SOW for (SI) Kitchen Renovation and Drain Line Repair - 1100 Forest Hill Road - Building #12A - with addendum.pdf

PDF 171 KB Posted

Attached to
Kitchen Renovation & Drain Line Repair
Solicitation number
2139071
Issued by
Richmond County, New York

About this file

This Scope of Work document outlines a kitchen renovation and drain line repair project for Building 12A at 1100 Forest Hill Road, Staten Island, New York, issued by the New York State Office for People with Developmental Disabilities (OPWDD) Staten Island Developmental Disability Services Office. The project encompasses complete kitchen demolition and reconstruction, including plumbing and electrical work performed by licensed professionals, installation of new cabinetry, countertops, flooring, fixtures, and repair of a leaking kitchen drain line with required video inspection. The scope specifies detailed material requirements including Mohawk 936 Mystic Oak flooring, Wilsonart quartz countertops in Coastal Q4036, Marsh Cabinets Style Atlanta, Elkay stainless steel sink, Kohler faucet, Braun range hood, and Halo LED recessed lighting. A mandatory site visit is scheduled for Tuesday, September 29, 2026, at 11:00 AM, with quotes due October 9, 2026, at 2:30 PM. The project must be completed within 30 days of award. Work hours are 8:30 AM to 4:00 PM, Monday through Friday, with the residence potentially occupied during construction.

This is a New York State Public Works project subject to prevailing wage requirements under Article 8 of Labor Law with rates specified by NYSDOL under PRC number 2026026798. All contractors and subcontractors must be registered with the New York State Department of Labor, with registration certificates required to accompany quote submissions. The bid price must include all materials, labor, disposal fees, and site cleanup. Detailed cost breakdowns are required showing itemized materials, equipment, and labor costs using the provided Cost Breakdown Form. Vendors must provide current Certificates of Workers' Compensation Insurance, Liability Insurance, and Disability Coverage prior to contract award, and new vendors must provide two references for similar projects. All electrical and plumbing work requires licensed professional certification and sign-off. Contractors are responsible for all dumpster fees, lavatory fees, permits, and daily debris removal. Certified payroll records must be submitted electronically every 30 days and at invoicing, with final invoices directed to accountspayable@ogs.ny.gov using Unit ID #3660239. Quotes are valid for 60 days, and award will be made to the most responsible and responsive vendor offering the lowest cost while meeting all project requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SCOPE

Addendum Last Page

DESCRIPTION:

This is a NYS Public Works project and prevailing wages are to be paid.

12-B Kitchen Renovation.

The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. Refer to attached specification for the following scope of work. Site must be cleaned, and all materials secured at the end of each workday.

Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of renovation, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent or authorized AHJ.

SCOPE OF WORK includes, but is not necessarily limited to the following:

Kitchen Renovation and Drain Line Repair:

All existing plumbing being removed and or replaced must be performed by a licensed plumber (with license number) who shall install, complete, and provide written certification all new plumbing work.

All existing electrical being removed and or replaced must be performed by an electrician (with license number) who shall install, complete, and provide written certification for all new electrical work.

Cover all Smoke Detector heads throughout the working areas.

Kitchen shall be enclosed with HD plastic to prevent dust and contamination from traveling from project area.

Walk off mats to be supplied at enclosed egress and entry areas for containment of dust and construction contaminants during demo and reconstruction.

Demolition of entire kitchen and removal of all debris daily.

Kitchen drain line is leaking. Vendor responsible for locating and repairing drain line. Vendor is responsible for locating, exposing, and repairing drain lines. After drain line repair video inspection is required.

All studs must be exposed for CEO or DDSO officiate for inspection if they are rotted.

Sink/dishwasher drain connections to be supplied new to stack. (NO PVC) Dishwasher to be removed by vendor and replaced. OPWDD will supply the new dishwasher.

Sink, and all drain lines to be vented according to NYS Plumbing Code.

All new water stops shall be installed. (No hot work) Wall oven to remain and OPWDD to supply new, Allow for cabinetry revisions in size.

All flooring to be removed and replaced with Mohawk hot and heavy 936 Mystic Oak.

Facility: 12-A

Facility Address: 1100 Forest Hill Road Bldg# 12A Staten Island, NY 10314 Hostel #7081

Point of Contact Stanley Jakubowski MS2 off-718 983 5336

Point of Contact: Jose Lugo MS3 Off- 718 983 5337

Project Title:

Kitchen Renovation and Drain Line Repair-12-A

Summary of Work:

Total Renovation Kitchen and repair drain line

All work to cease till Scope of Work and Quote for any new materials are produced and authorized in writing by both OPWDD and Vendor.

New 30” 4 burner stove (supplied by OPWDD) to be installed at burner top location. Allow for new cabinetry resizing.

Cabinets colors as specified. (Attached) Overhead cabinets (Passthrough) to be removed and existing framing shall have new GWB installed primed and painted No lazy Susan cabinetry shall be installed.

Designed pot cabinet to be installed with heavy duty slides and cabinet doors. (2 where applicable) All door hardware and drawer slides shall be self-quiet close type.

No pocket hinges will be accepted. See specs A visual inspection of opened walls/ ceilings and demo’ed areas must be completed before any install of new GWB is performed. (See above for change orders) A visual inspection of all wall insulation to take place after the demo of walls. Replace as necessary.

Porta Potty (Latrine services) shall be supplied by vendor during demolition and reconstruction.

A PRE visual inspection of all electrical components, plumbing lines, drain lines and beams must be performed prior to reinstallation of new materials. (See above for change orders) All work shall conform to all NYS applicable codes, rules, and regulations.

1. Contractor shall verify the actual measurements and condition of work to be done to ensure a complete and accurate job. Contractor to supply all labor, material, and equipment to completed work.

2. The construction Area must be covered with heavy-duty construction grade plastic during Demo. Walk off mats provided so the remaining home remains clear of debris and dust.

3. Removal of all finishes and equipment as required to complete the job. (Including but not limited to) old kitchen cabinets, old flooring, existing plumbing and sink, sheet rock, tiles, and back splash from walls and replaced with new. Check all insulation for removal and or replacement if required.

4. Stainless steel wall corner guards to be removed and replaced at all currently installed locations.

5. The existing ceiling replaced with new 1/2” Type X unless noted sheetrock, taped and plastered then sanded down all imperfections. Ceiling to receive to coats primer and paint. (Sherwin Williams 7005 Pure White- Flat finish).

6. The existing walls replaced with new 5/8” Type X unless noted sheetrock, taped and plastered then sanded down all imperfections. Ceiling to receive to coats primer and paint. (Sherwin Williams 7005 Pure White- Satin finish).

7. Paints shall consist of 2 coats of primer, and 2 coats on all replaced walls. Texture to match all existing wall. Sherwin Williams 7005 Pure White-Satin finish to be used for walls.

8. Pantry closet to receive patch, 2 coats of primer and 2 coats of paint (TBD).

9. Flooring in pantry to be removed and replaced with 936 Mystic Oak.

10. New Stove (under countertop range) to be (Supplied by OPWDD) shall be installed with new connections. (Vendor’s Plumber)

11. All Fire Alarm equipment (strobes, horns, smoke detectors) to be reinstalled by vendor if removed from ceiling or walls for new GWB. As per NFPA codes. Vendor to coordinate with PSES AHJ representative prior, during and end of ceiling removal and installation so building can be placed on fire watch for safety of residence in home and equipment such as sprinkler heads and devices.

12. Secure all electrical, visual audio cable and equipment and sprinkler cover/caps for reinstallation by vendor.

13. Contractor is to install new recessed Halo 6 in. 8.5W Plastic LED Can-less Recessed Downlight LT6089FS351EWHDMR and remove existing light fixtures. Fixtures to be placed at least 3 feet from heat detectors. Fixtures to be placed according to plans or as specified by OPWDD AHJ. All electrical work is to be signed off by a licensed electrician, who is to ensure proper wiring connection and must conform to NYS electrical code. Certification must be provided as proof. All circuits labeled at circuit panel.

14. Provide and install new Wilsonart quartz counter tops with 4” backsplash, or similar, Color shall be Coastal Q4036 or TBD. All seams to be caulked w/proper waterproof silicone caulking. All edges to be Eased. All windows and passthroughs to have sills removed and same quartz mentioned as above, installed.

15. Provide and install new over counter stainless-steel sink Elkay Crosstown 18-gauge Stainless Steel single bowl to fit cabinet (See attachment)

16. Install new faucet Kohler Crüe semiprofessional sink faucet. (Vibrant stainless steel) All new water stops to be provided at supply lines. This shall include dishwasher if applicable. All drain lines supplied for sink areas to be metal not PVC.

17. No hot work to be performed. Pro-Press fittings only.

18. All plumbing lines relocated or adjusted must be completed by a licensed plumber.

19. Supply and install new ¾” solid hardwood Marsh Cabinets- Style Atlanta or approved equal. (Any/all drawers shall be dovetail and full extension with soft close guides.)

20. Hinges shall be overlay wrap or Amerock BP8704 self-closing or approved equal. No pocket hinges will be accepted for the project. (satin finish)

21. Satin nickel cup pulls 3” hole centers, PD82981 by Probico or approved equal, to be installed horizontally.

22. Provide and install new Braun 30” stainless range hood Model: BCSD130SS with lighting and connect to the existing exhaust system and/or shall be exhausted to outside of home.

23. All GFIC must be 5-15r commercial use with tamper resistant.

24. Supply and install Glass and stone Brix Blend Mosaic tiles as backsplash over counter and behind stove (subway style). Boarder tile to be installed at middle height of backsplash. All seams shall be caulked w/ clear waterproof silicone caulking.

25. Supply and install new 4” cove base (continuous) color (black) on exposed walls and under cabinets.

26. Caulk and seal all penetrations crevices and gaps where there any openings. Fireproof all openings on all back wall, or ceiling penetrations.

27. 5% of materials (ex: flooring, tiles, window hardware) shall be left as spare for repairs.

28. Inspection will be carried out by authorized facility staff on all plumbing and electrical completed work.

29. Contractor is responsible to remove and dispose of all debris on daily basis and at the of the project. All work must not interfere with day-to-day operation.

30. All dumpsters, Lavatory fees, extra fees and permits, if any are the sole responsibility of the awarded contractor.

31. Work area must be clean, and all tools/materials removed for safety by 4 pm each day.

This specification subject to be amended as required.

GENERAL REQUIREMENTS:

1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up.

Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.

2. Work is to be done between the hours of 8:30AM and 4:00PM, Monday through Friday.

Contractor is advised that this can be an unoccupied/occupied home at any time during construction and all items to be adhered to.

3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.

4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.

5. Smoking is prohibited by contractors at all residential and program sites owned by

OPWDD.

6. Vendor is responsible for the removal and discarding, off site, all debris, trash, damaged framing, and all work areas to be broom swept after each workday.

7. Prior to the commencement of the work, there shall be a meeting with Region 5 DDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period. Safety Plan to be supplied prior to initiation of project.

8. The NYS OPWDD SIDDDSO Region 5 Office reserves the right to pre-approve all Sub-contractors. Any Contractor intending to use sub-contractors must provide the NYS OPWDD SIDDDSO Region 5 Business Office with all sub-contractor’s contact information, in writing, prior to the determination of approval.

9. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.

10. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.

11. All warranties, guarantees (Minimum 1 year labor and manufacturer’s warranty) and written documents to be supplied to SIDDSO Plant Superintendent or Code Enforcement Official (AHJ for closing) prior to final payment of project.

SITE VISIT

A site visit is mandatory. The site visit date is scheduled for Tuesday, September 29th, 2026, at 11:00AM at the project site.

NO repetitive oratory performed after 15-minute late vendor arrival. All questions to be forwarded to Business Office for answering to all vendors.

A. Lawn Damage/Property Damage

• If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.

• Personal vehicles are not to be parked on the grass.

• Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.

B. Continuity of Work/Communication/Scheduling

• Once the job has begun, it is to be worked on continuously until completed.

• If there are any delays, even if due to inclement weather, a Work Control Representative

MUST be contacted.

• Work must be completed within 30 days of receiving the purchase order.

C. House Safety

• The residence will be occupied during the job.

• The contractor must take all reasonable care to safeguard the residents and the staff.

• The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday.

• Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day.

• The work as indicated above shall be scheduled as not to interfere with other functions of the residence. All work performed as part of this job is to be coordinated with the House Director and Plant Superintendent listed above.

All existing plumbing being removed and or replaced must be performed by a licensed plumber who shall install, complete, and provide written certification sign off for all new plumbing work.

Addendum:

• All tiles to be removed from walls.

• #14. Backsplash to be installed from doorway at pass through counter all the way to behind the refrigerator.

• Wall oven cabinet to be removed and access panel installed.

• Pantry closet to be included in flooring.

• + kitchen spec attachment.

SCOPE OF WORK includes, but is not necessarily limited to the following:
Kitchen Renovation and Drain Line Repair:
All existing plumbing being removed and or replaced must be performed by a licensed plumber (with license number) who shall install, complete, and provide written certification all new plumbing work.
All existing electrical being removed and or replaced must be performed by an electrician (with license number) who shall install, complete, and provide written certification for all new electrical work.
Cover all Smoke Detector heads throughout the working areas.
Kitchen shall be enclosed with HD plastic to prevent dust and contamination from traveling from project area.
Walk off mats to be supplied at enclosed egress and entry areas for containment of dust and construction contaminants during demo and reconstruction.
Demolition of entire kitchen and removal of all debris daily.
Kitchen drain line is leaking. Vendor responsible for locating and repairing drain line. Vendor is responsible for locating, exposing, and repairing drain lines. After drain line repair video inspection is required.
1. Contractor shall verify the actual measurements and condition of work to be done to ensure a complete and accurate job. Contractor to supply all labor, material, and equipment to completed work.
2. The construction Area must be covered with heavy-duty construction grade plastic during Demo. Walk off mats provided so the remaining home remains clear of debris and dust.
3. Removal of all finishes and equipment as required to complete the job. (Including but not limited to) old kitchen cabinets, old flooring, existing plumbing and sink, sheet rock, tiles, and back splash from walls and replaced with new. Check all ins...
4. Stainless steel wall corner guards to be removed and replaced at all currently installed locations.
5. The existing ceiling replaced with new 1/2” Type X unless noted sheetrock, taped and plastered then sanded down all imperfections. Ceiling to receive to coats primer and paint. (Sherwin Williams 7005 Pure White- Flat finish).
6. The existing walls replaced with new 5/8” Type X unless noted sheetrock, taped and plastered then sanded down all imperfections. Ceiling to receive to coats primer and paint. (Sherwin Williams 7005 Pure White- Satin finish).
7. Paints shall consist of 2 coats of primer, and 2 coats on all replaced walls. Texture to match all existing wall. Sherwin Williams 7005 Pure White-Satin finish to be used for walls.
8. Pantry closet to receive patch, 2 coats of primer and 2 coats of paint (TBD).
9. Flooring in pantry to be removed and replaced with 936 Mystic Oak.
10. New Stove (under countertop range) to be (Supplied by OPWDD) shall be installed with new connections. (Vendor’s Plumber)
11. All Fire Alarm equipment (strobes, horns, smoke detectors) to be reinstalled by vendor if removed from ceiling or walls for new GWB. As per NFPA codes. Vendor to coordinate with PSES AHJ representative prior, during and end of ceiling removal and ...
12. Secure all electrical, visual audio cable and equipment and sprinkler cover/caps for reinstallation by vendor.
13. Contractor is to install new recessed Halo 6 in. 8.5W Plastic LED Can-less Recessed Downlight LT6089FS351EWHDMR and remove existing light fixtures. Fixtures to be placed at least 3 feet from heat detectors. Fixtures to be placed according to plans...
14. Provide and install new Wilsonart quartz counter tops with 4” backsplash, or similar, Color shall be Coastal Q4036 or TBD. All seams to be caulked w/proper waterproof silicone caulking. All edges to be Eased. All windows and passthroughs to have s...
15. Provide and install new over counter stainless-steel sink Elkay Crosstown 18-gauge Stainless Steel single bowl to fit cabinet (See attachment)
16. Install new faucet Kohler Crüe semiprofessional sink faucet. (Vibrant stainless steel) All new water stops to be provided at supply lines. This shall include dishwasher if applicable. All drain lines supplied for sink areas to be metal not PVC.
17. No hot work to be performed. Pro-Press fittings only.
18. All plumbing lines relocated or adjusted must be completed by a licensed plumber.
19. Supply and install new ¾” solid hardwood Marsh Cabinets- Style Atlanta or approved equal. (Any/all drawers shall be dovetail and full extension with soft close guides.)
20. Hinges shall be overlay wrap or Amerock BP8704 self-closing or approved equal. No pocket hinges will be accepted for the project. (satin finish)
21. Satin nickel cup pulls 3” hole centers, PD82981 by Probico or approved equal, to be installed horizontally.
22. Provide and install new Braun 30” stainless range hood Model: BCSD130SS
with lighting and connect to the existing exhaust system and/or shall be exhausted to outside of home.
23. All GFIC must be 5-15r commercial use with tamper resistant.
24. Supply and install Glass and stone Brix Blend Mosaic tiles as backsplash over counter and behind stove (subway style). Boarder tile to be installed at middle height of backsplash. All seams shall be caulked w/ clear waterproof silicone caulking.
25. Supply and install new 4” cove base (continuous) color (black) on exposed walls and under cabinets.
26. Caulk and seal all penetrations crevices and gaps where there any openings. Fireproof all openings on all back wall, or ceiling penetrations.
27. 5% of materials (ex: flooring, tiles, window hardware) shall be left as spare for repairs.
28. Inspection will be carried out by authorized facility staff on all plumbing and electrical completed work.
29. Contractor is responsible to remove and dispose of all debris on daily basis and at the of the project. All work must not interfere with day-to-day operation.
30. All dumpsters, Lavatory fees, extra fees and permits, if any are the sole responsibility of the awarded contractor.
31. Work area must be clean, and all tools/materials removed for safety by 4 pm each day.
This specification subject to be amended as required.
1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.
2. Work is to be done between the hours of 8:30AM and 4:00PM, Monday through Friday. Contractor is advised that this can be an unoccupied/occupied home at any time during construction and all items to be adhered to.
3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.
4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.
5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD.
6. Vendor is responsible for the removal and discarding, off site, all debris, trash, damaged framing, and all work areas to be broom swept after each workday.
7. Prior to the commencement of the work, there shall be a meeting with Region 5 DDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period. Safety Plan to be supplied prior to initiati...
8. The NYS OPWDD SIDDDSO Region 5 Office reserves the right to pre-approve all Sub-contractors. Any Contractor intending to use sub-contractors must provide the NYS OPWDD SIDDDSO Region 5 Business Office with all sub-contractor’s contact information, ...
9. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.
10. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.
11. All warranties, guarantees (Minimum 1 year labor and manufacturer’s warranty) and written documents to be supplied to SIDDSO Plant Superintendent or Code Enforcement Official (AHJ for closing) prior to final payment of project.

SITE VISIT

File details come from the government source that posted it. Updated .