This is a Performance Work Statement for grounds maintenance services at the USDA Forest Service Harpers Ferry Job Corps Center in Harpers Ferry, West Virginia. The performance period typically runs from April 1st through September 30th annually.
The contractor must provide comprehensive grounds maintenance including weekly mowing of approximately 28 acres of general grounds, 4 acres of government housing, and 6 acres of ball fields, with grass clippings removed or mulched as needed. An additional 5 acres of woods/triangle area must be mowed at least seven times per year. All grounds must maintain a well-manicured appearance at all times, with a maintained path from dormitory areas to ball fields. Weekly edging services are required to remove grass and weeds from sidewalks and paved areas, with optional EPA-approved herbicide applications at contractor discretion. Concurrent with mowing, the contractor must trim grass and weeds around trees, shrubs, buildings, fences, poles, posts, fire hydrants, and other fixed obstacles, with any trimming damage to vegetation repaired by the contractor. Seasonal services include pruning low-lying branches up to six feet from tree bases, with clippings gathered and disposed of at established collection points on center.
The contractor must develop and maintain a quality control program with no allowable deviations from stated performance standards. Quality assurance will be conducted through periodic inspections. Non-compliance results in escalating penalties: 5% payment reduction for the first month of non-compliance, 10% for the second month, and 10% for the third month, with a cure notice and potential termination for cause following the third penalty. Normal operating hours are Monday through Friday, 7:30 AM to 4:30 PM, with primary work scheduled Monday 7:30 AM through Tuesday 4:30 PM. The contractor must designate a project manager with full contract authority for technical matters and ensure all personnel complete SF85 background investigation forms within five days of contract award. Security requirements include maintaining locked outside doors during work and reporting safety and fire prevention violations to the Contracting Officer's Representative.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
GROUNDS MAINTENANCE SERVICES
USDA Forest Service Harpers Ferry Job Corps Center
16 April 2026
STATEMENT OF WORK
1. DESCRIPTION OF SERVICES. The contractor shall provide all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed at USDA Forest Service, Harpers Ferry Job Corps Center, 146 Buffalo Drive, Harpers Ferry WV, 25425, in a manner that will maintain healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance. Performance period will typically begin 1st April and terminate 30th Sept of the performance year.
1.1. MAINTAIN GROUNDS.
1.1.1. Mow Grounds. Grass shall be cut to approximately 28 acres weekly. Grass clippings shall be removed or mulched when visible after mowing. All grounds shall look well manicured at all times. A path will be maintained from the dorm areas to the ball fields.
1.1.2 Mow Government Housing. Grass shall be cut on approximately 4 acres (174,240 square feet) of ground weekly. Grass clippings shall be removed or mulched when visible after mowing.
All grounds shall look well manicured at all times.
1.1.3 Mow Ball Fields. Grass shall be cut on approximately 6 acres (281,360 square feet) of grounds weekly. Grass clippings shall be removed or mulched when visible after mowing. All grounds shall look well manicured at all times.
1.1.4 Mow Woods/Triangle. Grass shall be cut on approximately 5 acres (217,800 square feet) of ground at least seven times per year.
1.1.5. Edging. Grass and/or weeds will be removed from sidewalks and paved areas at least once weekly. Contractor may apply an EPA approved weed killer to prevent future growth. The number of applications will vary and will be at contractor discretion.
1.1.6. Trimming. Grass and weeds shall be trimmed around trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lot bumper blocks, boulders, and other fixed obstacles.
Trimming height shall match surrounding area grass heights. This task involves all grounds. All areas shall be trimmed concurrently with mowing. Damage to trees and shrubs from trimming shall be repaired by the contractor.
1.2. Seasonal Services Required
1.2. Trim Low Lying Branches. Low lying branches may be pruned up to six feet from the base of the tree. Clippings will be gathered and may be disposed of on center at established collection points.
2. SERVICE DELIVERY SUMMARY. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective SOW Para Performance Threshold Maintain Grounds.
All grounds shall look well manicured at all times.
1.1 No allowable deviation.
Seasonal Services Shrubs/hedges flourish, are pruned and trimmed properly and in a timely manner.
1.2. No allowable deviation
3. PERFORMANCE REQUIREMENTS SUMMARY
Required Service Standard
(Referencing
SOW)
Allowable Deviation
Method of Quality
Assurance
Deductions
1.1 Maintain Grounds
Maintain Grounds to meet standards in Column 1 of SDS.
No allowable deviation.
Periodic Inspections
Three (3) of more issuances of Orders of Non-Compliance that are not withdrawn by the COR for the rating period mandates a first step penalty of a 5% reduction in the contractor’s paid premium for the first month, 10% for the second month and 10% for the third month.
After the third penalty, the Contractor will be issued a Cure Notice and face a possible Termination for Causes per FAR 52.212-2(m).
1.2 Seasonal Services
Pruning of low branches to meet standards in Column 1 of SDS.
No allowable deviation.
Periodic Inspections
4. GENERAL INFORMATION.
4.1. QUALITY CONTROL. The contractor shall develop, submit for contracting officer approval, and maintain a quality program to ensure grounds maintenance services are performed in accordance with the SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the contractor shall develop quality control procedures addressing the areas identified in paragraph 2, Service Delivery Summary.
4.2. QUALITY ASSURANCE. The Government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan.
4.3. GOVERNMENT REMEDIES. The contracting officer shall follow FAR 52.212.4, Contract Terms and Conditions-Commercial Items (Feb 2007), for contractor’s failure to perform satisfactory services or failure to correct non-conforming services.
4.4. HOURS OF OPERATION. Normal hours of operation are Monday thru Friday, 7:30am to 4:30pm. Primary hours to fulfill this SOW will be Monday, 7:30am thru Tuesday, 4:30pm.
Contractor will inform the Contracting Officer’s Representative (COR) of any anticipated delays in fulfilling this SOW. Contractor will make contact with the COR on a weekly basis to determine if services are required.
4.5. SECURITY REQUIREMENTS.
4.5.1. LOCKS/KEYS. All outside doors shall remain locked while the contractor/contractor employees perform work.
4.5.2. SAFETY/FIRE PREVENTION. Safety and fire prevention shall be exercised by the contractor/contractor employees at all times. Contractor shall report all violations of such to the COR and, if possible, correct these violations.
4.5.3. BACKGROUND INVESTIGATIONS. All contractor personnel assigned to work on this contract will be subject to routine background investigations. The Contractor shall conduct and make available upon request, security background checks on these employees. Contractor is responsible for having each employee complete an SF85, Questionnaire for Non-Sensitive Positions, and for ensuring the completed forms are submitted to the COR within five (5) days of contract award. The contractor shall not employ or subcontract with persons for work on this contract, if such persons are identified by the COR as a potential threat to the health, safety, security, and/or general well-being of other personnel or the operational mission.
4.6. SPECIAL QUALIFICATIONS.
4.6.1. PROJECT MANAGER. The contract shall designate in writing to the CO, the program manager (PM) and an alternate for this contract. The PM shall have full contract authority to act for the Contractor on technical matters relating to daily operation of this contract.