This is a Statement of Work (SOW) for the procurement and installation of new systems furniture in Room 2112B of the DeFlorez Building at Naval Air Warfare Center Training Systems Division (NAWCTSD) in Orlando, Florida. The project is divided into two phases: Phase 1 requires the purchase, shipment, and storage of new systems furniture matching existing inventory, with completion required by March 30, 2026; Phase 2 involves transport and installation of the furniture to be fully operational by April 30, 2026. The contractor must coordinate all work with government representatives, maintain daily cleanup to minimize dust and noise, ensure all work complies with applicable federal, state, and local codes including Unified Facility Criteria, and provide three copies of submittals within seven calendar days of award including Safety Data Sheets, statements of non-use of ozone-depleting substances, accident prevention plans, work schedules, bonds and insurance documentation, worker information, and standard drawings in ACAD LT 2012 and PDF formats.
The SOW specifies comprehensive safety and regulatory requirements, including compliance with U.S. Army Corps of Engineers Safety and Health Requirements Manuals and OSHA standards, with particular emphasis on electrical safety and lockout/tagout procedures. Power deenergization requires at least two weeks' prior approval from the Contracting Officer, and no live electrical work is permitted. The contractor and all on-site personnel must demonstrate United States citizenship and may require security clearances for restricted areas. Regular working hours will be established by the Contracting Officer between 6 a.m. and 6 p.m., Monday through Friday, excluding Government holidays, with no power disruptions allowed during normal working hours. Only Contracting Officer-approved materials and parts may be used, and all furniture must match existing systems. The related Intent to Sole Source notice indicates NAWCTSD intends to award to Kimball International (CAGE: 4V077), the original equipment manufacturer of the existing furniture system, with responses due by March 25, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Rm 2112B Furniture Contract Material List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title: Rm 2112B Furniture Activity Location: Naval Support Activity (NSA) Orlando FL and UCF Hyperspace Orlando, Florida Scope of Work Prepared by: NAWCTSD, Orlando
PART 1 GENERAL
1. GENERAL INFORMATION:
It is the declared and acknowledged intention and meaning to provide new systems furniture in Rm 2112B of Building #1, at the Naval Air Warfare Center Training Systems Division at 12211 Science Drive, Orlando Florida 32826.
0. Detailed Project Description
Phase 1: Purchase, ship, and store new systems furniture as listed in the materials list. Furniture must match existing. All work to be coordinated with the government (NAWCTSD) and work must be completed by 30 March, 2026.
Several requirements for this project phase are as follows:
1. All applicable federal, state, and local codes shall be followed including but not limited to Unified Facility Criteria found at https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc
1. Ensuring that all work is tested to be complete and useable
1. Ensuring dust and noise levels are kept to a minimum with daily cleanup.
Phase 2: Transport and install new systems furniture complete and ready to use including all associated appurtenances in rooms 2112B of the DeFlorez Building, 12211 Science Drive, Orlando, FL 32826. Furniture must match existing. All work to be coordinated with the government (NAWCTSD) and work must be completed by April 30, 2026.
Several requirements for this project phase are as follows:
1. All applicable federal, state, and local codes shall be followed including but not limited to Unified Facility Criteria found at https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc
1. Ensuring that all work is tested to be complete and useable
1. Ensuring dust and noise levels are kept to a minimum with daily cleanup.
1.2 SUBMITTALS
Submit three copies of the following for approval by the Contracting Officer within 7 calendar days after award.
1.2.1 Statements
a. Safety Data Sheet (SDS),
b. Statement of Nonuse of Ozone Depleting Substances (ODS),
c. Accident Prevention Plan including Activity Hazard Analysis,
d. Work Schedule,
e. Bonds and insurance.
f. Name, SSN, and Citizenship of each on site worker, and
g. Standard drawings in ACAD LT 2012 and PDF.
1.3 PERIOD OF PERFORMANCE
a. The Contractor shall be required to complete Phase 1 & 2’s entire work, ready for use, not later than 30 April 2026.
1.4 DEFINITIONS
Where "as shown", "as indicated", "as detailed", or words of similar import are used, it shall be understood that reference to the drawings/sketches accompanying this specification is made unless stated otherwise. Where "as directed", "as permitted", "approved", "acceptance", or words of similar import are used, it shall be understood that the direction, requirements, permission, approval, or acceptance of the Contracting Officer is intended unless stated otherwise. As used herein, "provided" shall be understood to mean "provided complete in place in a completely usable condition", that is "furnished and installed". As used herein "secure" shall be understood to mean "marked by solidity, firmness, and stability, especially in design or construction".
1.5 SAFETY REQUIREMENTS
In performing the contract, the Contractor shall provide for protecting the lives and health of employees and other persons and for preventing damage to property, materials, supplies and equipment in accordance with the latest revision of the U.S. Army Corps of Engineers "Safety and Health Requirements Manuals" (EM 385‑1‑1) and "Occupational Safety and Health Standards" (29 CFR 1910). Prior to commencement of the work, the Contractor shall meet in conference with representatives of the Contracting Officer to discuss and develop mutual understandings relative to the administration of safety. All OSHA work standards shall be followed including but not limited to Lockout/Tagout procedures. Electrical Safety Code and OSHA 1910 subchapter S shall be specifically followed. Prior to commencement of the work, the contractor shall meet in conference with representatives of the Contracting Officer to discuss and develop a mutual understand relative to the administration of safety. Power shall not be deenergized without at least 2 weeks’ prior approval of the Contracting Officer. No live electrical work shall be permitted.
PART 2 PRODUCTS
Use only Contracting Officer approved parts or materials.
PART 3 EXECUTION
3.1 STATION REGULATIONS
The Contractor and his employees and subcontractors shall become familiar with and obey all applicable Federal, State, local and station regulations, including fire, safety, traffic, and security regulations. No employee of the Contractor shall be admitted to the work site without satisfactory proof of United States citizenship. Some work areas may require an escort and/or a security clearance for access.
3.1.1 Working Hours
Work hours will be coordinated with the Contracting Officer. No power disruptions are allowable during normal working hours. The Contractor will work together with the Contract Surveillance Representative for access into restricted spaces. Contracting Officer shall approve working hours prior to commencement of work. Regular working hours shall consist of an 8-hour period established by the Contracting Officer between 6 a.m. and 6 p.m., Monday through Friday, excluding Government holidays.
‑‑ End of Scope of Work ‑‑