SOW ISU 90s and reqs -.pdf
PDF 8 MB Posted
- Attached to
- ISU-90s for MSRT West Federal contract opportunity
- Solicitation number
- 70Z08426QDL940003
About this file
This is a Statement of Work (SOW) for the purchase of ten customized ISU-90 shipping containers for the U.S. Coast Guard Maritime Security Response Team (MSRT) West and Regional Dive Locker East. The vendor must provide fully customized ISU-90 containers configured to rapidly and safely transport dive locker capabilities worldwide, with shipping, handling, and assembly included in the quote. Components will ship to two locations: Regional Dive Locker West in National City, CA 91950, and Regional Dive Locker East in Portsmouth, VA 23703.
The SOW specifies detailed configurations for six ISU-90 units: (1) Clean Gear chamber support equipment with small parts cabinets, tool boxes, technical manuals, oxygen/HP air charging hoses, oxygen kits, AED, chamber kits, TRCS door components, and NATO rig protectors; (2) Dirty Gear chamber support featuring high-pressure compressor, generator, diesel containers, lifting slings, and support equipment; (3) SCUBA and SSDS support equipment including tank racks, XLDS console, support boxes, CAOS rack, umbilicals, communication boxes, and dive tool kits; (4) Two F470 inflatable boats with engines; (5) Support equipment including Bison Emergency HPU pumps, voltage step-down transformer, hydraulic QPAK, welder, hose reel, and various accessories; and (6) Standard ISU-90 container. Additionally, six kit tie-down units and container freight to both locations are required. RDLW requires four configured units (ISU-90s One through Four), while RDLE requires six units (ISU-90s One through Six). This is a U.S. Government transaction that is tax exempt.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 - A0001.pdf | ||
| Questions v1.pdf | ||
| Schedule - MSRT Containersv1.xlsx | XLSX spreadsheet | |
| SOW-ISU 90 box Requirements RDLW-RDLE-Updated 20260423.pdf | ||
| 70Z08426QDL940003_0_US -.pdf | ||
| Schedule - MSRT Containers.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
U.S. Coast Guard Maritime Security Response Team, MSRT West (34269) Regional Dive Locker West
1022 Bay Marina Dr.
Suite 106
National City, CA 91950
STATEMENT OF WORK FOR THE PURCHASE OF
1. JUSTIFICATION:
RDLW and RDLE need to purchase ISU 90 shipping containers that are fully customized to rapidly and safely transport the dive lockers full scope of capabilities worldwide.
2. SCOPE OF SERVICES:
Vendor will provide 10 customized ISU-90’s per the following specifications (see table). Shipping, handling and assembly to be included in the quote and components will ship to Regional Dive Locker West and Regional Dive Locker East.
Item # Type Parts Number Description Qty Ordered
1 Sale TBD ISU 90 CLEAN
GEAR
(CHAMBER
SUPPORTING
EQUIPMENT)
2 ea.
2 Sale TBD ISU 90, DIRTY
GEAR
(CHAMBER
2 ea.
RAPIDLY DEPLOYABLE RECOMPRESSION CHAMBER/DIVE SUPPORT ISU-90’S
SCOPE OF WORK FOR US COAST GUARD MSRT WEST
SUPPORT, HIGH
PRESSURE)
3 Sale TBD ISU 90, SCUBA &
SSDS
SUPPORTING
EQUIPMENT
2 ea.
4 Sale TBD ISU 90, (2) F470
INFLATABLE
BOATS
2 ea.
5 Sale TBD ISU 90, SUPPORTING
EQUIPMENT
1 ea.
6 Sale TBD ISU 90 1 ea.
7 Sale 60177001 Kit Tie Down 6 ea.
8 Shipping 99999026 Container Freight to
National City, CA 91950
1 ea.
9 Shipping 99999026 Container Freight to Portsmouth, VA 23703
1ea.
3. DELIVERY LOCATION
REGIONAL DIVE LOCKER WEST
1022 Bay Marina Dr.
Suite 106 National City, CA 91950
REGIONAL DIVE LOCKER EAST
4000 Coast Guard BLVD.
Portsmouth, VA 23703
4. This is a U.S. Government transaction and is tax exempt.
ISU-90 Configuration. RDLW/RDLE
A. RDLW, is looking at ISU-90 One, Two, Three and Four Configuration. (1-4) ISU-90 Total.
B. RDLE, is looking at ISU-90 One, Two, Three, Four, Five and Six Configuration. (1-6) ISU-90 Total.
1. Six ISU-90’s would be configured in the following manor.
a. ISU-90 (One), Clean Gear, ISU-90 used for Chamber support equipment.
i. Side A. Small Parts Cabinets 8-Drawer 86019-009
1. Two chamber tool boxes. See Fig-10
2. Support equipment, parts for the chamber and three Scruber
Canisters. 8-Drawer Cabinet? See Fig-15 and 16
3. Tech Manuals. Two Drawers?
4. Oxygen and HP air charging hoses. See Fig-19
5. Oxygen Kit See Fig-9
6. AED
7. Chamber Kits A and B. See Fig-22
8. TRCS Door (3) Strong Backs See Fig-17
9. TRCS Nato Rig Protectors. See Fig-14
ii. Side B.
1. TRCS TL Patients Skid Fig-13
2. Dive Crews Gear. Four Personnel See Fig-37
3. Mission Gear Load Out. Various
b. ISU-90, (Two), Dirty Gear, used for Chamber Support. High Pressure Compressor, Generator.
i. Side A. Note: heavy equipment is placed on the bottom. Tie-Downs required.
1. Chamber Compressor. See Fig-1
2. Chamber Generator. See Fig-2
a. 440/220 Volts Step down for RCC support See Fig-5
b. Dolly See Fig-36
3. PAM VAN/ISO lifting Slings. See Fig-41
4. PAM VAN Power Cord. See Fig-18
5. PAM VAN Lighting Rod Kit. See Fig-23
ii. Side B.
1. (Two) 5 Gallon Diesel Containers.
2. Lifting Slings for the TRC and TL only. See Fig-29
3. TRC Cover See Fig-30
4. TL Cover See Fig-30
5. (3) TRC Wheels. See Fig-
6. (4) TL Wheels. See Fig-
c. ISU-90, (Three), SCUBA and SSDS Support Equipment.
i. Side A.
1. SCUBA Tanks Racks. Required, four sets of Double Tanks and twelve signal tanks. See Fig-11
2. XLDS Consol See Fig-24
3. (2) XLDS 1 and 2 support boxes. See Fig-28
4. (1) CAOS Rack. See Fig-25
5. (3) 300’ umbilical’s. See Fig-32
6. XLDS Communication. Box See Fig-42
7. XLDS Support Kit. Fig-43
8. Dive Support Tool Kits See Fig-26
9. Dive Accommodation Ladder. See Fig-27
ii. Side B.
1. Dive Personnel gear. Ten See Fig-37
d. ISU-90, (Four), (2) F470 inflatible boats.
i. Side A
1. Boat One
2. Engine
3. Boat Two
4. Boat Engine Two
ii. Boat engine Two
e. ISU-90, (Fifth), Support Equipment.
i. See Fig-3
ii. See Fig-4
iii. See Fig-6
iv. See Fig-7
v. See Fig-8
f. ISU-90, (Sixth), Standard
High Pressure Compressor for Recompression Chamber
Measurements: L47” x W33” x H36”
Weight: 440 lbs.
Fig-1
Generator for Recompression Chamber
Measurements: L44” x W29.5 x H
Weight: ?
Fig-2
Support Equipment RCC Bison Emergency HPU Pumps
Measurements: L28” x W29” x H19.5”
Fig-3
Bison HPU, support equipment for RCC lift system
Measurements: L26” x W31” H23”
Fig-4
440/220 Volts Step down for RCC support
Measurements: L17” x W26” x H45”
Fig-5
Hydraulic QPAK
L55” x W39” x H41” without the wheels
L48” x W41” x H38” with the wheels
Weight: GVRW 960 lbs
Fig-6
Blue Miller Welder
L44” x W31” x H46.5”
Fig-7
Hydraulic Hose Real
L34” x W39” x H42”
Weight: GRWT 465 lbs
Fig-8
Oxygen Kit
L25” x W21” x H9”
Weight: GRWT ? lbs
Fig-9
Two Chamber Toolbox’s. Note: Both kits are the same size.
L24” x W15” x H18.5”
Fig-10
SCUBA Tanks
L26” x W17.5” x H30” Six SCUBA Tanks
Fig-11
Dive First Aid Kit
L32” x W” x H12”
Weight: GRWT lbs
Fig-12
TRCS TL Patients Skid
L58.5” x W23” x H6”
Fig-13
TRCS Nato Ring protectors
L34” x W16” H3”
Fig-14
CO2 Scrubber Canister
Three Canisters L9.5” x C6”
Fig-15
Spare Parts for the Chamber
Several dozen such packages.
Fig-16
TRCS Door Three Strong backs
L28” x W2” x H5”
Fig-17
PAM VAN Power Cord
Fig-18
Oxygen Hoses
Fig-19
Medical Kit
L12” x W8” x H8”
Fig-20
Chamber Supervisor Kit
L20” x W12.5” x H18”
Fig-21
Chamber Primary Kit A and B
L24” x W19” x H12”
Fig-22
Lightning Rod Kit for the PAM VAN
L44” x C5”
Fig-23
XLDS Console
L29” x W27” x H15”
Fig-24
CAOS RACK
L41.5” x W36” x H19”
Fig-25
Dive Tool Kits
L23” x W17” x H 33”
Fig-26
Accommodation Ladder.
Fig-27
(2) XLDS Kit-1 and 2
L34” x W30” H17.5”
Fig-28
Lifting Slings for TRC and TL
Fig-29
(2) Covers for TL and TRC
Fig-30
XLDS Support Hoses and Manifold
Fig-31
(3) XLDS Umbilical’s
L41” x W32” x H16”
Fig-32
General Lines for rigging.
Fig-33
Canopy
L21” x W13” x H65”
Fig-34
Dolly
Fig-36
Dive Crew Bag
L44” x W25” x H17”
Fig-37
TRCS Wheels
(6)
(1)
Fig-38
Dive Streator
Fig-39
Books and Manuals
Fig-40
PAM VAN Lifting Slings
L34” x W30” x H18”
Fig-41
XLDS Communication Box
L15.5 x W13” x H7”
Fig-42
XLDS Support Kit
L17” x W9” x H13”
Fig-43
| SOW ISU 90's.pdf |