This document is a Statement of Work (SOW) for the calibration of a ProofCert test machine for the USS Emory S. Land (AS39). The work requires 18-month periodic calibration of the 25,000 lbs vertical axis and 250,000 lbs horizontal axis in accordance with ASTM E4-16 and ISO 17025 standards. The calibration must include troubleshooting, diagnostic software, hardware failure, and mechanical/electrical repair. The work is to be performed within 4 days and the company performing the work must be accredited through A2LA to perform ASTM-E4 calibrations.
The related federal contract opportunity is a Request for Quotes (RFQ) solicitation for the calibration and troubleshooting services. It is a total small business set-aside with a NAICS code of 811210 and a $34M size standard. The Government is seeking a firm fixed-price contract for the required services with a period of performance from 27 September 2024 to 30 September 2024. Quotations are due by the response date and time listed in the Contract Opportunities website.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment (1a)_ESL Statement of Work.pdf | ||
| Attachment (b)_Addendum 52.212-1.docx | DOCX document | |
| Attachment (a)_Quotation Sheet.docx | DOCX document | |
| Attachment (1b)_Frank Cable Statement of Work.pdf | ||
| Attachment (c)_52.212-2 .docx | DOCX document | |
| Attachment (c)_52.212-2 .docx | DOCX document | |
| Attachment (a)_Quotation Sheet.docx | DOCX document | |
| Attachment (b)_Addendum 52.212-1.docx | DOCX document | |
| Wage Determination Rev 22.pdf | ||
| SOW Machine Calibration.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLY ORDER REQUEST
USS EMORY S LAND (AS39) WORK ORDER REQUEST
Proof Cert Calibration
Vessel:
Technical POC:
TPOC Title/Rank:
Date#:
1.0 ABSTRACT:
1.1 The ProofCert test machine with 250,000 lbs (SERIAL #22113) horizontal axis and 25,000 lbs (SERIAL #22113) vertical axis, requires 18 month periodic calibration IAW ISO ASTM E4-16 and ISO 17025.
2.0 REFERENCES/REQUIREMENTS:
2.1 The calibration and certification must be IAW ASTM E4-16 and ISO 17025 as required.
3.0 EQUIPMENT DESCRIPTION/QUANTITY/LOCATION:
3.1 Conduct calibration IAW ISO 17025 and ASTM E4-16 of 25/250K horizontal and vertical axis.
3.2 Location of work to be performed:
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:
4.1 Government furnished service: If shipment of equipment is required to perform work, equipment may be shipped to address is line 10.1.
5.0 NOTES:
5.1 N/A
6.0 QUALITY ASSURANCE REQUIREMENTS:
6.1 Calibration certificates are required upon conclusion of calibration.
7.0 STATEMENT OF WORK REQUIRED:
7.1 Request calibration of the ProofCert machine to include troubleshooting, diagnostic software, hardware failure, mechanical and or electrical failures.
7.2 Request horizontal axis SERIAL #22113 calibrated to specified range of 5000-
250,000 lbs with tolerance of +/- 5%.
7.3 Request vertical axis SERIAL #22113 calibrated to specified range of 250-25,000 lbs with tolerance of +/- 5%.
7.4 Request validation of calibration with proof of certification for records retention.
7.5 Check overall state of machine since initial install, troubleshoot any findings, and repair if necessary (equipment is still under warranty).
7.6 Coordinate and gain access through
SUPPLY ORDER REQUEST
USS EMORY S LAND (AS39) WORK ORDER REQUEST
Proof Cert Calibration
7.7 Provide their own means of transportation to the location of the work to be performed.
7.8 Provide their own means of shipping for equipment utilized to calibrate Proof Cert Machine.
7.9 Provide their own manning for hauling equipment on and off ship.
7.10 The company performing the work shall be accredited through A2LA to perform
ASTM-E4 calibrations.
8.0 PERIOD OF PERFORMANCE (POP) & LOCATION:
8.1 Date requesting work be conducted:
8.2 Work shall not take longer than 4 days to complete
8.3 Location:
9.0 ADDITIONAL REQUIREMENTS:
9.1 N/A
10.0 SHIPPING ADDRESSES
10.1
11.0 Point of Contacts