The document is a Statement of Objectives (SOO) for a Morrell Operations Center (MOC) Cubicle Renovation project dated 8 Sep 25, detailing comprehensive renovation requirements for multiple rooms across 10 different room spaces (110, 116, 117, 118, 119, 121, 127, 131, 173, and 191). The renovation involves replacing existing cubicles, installing demountable floor-to-ceiling walls, upgrading electrical and LAN infrastructure, and providing new furniture including electric height-adjustable desks, task chairs, storage cabinets, conference room equipment, and specialized workspace configurations for supervisors, technicians, and support staff.
The project has critical operational constraints, including being a restricted area requiring security escorts, 8-hour work days, and carefully orchestrated construction phases to maintain continuous Space Launch operations. The vendor must provide a certified electrician to disconnect and reconnect power, measure and integrate room drawings, and coordinate with the government for LAN line installations. The renovation will be executed in three sequential phases, starting with rooms 118, 119, 173, 191, followed by rooms 116, 117, 110, 131, and concluding with rooms 121 and 127. Each phase must be fully operational before the next can begin, with the customer facilitating preparatory work to expedite installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question and Answer ROPS.pdf | ||
| FA252125QB181 MOC Cubicle CSS.pdf | ||
| MOC Combined cubicle project drawings 8 Sep 25.pdf | ||
| Badge Request 45 SFS Form V14.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES
MOC CUBICLE RENOVATION 8 Sep 25
OVERVIEW
Replace room cubicles and add demountable floor to ceiling walls as per the room diagrams dated 17 July 25. Rooms affected are 110, 116, 117, 118, 119, 121, 127, 131 173, and 191.
Vendor to provide labor to demo existing workstations, cabinets and furniture and dispose of appropriately. Vendor will procure new desired furniture and walls and assemble them to the approved floor plan. Vendor will also provide certified electricians to disconnect power to existing workstations prior to demo and rewire/utilize the old circuits and breakers as needed to reconnect to the new furniture/wall configuration. All power is run above the ceiling (except 191 and 173) and drops down into the cubicles via power poles. Vendor will coordinate with Govt during process for their access to install new LAN cabling though the new furniture frames.
Ceiling height in rooms 173 and 191 is approx. 12’. All other rooms height is approx 9’.
Refer to drawings with the below descriptions.
All measurements shown are for planning purposes and must be remeasured and adjusted by the vendor for final design drawings.
NEW ROOM CUBICLE DESCRIPTIONS
110 -
1. L-shaped front counter with overhead cabinets and LED under bin lights,
2. approx. 12 x 6. 4 top counter mounted multiple outlet strips with 4+ 120v power plugs and additional USB A and C connectors spaced out across the counter area. 4 independent monitor arms for 20 lb monitor.
3. Demountable clear glass wall approx. 10’ 11” W.
4. lockable solid frame door with frosted glass insert separating the front counter from the 2 new rear cubicles
5. Both rear cubicles require lockable overhead storage over the return areas. with LED under bin lights,
6. Both cubicles have under return pencil drawer, D/D/F pedestal storage and a 2 drawer under counter 30” - 36” wide cabinet.
7. Both cubicles have extended 6’ W 30” deep electric stand-sit desks w/ 2 independent monitor arms for 20 lb monitors .
8. All cubicle walls will have at least two dual 120V power outlets installed.
9. Rear cubicle has extended 5’ counter on back wall with an additional 2 drawer 36” W cabinet under counter cabinet and overhead storage with LED lighting. .
10. White board panel on inside and outside of upper cubicle wing wall .
11. Provide 4 task chairs to be tilt, angle and height adjustable for the seat and back. Include back support, adjustable posture controls and carpet casters. Arm height adjustment required.
Provide 3 padded side chairs.
116 - Per attached design.
Use OFS Staks as the basis of design or equivalent for this room only.
Requires 24 Lockers w/ lockable doors.
Workspace for 16 technicians
1. 6’ wide x 30” deep table worksurface that is electric height adjustable with under table vertical and horizontal wire management. 30”L x 24”D independent return.
2. Cubicle enclosure walls to be 42”H and consist of one main lower fabric panel with one upper accent fabric panel. Colors and material to be selected prior to ordering. All walls will include an additional 11” frosted privacy glass screen topper.
3. Walls will include at least two standard power outlet per interior side, front and rear wall and one base opening for LAN per side and front interior wall.
4. Three worksurface mounted power plug modules with at least 4 - 110v and 2 USB (A and C) outlets each will be provided to plug into base power.
5. Two surface mounted extendable monitor arms supporting up to approx. 20 lb monitor.
6. Provide new task chair for each workstation. Each to be tilt, angle and height adjustable for the seat and back. Include back support, adjustable posture controls and carpet casters.
Arm height adjustment required.
Workspace for 6 supervisors
1. 6’ wide x 30” deep table worksurface that is electric height adjustable with under table vertical and horizontal wire management. 36”L x 24”D independent return.
2. Desk end cap storage module .
3. Cubicle enclosure walls to be 42”H and consist of one main lower fabric panel with one upper accent fabric panel. Colors and material to be selected prior to ordering. All walls will include an additional 11” frosted privacy glass screen topper.
4. Walls will include at least two standard power outlet per interior side, front and rear wall and one base opening for LAN per side and front interior wall.
5. Three worksurface mounted power plug modules with at least 4 - 110v and 2 USB (A and C) outlets each will be provided to plug into base power.
6. Two surface mounted extendable monitor arms supporting up to approx. 20 lb monitor.
7. Provide new task chair for each workstation. Each to be tilt, angle and height adjustable
a. Arm height adjustment required.
Conf room 1
1. Approx. 12 x 12
2. Glass walls on front and sides with privacy frosted band across middle area, open slatted roof
3. Rear wall solid capable of supporting a 84” monitor
4. Power in center of walls. Lan outlet on rear wall.
5. Table and chairs for 5 with 2 side chairs
Conf room 2
1. Approx. 8 x 8 Privacy booth w/ 4 walls
2. Rear wall, solid, capable of supporting a 70” monitor
3. Power in center of rear wall with a LAN outlet.
4. Table for 4 with padded bench seats
Conf room 3
1. Floor to ceiling glass walls
2. Approx. 12’ x 14’
3. Table and chairs for 7 persons with 3 side chairs.
4. Rear wall, solid, capable of supporting a 84” monitor
5. Power in center of rear wall with a LAN outlet.
Break area
1. 10’ counter with 4 dedicated circuits above the counter level.
2. Under counter storage: mix of doors and drawers. Overhead cabinets along the whole length
3. 8’(approx.) padded booth with table for up to 6 people
4. 2 refrigerator circuits
STORAGE
1. ST1 and ST2 8’ tall. One with no shelves and one with 5 shelves.
2. ST3 6’ tall with 5 shelves
3. ST4 6’ tall with 5 shelves
TEAMING AREA
1. Sectional sofa with 3 small tables and 2 ottomans
2. ~10’ - 12’ wide x 6’ tall storage cabinet behind sectional. Top 12’ open with cubes.
3. Tall nesting table with 4 barstool style chairs
4. Loveseat and chair with table area
117 -
1. Requires floor to ceiling demountable walls to divide room into two rooms for Commander and OPS officer and a “secretary” area.
2. Extra acoustic attenuation in walls required. All walls to be solid fabric covered material.
3. Solid frame doors with frosted glass inserts.
4. 2 evenly spaced dual power outlets and 1 LAN punch out required on North walls. 3 evenly spaced dual power outlets and 2 LAN punch outs required on center wall.
5. The gaps between the pillars and the exterior glass walls require hand made wall/acoustic inserts as they are currently have a 4 – 6” open air gap.
6. Room 117.4 requires a demountable wall with swing door dividing the room with a 6 foot counter, overhead storage with LED lights and two 36”undercounter cabinets: one double door and one 2 drawer.
7. Room 117.4 demountable wall requires 2 single power outlets on each side of the wall.
and one dual outlet at the counter level.
118 – One supervisor office
1. 9’ W x 12’ L Supervisor demountable office with clear glass swing door. Solid fabric covered side and rear walls. Clear glass front wall.
2. Two quad power outlets and one LAN punchout in each interior side and rear wall. One dual power outlet on front wall interior and exterior.
3. U shaped work area with 6’ wide x 30” deep electric height adjustable desk worksurface that with under table vertical and horizontal wire management. Front peninsula desk with under-surface pencil drawer. Rear wall fixed return
4. Two surface mounted extendable monitor arms supporting up to approx. 20 lb monitor
5. 3 top surface mounted multiple outlet strips with 4+ 120v power plugs and additional
USB A and C connectors spaced out across the counter area.
6. A box/file mobile pedestal with pencil tray unique locks. 2 keys for each file and 2 master keys(overall) to be provided.
7. 36” W under counter 2 drawer storage cabinet for rear wall.
8. Overhead storage cabinets on rear wall with LED lights.
9. Full size tower with lockable drawers and coat closet.
10. 4x 4 whiteboard on both solid interior side walls, centered
11. Provide new task chair to be tilt, angle and height adjustable for the seat and back.
Include back support, adjustable posture controls and carpet casters. Arm height adjustment required. Provide 2 padded side chairs.
8 task desks .
7. 6’ wide x 30” deep table worksurface that is electric height adjustable with under table vertical and horizontal wire management. 30”L x 24” D fixed return with under surface pencil drawer. 24” tower with lockable drawers and coat closet. Fabric screen (approx 66” x 42”) attached to back of worksurface for privacy and acoustic silencing.
8. Cubicle enclosure walls to be 42”H and consist of one main lower fabric panel with one upper accent fabric panel. Colors and material to be selected prior to ordering. All walls will include an additional 11” frosted privacy glass screen topper.
9. Walls will include at least two standard power outlet per interior side, front and rear wall and one base opening for LAN per side and front interior wall.
10. Three worksurface mounted power plug modules with at least 4 - 110v and 2 USB (A and C) outlets each will be provided to plug into base power.
11. A box/file mobile pedestal with pencil tray unique locks. 2 keys for each file and 2 master keys(overall) to be provided.
12. Two surface mounted extendable monitor arms supporting up to approx. 20 lb monitor.
13. Provide new task chair for each workstation. Each to be tilt, angle and height adjustable
Demountable wall rooms (2) .
1. 8 x 10 Solid demountable walls with swing doors.
2. All walls to be solid fabric covered material. Solid frame doors with frosted glass inserts
3. Single dual power outlet in each interior wall.
4. One LAN punch out for rear and side walls.
5. Extra acoustic attenuation in walls required.
Commanders conference room
1. Solid demountable walls with swing door.
2. Extra acoustic attenuation in walls required.
3. All walls to be solid fabric covered material. Solid frame door with frosted glass insert.
4. Approx. 4 x 8’ on interior side wall with magnetic white board in North 1/2 of west wall.
5. Four evenly spaced dual power outlets in the interior side wall.
6. Two evenly spaced dual power outlets in the North(door ) wall.
7. Reinforce wall for a 100” 150 lb monitor to hang on the North (door) wall.
8. Place one electrical outlet and a LAN box opening for use behind the monitor.
9. One LAN punch out for rear and side walls.
10. Provide ~15’ table for 5 persons on each side and one on end. 11 total.
11. Table to have 2 pop-up connection boxes with 2 power, 2 LAN and one HDMI connection to monitor.
12. Provide a protected system to bring cables from under table to wall and up wall to monitor of safety and aesthetics.
13. Provide new 20 task chairs for table and walls . Each to be tilt, angle and height adjustable for the seat and back. Include back support, adjustable posture controls and carpet casters. Arm height adjustment required
Agency rooms (2) .
1. 10 x 7.5 Solid fabric covered demountable side and rear walls. Frosted front glass demountable wall with frosted sliding doors.
2. Two dual power outlets in each interior wall.
3. One LAN punch out for rear and side walls.
4. Same specs for task desk (above) except electric sit /stand desk is 5.5’ wide.
5. Add one and padded side chair
12 x 9 Conference room
1. Glass demountable walls on North and West walls with swing door.
2. One dual power outlet in center of interior walls.
3. Approx. 4 x 8’ on each interior side wall with magnetic white board.
4. Reinforced East demountable wall for a 75” 100 lb monitor to hang on the East wall(door) wall.
5. Place one electrical outlet and a LAN box opening for use behind the monitor.
6. One LAN punch out at bottom of East wall
7. Provide ~7’ x 30” table for 2 persons on each side and one on end. 11 total.
8. Provide 7 padded side chairs.
24’ Demountable wall East side of room Solid 24’ fabric covered demountable wall. Single swing door in approx. middle of wall. Solid frame door with frosted glass insert.
Break area and adjoining door
1. Solid fabric covered demountable walls.
2. Single swing door to divide areas. Solid frame door with frosted glass insert.
3. Break area has sliding clear glass door.
4. Break area has 6’ counter with overhead storage and two under counter 36”cabinets: one double door and one 2 drawer
5. Counter wall requires 3 separate outlets at counter level. And one by fridge at base.
6. Two evenly spaced dual outlets in exterior of North break room wall.
119- One supervisors office.
1. See rm 118 for furniture and chair descriptions. (Clone)
2. Solid cloth covered side and rear wall Clear glass front
Conference room
1. Demountable fabric covered solid side and rear walls approx. 22 x 13.
2. Approx. 4 x 8’ on each interior side wall with magnetic white board.
3. Table size 14’ , pop-up accessories and floor cable protection system info same as
Commander conf rm in rm 118.
4. Reinforced South demountable wall for a 100” 150 lb monitor to hang on the south wall.
5. Place one electrical outlet and a LAN box opening for use behind the monitor.
6. Place two dual outlets evenly spaced on each interior conf room walls.
7. Clear front wall and Sliding glass door
8. Provide 11 task chairs. Each to be tilt, angle and height adjustable for the seat and back.
adjustment required. Provide 4 padded side chairs for South wall
18 Task desks
2. Provide one exterior standard power outlets on each row of three cubicles. 6 total.
Break area
1. Solid fabric covered demountable walls with clear glass sliding door. approx 8 x 16
2. 8’ counter with overhead storage and two under counter 36”cabinets: one double door and one 2 drawer
3. Counter wall requires 3 separate outlets at counter level.
4. Two evenly spaced dual outlets in each interior wall. One outlet in exterior of west and south wall.
IT area
1. See rm 118 for furniture and chair descriptions. (Clone)
2. Demountable wall defining an area approx. 22’ x 25’ containing the two IT desks and a u shaped storage area with 24” counters
3. Rear swing door bottom west side of area. Solid frame door with frosted glass insert.
4. Storage area with overhead storage and Led lights beneath along west storage wall.
5. Place two - 36”W double drawers and two 36”W double door cabinets under storage counters.
6. Approx. 4 x 4’ on interior and exterior North wall with magnetic white board.
7. Provide 2 task chairs. Each to be tilt, angle and height adjustable for the seat and back.
adjustment required. Provide 5 padded side chairs.
121- Five supervisors offices.
2. Solid cloth covered side and rear wall. Clear glass front
Sixty-eight Micro task desk
1. See rm 131 for details ( clone)
2. Provide new task chair for each workstation. Each to be tilt, angle and height adjustable for the seat and back. Include back support, adjustable posture controls and carpet casters.
a. Arm height adjustment required.
3. Place one exterior wing wall dual outlet on each section of 4 cubicles.
Perimeter Solid fabric covered Demountable wall surrounding and dividing up room.
1. 5 swing doors entering area, 3 internal swing doors. Solid frame door with frosted glass insert for all 8.
Conference room
1. Approx 18 x 12. Clear glass front wall and sliding door .
2. Table size 10’ , pop-up table accessories and floor cable protection system info same as
Commander conf rm in rm 118.
3. Provide 7 task chairs. Each to be tilt, angle and height adjustable for the seat and back.
adjustment required. Provide 4 padded side chairs for South wall.
Break area 1
1. Solid fabric covered demountable walls with clear glass swing door. approx 18 x 12
2. 18’ Counter with overhead storage and LED lighting across East wall.
3. 5 power outlets at counter height on East wall. All interior walls to have 2 base dual outlets evenly spaced
Break area 2
1. Solid fabric covered demountable walls with clear glass sliding door. Approx 6 x 12
2. 8’ Counter with overhead storage and LED lighting across North wall.
3. 4 power outlets at counter height on North wall. All interior walls to have 2 base dual outlets evenly spaced
4. 2 under counter storage cabinets
VISION Area
1. Two Demountable wall rooms with solid fabric covered walls and solid fronts 11 x 22 and 9 x 12
2. Solid frame door with frosted glass insert.
127 - One Supervisor office
1. See rm 118 for furniture and chair descriptions. (Clone)
2. Extended solid fabric covered North wall as in diagram to utilize full room width.
3. Extra acoustic attenuation in North supervisor wall required.
4. Solid frame door with frosted glass insert.
Conference Room
1. Demountable 20’ glass wall to “T’ Into the extended supervisor office at south of room.
2. Table size 14’, pop-up accessories and floor cable protection system info same as
Commander conf rm in rm 118.
3. Approx. 4 x 8’ on each interior side wall with magnetic white board.
4. Reinforced South demountable wall for a 100” 150 lb monitor to hang on the south wall.
5. Place one electrical outlet and a LAN box opening for use behind the monitor.
6. Place two dual outlets evenly spaced on interior conf room wall.
7. Clear Sliding glass door
8. Place approx. 4’- 5’ high frost band across conf room walls starting 18” off the ground.
9. Provide 16 task chairs for table and North wall. Each to be tilt, angle and height adjustable for the seat and back. Include back support, adjustable posture controls and carpet casters. Arm height adjustment required.
131- Three supervisors offices.
3. See rm 118 for furniture and chair descriptions. (Clone)
4. Solid cloth covered side and rear wall. Clear glass front
Nine Micro task desk
1. Each micro task desk is 6’ x 6’ overall.
2. 6’ wide x 30” deep table worksurface that is electric height adjustable with under table vertical and horizontal wire management. 42”L x 24” D fixed return with under surface pencil drawer. Fabric screen (approx 66” x 42”) attached to back of worksurface for privacy and acoustic silencing.
3. Overhead storage bin over the return with LED lighting underneath( if possible) may require all micro task desks to have a solid side wall.
4. Cubicle enclosure walls to be 54”H and consist of one main lower fabric panel with one or two upper accent fabric panel. Colors and material to be selected prior to ordering. All walls will include an additional 11” frosted privacy glass screen topper.
5. Walls will include at least two standard power outlets per interior side, front and rear wall and one base opening for LAN per side and front interior wall.
6. Provide two exterior standard power outlets on first and last cubicle.
7. Three worksurface mounted power plug modules with at least 4 - 110v and 2 USB (A and
C) outlets each will be provided to plug into base power.
8. A box/file mobile pedestal with pencil tray unique locks. 2 keys for each file and 2 master keys(overall) to be provided.
9. Two surface mounted extendable monitor arms supporting up to approx. 20 lb monitor.
10. Provide new task chair for each workstation. Each to be tilt, angle and height adjustable
173 - TWO demountable walls
1. One 16’ wide demountable glass walls with sliding clear glass opening.
2. One 11’ wide demountable glass walls with sliding clear glass opening
3. Ensure glass door opening space is 48” wide and 8’ tall
4. Place approx. 4’- 5’ high frost band across both walls starting 18” off the ground. No frost on doors.
5. Ceiling in room is 12’ high.
191-
One supervisors office
Two U- shaped workstations (no demountable walls)
1. See rm 118 supervisor office for furniture and chair descriptions
L shaped work area
1. add 30 “ deep counter to remainder of East and south wall
2. add 2 padded task chairs
ADDITIONAL REQUIREMENTS
1. The Morrell Operations Center is a restricted area and requires security escort (provided by govt). Foreign nationals need minimum 30 days advance notice to process access.
Launch activities may require cessation or alteration of activities to preclude interference.
Expect 8 hour, Mon – Fri work days due to escort constraints.
2. All rooms will be measured by vendor and integrated into drawings showing cubicle and demountable wall placement inside the room that will be presented to customer.
Remedies for desired cubicle fit problems due to distances, pillars, pilasters, walkway widths and other unforeseen circumstances will be approved before a final draft document of each room will be created and physical product is ordered.
3. Vendor will provide a certified electrician for the following tasks:
a. Disconnect power from all existing cubicles, consoles and workstations in ALL rooms. All workstations receive power via ceiling access poles. No cubicles are floor powered.
b. Reconnect power as required to the new floorplan locations as provided by vendor by extending or combining previous old whips, connections and utilizing existing breakers.
4. Expect work to be divided into 3 construction phases.
a. Room 118, 119, 173, 191 first.
b. Rooms 116, 117, 110, and 131 next.
c. Room 121 and 127 last
5. MOC cubicle replacement must be carefully orchestrated during construction to allow for continuous Space Launch operations. Customer will cooperate to alter their mission support patterns and seating, but MOC must always be able to support launch operations.
The demolition/install is broken down into 3 sequential phases. Coordination between vendor and purchaser and the pace of launch operations at the time of install will determine if any alteration can be made to mutually improve the demo/install process. Each preceding phase or sub-phase must be fully operational before the next phase can begin. Customer will make every effort to facilitate performing “prep” work for other phases on a non-interference basis to expedite the installation. Prep work includes items such as new power lines/conduits, wall or ceiling mount installation, running new CAT 6A or fiber comm lines etc.
6. Expect nominal work sequence as follows for each room:
a. Personnel vacate room
b. GFE removed from consoles and room by govt.
c. LAN and phone lines in old consoles removed by govt.
d. Power disconnected by vendor
e. Cubicles, consoles and furniture removed from room for disposition by vendor
f. New cubicles and furniture brought in and assembled by vendor.
g. LAN lines installed by Govt (during assembly for LAN line frame access)
h. Power reinstalled by vendor
7. Govt phones in area are IP and utilize LAN connections not separate phone lines.
8. In case of room description inconsistencies
a. all overhead storage requires LED lights beneath.
b. All desks require a task chair as described. Each to be tilt, angle and height adjustable for the seat and back. Include back support, adjustable posture controls and carpet casters. Arm height adjustment required.