will be reviewed by the Special Security Officer to ensure sensitive and/or classified information is not revealed.

· The Contractor shall not post to company websites, publications, newsletters or other media any images, data or information that reveal sensitive government operations, personnel, equipment, and/or classified or controlled unclassified information. When in doubt, company press releases related to this contract should be coordinated through the AGR as applicable.

· Because observation of events, operations, physical changes, etc. may reveal National Security Information, specific restrictions are needed to preclude unintentional release of this information to unauthorized parties. (Unauthorized disclosure and transfer of National Security Information is punishable under 18 USC § 793.) Therefore, contractor personnel shall not disclose to unauthorized third parties, post to unofficial sites (including Social Networking sites) any images, data or information, or observed events that reveal sensitive government operations, personnel, equipment, including, but not limited to:

· Tactics, techniques and procedures, work schedules, increases, change, or decreases in work/deployment frequency of government personnel or vehicles; specialized equipment orders, deliveries, shipments, etc. Unauthorized disclosures and attempts to solicit this type of information by unauthorized third parties or others.

File details come from the government source that posted it. Updated .