SOW_LORAIN_EZSUPPLY_BLDG_FLOOR RENEWAL.docx

DOCX document 763 KB Posted

Attached to
Amendment A00001; RFQ 70Z03026CCLEV0117; USCG LORAIN EZ-SUPPLY FLOORING RENEWAL, USCG STA LORAIN, 110 ALABAMA AVE, LORAIN, OH 44052.
Solicitation number
70Z03026CCLEV0117
Issued by

About this file

This is a Statement of Work (SOW) for flooring renewal at the USCG Station Lorain boathouse facility located at 110 Alabama Avenue, Lorain, Ohio. The contractor must furnish all labor, materials, equipment, and supervision to complete structural rail demolition, slab trench infill, mechanical paint removal, precision polymer re-grading, and installation of a multi-layer heavy-duty slip-resistant epoxy/urethane floor coating system. The work encompasses approximately 1,536 square feet and includes extraction of two 55-foot embedded steel tram rails, removal of rear-wall stop blocks, complete mechanical paint removal down to bare concrete aggregate, and correction of surface slopes while preserving natural drainage profiles that slope toward the main exterior door at approximately one-quarter inch per foot. All work must comply with federal, state, and local regulations, OSHA, NFPA, ASTM, and ANSI standards, with dust extraction and HEPA filtration required throughout demolition and grinding operations.

The flooring system must withstand harsh marine conditions including exposure to fresh lake water, thermal variations, concentrated forklift wheel loads, and chemical exposure to marine fuels and hydraulic fluids. Technical requirements include a high-solids moisture vapor barrier, waterproof multi-layer industrial coating, and heavily textured slip-resistant finish using angular aluminum oxide aggregate. All transitions and thresholds must be monolithic and feather seamlessly with no level transitions exceeding one-sixteenth inch. The contractor must submit manufacturer product data sheets, safety data sheets, detailed application procedures, and execution plans for USCG approval prior to on-site operations. A minimum 48-hour cure period is required before the floor can be returned to service, and the contractor must provide a two-year comprehensive warranty covering blistering, peeling, delamination, settlement, cracking, and premature wear-through. Pre-bid site visits are available weekdays 7:00 a.m. to 2:30 p.m. by contacting the Contracting Officer's Representative.

View the file

Other files

File Type Posted
70Z03026QCLEV0117 A00001 SF30.pdf PDF
A00001RFI Responses dated 9_28_26.pdf PDF
Material and Labor Estimate Worksheet.xls XLS spreadsheet
70Z03026QCLEV0117 Request for Information (RFI).docx DOCX document
70Z03026QCLEV0117 SF1442-22.pdf PDF
70Z03026QCLEV0117 RFQ.docx DOCX document
70Z03026QCLEV0117 RFQ ltr.pdf PDF
oh1.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

USCG LORAIN EZ-SUPPLY FLOORING RENEWAL

SEPT 2026

STATEMENT OF WORK

FOR

USCG Lorain – Flooring renewal

GENERAL REQUIREMENTS

PART 1 – GENERAL

1. SCOPE: The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supervision required to perform complete structural rail demolition, slab trench infill, complete mechanical removal of existing floor paint, precision polymer re-grading to design drainage profiles, and installation of a multi-layer heavy-duty slip-resistant epoxy/urethane floor coating system within the existing boathouse facility. The contractor will provide a turn-key solution to deliver an even floor base with durable, slip-resistant, and high-performance floor system. The Contractor shall comply with all federal, state, and local regulations as well applicable Federal Acquisition Regulations (FAR), and consensus/technical standards (i.e.- OSHA, NFPA, ASTM, ANSI, etc.).

Contractors will coordinate on-site pre-bid visits with Contracting Officers Representative (COR) listed at end of this document M-F 0700-1430.

1.1. Service Conditions

The completed floor system must withstand harsh marine station operating conditions, including continuous exposure to fresh lake water, thermal variations, and concentrated mechanical wheel loads exerted by small forklifts and battery-powered electric pallet jacks. All transitions across the slab surface and through doorways must be monolithic, durable, and free of wheel-impact hazards.

2. EXISTING SITE CONDITIONS

2.1. Slab Dimensions: Exterior wall footprint approximately (effective slab area approximately 1,536 sq. ft.).

2.2. Embedded Tram Rails & Stop Blocks: Two (2) longitudinal steel tram rails (railroad profile) are embedded flush or semi-flush in the concrete slab, each measuring approximately 55 linear feet (110 total linear feet of rail). Structural steel/timber stop block assemblies are anchored near the rear interior wall.

2.3. Surface Coating: The existing slab has an existing layer of floor paint. 100% of this paint coating must be mechanically removed down to clean, unpainted aggregate concrete and all interferences removed.

2.4. Drainage Slopes & Contours:

2.4.1. Lengthwise Fall: The floor maintains a continuous longitudinal grade sloping downhill toward the main exterior door threshold at a pitch of ¼” per foot (approximately 12 inches total drop over the 48-foot distance).

2.4.2. Secondary Drainage Swales: Inward drainage valleys run longitudinally approximately 3 feet off the exterior sidewalls. All new mortar applications must preserve and follow these swale geometries so water discharges naturally out the doorway without ponding.

2.4.3. Clearance Constraints: Overhead roll-up doors, pedestrian man doors, and perimeter foundations cannot accept substantial elevation changes. The finished surface must feather to existing door threshold elevations.

3. TECHNICAL SPECIFICATIONS & EXECUTION

3.1 Protection of Coast Guard Assets

The Contractor shall protect all adjacent Coast Guard property, including masonry block walls, overhead roll-up doors, door track assemblies, and electrical equipment from concrete slurry, flying debris, and airborne dust.

All concrete sawing, grinding, shot blasting, and demolition tools must utilize integrated dust extraction shrouds connected to operational HEPA-filtered vacuum units in compliance with OSHA respirable crystalline silica standards.

3.2 Performance Objectives

3.2.1 Demolition, Extraction, and Slab Rehabilitation

Complete Removal: Extract and remove the two (2) 55-foot lengths of embedded steel tram rails and the rear-wall stop block assemblies. Demolish, unbolt, or torch-cut anchors flush with the underlying concrete.

Note: The tram rails do not need to be filled in their entire length to the exterior haul-out area; natural termination just outside of the boathouse threshold is sufficient.

Structural Trench Infill: Infill the resulting trenches and dished swales to establish a completely monolithic, structural concrete slab. The repaired sections must not settle, crack, or separate under concentrated forklift wheel loads.

Waste Management: Environmentally dispose of all demolished steel rails, stop blocks, concrete rubble, and debris off-site in accordance with local, state, and federal environmental regulations. Construction dumpsters must be covered.

3.2.2 Substrate Preparation and Coating Removal

100% Paint Removal: Mechanically remove all existing floor paint, sealers, oils, and contaminants from the 1,536 sq. ft. slab down to bare, porous, sound concrete aggregate.

Optimal Surface Profile: Establish a mechanical concrete surface profile (CSP) that ensures maximum chemical and mechanical adhesion of the proposed floor coating system.

Prohibited Methods: Caustic chemical strippers, solvents, and acid-etching solutions are strictly prohibited. Only mechanical methods (e.g., shot-blasting, diamond grinding) are allowed.

3.2.3 Slope Correction, Swale Preservation, and Threshold Integration

Preserve Natural Drainage: Ensure all grading modifications preserve the continuous ¼″ per foot lengthwise slope and the longitudinal cross-slopes. Water must drain naturally out of the boathouse door thresholds without ponding or pooling.

Low Spot Correction: Correct all low spots, surface depressions, and uneven joints.

Seamless Threshold Integration: Feather all transitions smoothly to the door thresholds and adjacent slab surfaces. No lips, steps, or level transitions greater than 1/16″ are permitted, ensuring smooth passage for forklifts and material handling equipment.

3.2.4 High-Performance, Heavy-Duty Floor Coating System

Waterfront Moisture Mitigation: Integrate a high-solids moisture vapor barrier/mitigation system that prevents osmotic blistering, peeling, or delamination.

Mechanical & Traffic Durability: Deliver an industrial-grade, multi-layer floor coating system designed to withstand heavy wheel traffic from material handling equipment without wearing through, chipping, or debonding.

Chemical & UV Resilience: Provide a finish coat that is highly stable against UV radiation from open bay doors and resistant to marine fuel, motor oil, hydraulic fluids, and the like.

Aggressive Slip Resistance: Establish a heavily textured, slip-resistant finish. Aggregate used must be angular (e.g., aluminum oxide) to resist pulverization; rounded quartz and silica sand are prohibited.

3.2.5 Operational Integration and Scheduling

Minimize Downtime: Develop and execute a schedule that minimizes operational disruptions.

Environmental & Cure Monitoring: Manage all temperature, dew point, and curing window conditions in accordance with chemical manufacturers’ guidelines to ensure a flawless chemical cure before turning the floor back over to Coast Guard material handling equipment.

4. QUALITY ASSURANCE & SUBMITTALS

4.1 Required Submittals

Contractor will provide technical documents/specifications for structural repair mortars, concrete, doweling systems, bonding agents, primers, resins, aggregates, topcoats and the like. Prior to beginning on-site operations, the Contractor shall submit for USCG review and approval:

1.

2.

3.

4.

4.1.

4.1.1. Manufacturer Product Data Sheets: Complete technical data for all materials to be used.

4.1.2. Safety Data Sheets (SDS): SDS sheets for all chemical components, repair mortars, solvents and the like brought on site.

4.1.3. Application Procedures: Detailed manufacturer surface preparation and recoat window instructions.

4.1.4. Execution Means & Methods: Provide exact technical execution plan in phase sequence.

4.2 Environmental & Cure Restrictions

1.

2.

3.

4.

4.1.

4.2.

4.2.1. Coating application shall not take place unless the ambient and concrete substrate temperatures are at least above the calculated dew point and within manufacturer operating limits.

4.2.2. The Contractor shall allow the complete multi-layer system to cure undisturbed for a minimum of 48 hours (or as required by manufacturer guidelines) before turning over the floor for material handling equipment traffic.

5. WARRANTY

1.

2.

3.

4.

5.

5.1.

5.1.1. The Contractor shall provide a two (2) year comprehensive written warranty upon final acceptance of work by the USCG Contracting Officer's Representative (COR). The warranty shall cover:

5.1.2. Any blistering, peeling, delamination, or debonding of the epoxy system from the concrete substrate.

5.1.3. Any settlement, cracking, or failure of the patched rail trench sections.

5.1.4. Breakdown or premature wear-through of the non-slip aluminum oxide aggregate matrix under normal station operations and material handling equipment traffic.

POC’s

COR: CWO Steve Mensen, PH- 216-408-1039, E-Mail- Steven.L.Mensen@uscg.mil

Picture of one side of tram rail with swale that needs to be filled in before leveling entire floor.

*Note- Tram rails do not need to be filled in the entire length to haul-out area. Natural termination just outside of the boathouse will suffice.

image1.jpeg image2.png image3.png