SOW Machine Calibration.pdf

PDF 400 KB Posted

Attached to
Emory S Land ProofCert Test /Frank Cable AJT Machine Calibration Federal contract opportunity
Solicitation number
N6824624Q0123
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document is a combined synopsis/solicitation for a Request for Quotes (RFQ) to provide calibration services for a ProofCert test machine with a 250,000 lbs horizontal axis and 25,000 lbs vertical axis at the USS Emory S. Land (AS39). The work must be performed in accordance with ASTM E4-16 and ISO 17025 standards and includes troubleshooting, diagnostic software, hardware failure, mechanical and electrical repairs. The calibration certificates are required upon completion.

The solicitation is a Total Small Business Set-Aside with a NAICS code of 811210 - Electronic and Precision Equipment Repair and Maintenance, and a small business size standard of $34,000,000. The period of performance is from September 27, 2024 to September 30, 2024. The Government requires a Firm Fixed Price contract. Offers will be evaluated on price and other factors to determine the most advantageous to the Government.

View the file

Other files for this federal contract opportunity

Other files attached to Emory S Land ProofCert Test /Frank Cable AJT Machine Calibration, newest first.
File Type Posted
Attachment (1a)_ESL Statement of Work.pdf PDF
Attachment (1a)_ESL Statement of Work.pdf PDF
Attachment (b)_Addendum 52.212-1.docx DOCX document
Attachment (a)_Quotation Sheet.docx DOCX document
Attachment (1b)_Frank Cable Statement of Work.pdf PDF
Attachment (c)_52.212-2 .docx DOCX document
Attachment (c)_52.212-2 .docx DOCX document
Attachment (a)_Quotation Sheet.docx DOCX document
Attachment (b)_Addendum 52.212-1.docx DOCX document
Wage Determination Rev 22.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLY ORDER REQUEST

USS EMORY S LAND (AS39) WORK ORDER REQUEST

Proof Cert Calibration

Vessel:

Technical POC:

TPOC Title/Rank:

Date#:

1.0 ABSTRACT:

1.1 The ProofCert test machine with 250,000 lbs (SERIAL #22113) horizontal axis and 25,000 lbs (SERIAL #22113) vertical axis, requires 18 month periodic calibration IAW ISO ASTM E4-16 and ISO 17025.

2.0 REFERENCES/REQUIREMENTS:

2.1 The calibration and certification must be IAW ASTM E4-16 and ISO 17025 as required.

3.0 EQUIPMENT DESCRIPTION/QUANTITY/LOCATION:

3.1 Conduct calibration IAW ISO 17025 and ASTM E4-16 of 25/250K horizontal and vertical axis.

3.2 Location of work to be performed:

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 Government furnished service: If shipment of equipment is required to perform work, equipment may be shipped to address is line 10.1.

5.0 NOTES:

5.1 N/A

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 Calibration certificates are required upon conclusion of calibration.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Request calibration of the ProofCert machine to include troubleshooting, diagnostic software, hardware failure, mechanical and or electrical failures.

7.2 Request horizontal axis SERIAL #22113 calibrated to specified range of 5000-

250,000 lbs with tolerance of +/- 5%.

7.3 Request vertical axis SERIAL #22113 calibrated to specified range of 250-25,000 lbs with tolerance of +/- 5%.

7.4 Request validation of calibration with proof of certification for records retention.

7.5 Check overall state of machine since initial install, troubleshoot any findings, and repair if necessary (equipment is still under warranty).

7.6 Coordinate and gain access through

SUPPLY ORDER REQUEST

USS EMORY S LAND (AS39) WORK ORDER REQUEST

Proof Cert Calibration

7.7 Provide their own means of transportation to the location of the work to be performed.

7.8 Provide their own means of shipping for equipment utilized to calibrate Proof Cert Machine.

7.9 Provide their own manning for hauling equipment on and off ship.

7.10 The company performing the work shall be accredited through A2LA to perform

ASTM-E4 calibrations.

8.0 PERIOD OF PERFORMANCE (POP) & LOCATION:

8.1 Date requesting work be conducted:

8.2 Work shall not take longer than 4 days to complete

8.3 Location:

9.0 ADDITIONAL REQUIREMENTS:

9.1 N/A

10.0 SHIPPING ADDRESSES

10.1

11.0 Point of Contacts

File details come from the government source that posted it. Updated .