STATEMENT OF WORK

SHORT TITLE: USS LABOON (DDG-58) PRE-SRA OFFLOAD

TYPE OF ORDER: Completion

1. PERIOD OF PERFORMANCE:

Start Date: 02 AUG 2021 Completion Date: 15 AUG 2021

2. PLACE(S) OF PERFORMANCE:

a. Onboard USS LABOON (DDG-58) while at NAVSTA Norfolk, pier TBD

3. DESCRIPTION OF TASK: The contractor shall provide crane and rigging services to effect 71 (removals listed below) and transfer with semi-truck three directors listed in item #8 below.

1. 11 Ammunition Ready Service Lockers (RSL)

2. 24 antennas at various locations and levels (port and starboard)

3. 5 lifts for Torpedo Tube removals none greater than 2500 pounds

4. 6 Chaff lockers (less than 1500 pounds ea.)

5. 4 NULKA Launchers (625 pounds ea.)

6. 6 Chaff RSLs (600 pounds ea.)

7. 2 AN/SLQ-59 V6 Shelter removals 2 ea. (less than 2000 pounds)

8. 3 Director Removals

a. Each one includes one antenna 600 pounds – 1000 pounds once landed on transfer stands.

b. Director is 3,500 pounds - 5000 pounds once landed on transfer stands.

9. 19 miscellaneous ship’s material pallets. (Less than 2,000 pounds ea.)

3.1 The contractor shall provide support personnel and crane and forklift(s) for USS LABOON to remove listed items. The contractor shall utilize standard rigging practices and experience.

3.2 The LABOON personnel shall provide personnel for the removals. This includes all mechanical and electrical disconnections and assistance with hook on in areas aloft as required.

3.2.1 Contractor to hook up and sling material off of ship.

3.3 The LABOON shall provide pallets and material to secure all items to them as required for land transportation.

3.3.1 Contractor will land material on designated pallets for ship’s force to secure and then relocate on pier as required to maintain safe pier conditions and fire lanes.

3.4 Contractor to load items removed 1-7 and 9 onto government trucks as provided by ship’s force.

3.5 The contractor shall assist NSWC Crane and ship’s force personnel in landing item # 8 directors removed onto to storage and transfer stands and relocate on pier as required to maintain safe pier conditions and fire lanes.

3.5.1 Contractor shall load directors onto contractor provided trucks for transfer to SRA contractor’s MHI Berkley, Norfolk facility.

3.5 The contractor shall comply with applicable local, state, and federal OSH and EPA laws.

4. GOVERNMENT FURNISHED INFORMATION/EQUIPMENT/MATERIAL:

4.1 GOVERNMENT FURNISHED INFORMATION (GFI):

a. Government SME will be present to assist with loading directors and associated antennas onto skids.

4.2 GOVERNMENT FURNISHED EQUIPMENT (GFE):

a. Government Trucks to transfer 1 through 7 and item 9 to required location.

b. All tools required to detach items being rigged and removed.

c. Specialty slings as required.

4.3 GOVERNMENT FURNISHED MATERIAL (GFM):

a. All Pallets and Director Skids required for transportation.

b. Line/straps as required to secure items to pallets.

5. CONTRACTOR FURNISHED EQUIPMENT/MATERIAL/TRANSPORTATION:

5.1 CONTRACTOR FURNISHED EQUIPMENT (CFE):

a. Lifting slings and normal tools of the trade are to be provided by the contractor.

5.2 CONTRACTOR FURNISHED MATERIAL (CFM):

a. Consumables, tools and materials required to support task. Contractor shall provide material that is not available through the Federal Supply System, i.e. miscellaneous parts, tools and hardware.

5.3 CONTRACTOR FURNISHED TRANSPORTATION (CFT):

a. Semi-truck, low boy, to transfer 3 Directors

1. Each one includes one antenna 600 pounds – 1000 pounds once landed on transfer stands.

2. Director is 3,500 pounds - 5000 pounds once landed on transfer stands.

6. TRAVEL: Travel is not authorized.

7. SECURITY: The highest level of security required for this Contract is NONE.

8. OTHER REQUIREMENTS:

8.1 The contractor shall comply with any and all applicable NAVSEA Standard Items in the execution of this task order.

9. SUBJECT MATTER EXPERT (SME):

a. MARMC Engineering personnel as needed.

b. NSWC Crane personnel for director removals only.