This document is a solicitation for HVAC repair services at the Rocky Mountain Research Station in Flagstaff, Arizona. The Forest Service is seeking repairs to the cooling tower, air compressor maintenance, and installation of variable frequency drives. The period of performance is August 1, 2023 through November 1, 2023. Offerors must complete the schedule of items with pricing for all work including cooling tower repairs, air compressor maintenance, and VFD installation. The solicitation includes descriptions of the technical requirements, delivery and performance schedules, and contract administration details. Evaluation criteria are provided for past performance, experience, technical approach, and cost.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Rev2 1240LT23R0063 RFI Answers.docx | DOCX document | |
| 1240LT23R0063 RFI Answers.docx | DOCX document | |
| 1240LT23R0063.pdf | ||
| J1 Wage Determinations Coconino County AZ.txt | TXT text file | |
| J2 FM-66 Submittal Tracker.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No: 1240LT23R0063 Project: Repairs to Cooling tower at Flagstaff Lab Table of Contents
| PART I—THE SCHEDULE | 6 | |
| `SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS | 6 | |
| B.1 SCHEDULE OF ITEMS – PPK Ranger District Telecom and Electrical Upgrade | 6 | |
| B.2 SCHEDULE NOTES | 6 | |
| SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK | 7 | |
| C.1 | SCOPE OF CONTRACT | 7 |
| C.2 | PROJECT LOCATON | 7 |
| C.4 | TECHNICAL SPECIFICATIONS | 7 |
| SECTION D--PACKAGING AND MARKING | 8 | |
| D-1 | PACKING AND MARKING | 8 |
| D-2 | PROJECT LABELING FOR OFFICIAL CORRESPONDENCE | 8 |
| E.1 | CLAUSES | 9 |
| SECTION F--DELIVERIES OR PERFORMANCE | 10 | |
| F.1 | CLAUSES | 10 |
| SECTION G--CONTRACT ADMINISTRATION DATA | 11 | |
| G.1 | CLAUSES | 11 |
| G.2 | OTHER REQUIREMENTS | 11 |
| SECTION H--SPECIAL CONTRACT REQUIREMENTS | 12 | |
| H.1 | CLAUSES | 12 |
| H.2 | OTHER REQUIREMENTS | 12 |
| PART II--CONTRACT CLAUSES | 15 | |
| SECTION I--CONTRACT CLAUSES | 15 | |
| I.1 | CLAUSES | 15 |
| PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS | 25 | |
| SECTION J--LIST OF ATTACHMENTS | 25 | |
| J.1 | ATTACHMENTS | 25 |
| PART IV--REPRESENTATIONS AND INSTRUCTIONS | 26 | |
| SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND | 26 | |
| OTHER STATEMENTS OF OFFERORS OR RESPONDENTS | 26 | |
| K.1 | PROVISIONS | 26 |
| SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS | 34 | |
| L.1 | PROVISIONS | 34 |
| L.2 | QUOTE PREPARATION INSTRUCTIONS: | 35 |
| M.1 | PROVISIONS | 40 |
| M.2 | PROPOSAL EVALUATION | 40 |
| M.3 | AWARD FACTORS | 40 |
PART I—THE SCHEDULE
`SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Rocky Mountain Research Station PROJECT TITLE: Flagstaff HVAC Repairs REQUISITION NO: 1086893
| Period of Performance |
| 8/1/23 – 11/1/23 |
SCHEDULE OF ITEMS
ITEM
NUMBER
| DESCRIPTION |
| PAY UNIT |
| EST QTY |
| Price |
| 0001 |
| Cooling Tower Repairs |
| LS |
| 1 |
| 0002 |
| Air Compressor Maintenance |
| LS |
| 1 |
| 0003 |
| VFD Install |
| LS |
| 1 |
Total
EA - EACH
MO - MONTH Award anticipated to be a firm fixed price contract.
LS = Lump Sum LSQ = Lump Sum Quantity
B.2 SCHEDULE NOTES
a) One award will be made from this solicitation, offeror must submit pricing for all items.
b) In order to be considered responsive, offerors are required to be registered and active in System for Award Management (SAM) in accordance with FAR 52.204-7 System for Award Management (Oct 2018) and FAR 52.204-13 System for Award Management Maintenance (Oct 2018)
c) Payment for bond premiums in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 – Mobilization.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
This project involves various repairs and preventive maintenance on the Flagstaff Lab and Greenhouse Heating Ventilation and Air Conditioning (HVAC) and Building Management System (BMS) system.
C.2 PROJECT LOCATON
The Flagstaff Lab is located at 2500 S Pine Knoll Dr, Flagstaff, AZ 86011 & the Greenhouse is located at 1800 S. Lone Tree Rd. Onsite facilities personnel will be able to direct the contractor to the specific components requiring repair.
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
Between $and $50,000 - $100,000
C.4 Contractor Requirements
4.0 Technical Requirements / Tasks
1. General
· Contractor shall repair and maintain the following pieces of HVAC equipment, restoring them to full operations in accordance with manufacturer’s recommendations.
· Contractor shall perform Lockout-tag out in accordance with 29 CFR 1910.147.
· Contractor shall perform all piping repairs in accordance with ASME B31.9: Building Services Piping (2008 current edition).
· Contractor shall leave the site tidy and clean each day
· All demolished materials are the property of the contractor and must be disposed on in accordance with Local, State, and Federal Regulations.
· Working hours are 0800-1700 M-F except Federal Holidays. Contractor may request work outside these hours to the COR.
· After repairs are complete, Contractor shall insure the components are integrated into the controls system and functioning as originally designed. Contractor may need to subcontract with a controls contractor to ensure proper integration.
2. Cooling Tower Repair (Lab)
· Repair the Baltimore Aircoil F1343 Cooling Tower in support of the precooling system. The work involves the following components:
· Replace Tower Sump Heater.
· Replace existing Spring Pump with a new Spray Pump.
· Replace Dump Solenoid Valve.
· Replace Fill Solenoid Valve.
· The installation of a new access door for cleaning and servicing the drift eliminators and spray nozzles. Consult with Baltimore Aircoil for proper configuration of an access hatch.
· Clean the Drift Eliminators and Spray Nozzles.
· Empty the reservoir and clean out any particulates which have accumulated.
· Provide water treatment system of the for the closed loop system. Water treatment system shall include filtration of fine particulates and chemical injection for corrosion and scale resistivity. Contractor shall consult with Baltimore Aircoil to determine the appropriate level of water treatment. If water quality testing is required, contractor shall include testing as part of their BASE Bid.
· Snake the floor drain on the unit to ensure proper drainage.
· Once repairs are completed, ensure integration with the existing control system to switch between preheat and precooling.
3. Air compressor Maintenance (Greenhouse)
· Perform regular preventive maintenance on two Ingersoll Rand Tank Mounted Air Compressors (Model 30TE30). Work shall include at a minimum:
· Check for oil leaks. Repair according to manufacturer’s recommendations if found.
· Check lubricant level. Fill as needed.
· Drain receiver tank condensate (if automatic draining device is not provided). Open manual drain valve and collect and dispose of condensate accordingly.
· Check for unusual noise and vibration. Troubleshoot and repair according to manufacturer’s recommendations if found.
· Ensure beltguards and covers are securely in place.
· Ensure engine (if supplied) is filled with fuel and lubricant according to the manufacturer’s recommendations.
· Ensure area around compressor is free from rags, tools, debris, and flammable or explosive materials.
· Observe operation of safety/relief valves while the compressor is running. Replace safety/relief valves that do not operate freely.
· Inspect air filter element(s). Clean if necessary.
· Inspect for air leaks. Squirt soapy water around joints during compressor operation and watch for bubbles. Troubleshoot and repair according to manufacturer’s recommendations if found.
· Check tightness of screws and bolts. Tighten as needed.
· Inspect drive belts. Adjust if necessary.
· Clean exterior.
· Drain compressor oil and clean oil sight glass. Refill oil as required by manufacturer’s recommendations.
· Restore to full operations. Final house pressure should be set to 120 psi.
4. Install two Variable Frequency Drives on Greenhouses 1 & 2 (Greenhouse)
· Install the (Government Provided) Variable Frequency Drives (ABB Model ACH550-UH-012A-2) in accordance with Manufacturer’s recommendations.
· Provide handset remotes so that they can be reset without opening the panel.
4.0 Government Furnished
N/A
5.0 Deliverables / Schedule
1. See attached fm 66 - Submittal Tracker for details on which components require advanced submittals. Allow the Government up to 10 business days to process and approve submittals.
2. Contractor shall demonstrate equipment functionality and provide operational training to onsite Facilities Personnel.
3. Provide recommendations on additional HVAC repairs if required via email to the CO and COR.
6.0 Travel
N/A
7.0 Contractor’s Key Personnel
N/A
8.0 Security Requirements
Contractor shall coordinate onsite arrival no later than 5 business days prior. Forest Service personnel shall escort the contractor while onsite.
9.0 Data Rights
N/A
10.0 Section 508 – Electronic and Information Technology Standards N/A
SECTION D--PACKAGING AND MARKING
D-1 PACKING AND MARKING
All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.
D-2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
| 52.246-12 | Inspection of Construction (AUG 1996) |
| 52.246-13 | Inspection-Dismantling, Demolition, or Removal of Improvements (AUG 1996) |
SECTION F--DELIVERIES OR PERFORMANCE
| F.1 | CLAUSES |
| 52.211-13 | Time Extensions (SEP 2000) |
| 52.211-18 | Variation in Estimated Quantity (APR 1984) |
| 52.242-14 | Suspension of Work (APR 1984) |
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calendar days after effective date of Notice to Proceed. Contract time shall include cleanup of premises.
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
G.2 OTHER REQUIREMENTS
Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held at TBD.
G.3 INVOICES & PAYMENTS
All invoices are to be submitted via the electronic Invoice Processing Platform (IPP) System.
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in previous communications from USDA and Treasury.
This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm Ensure your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. Offeror must have an established account prior to commencement of work.
Invoice Processing Platform (IPP) does not allow for the contractor to change the description of the line items being invoiced against and therefore an itemized invoice must be uploaded as an attachment(s).
Itemized invoice shall include at a minimum:
Contractor Name and Address Contract, Task Order or Purchase Order numbers Invoice Number Description of Services or work completed.
Date of services or completion.
G.4 FOREST SERVICE REPRESENTATIVES:
The signing Contracting Officer (CO) will be appointed and his/her contact information will be provided upon award of the contract. The Contracting Officer has full warrant authority over all contract issues.
A Contracting Officer Representative (COR) will be appointed for this contract upon award. The COR delegated authority, responsibilities and contact information will be defined on a delegation letter issued after contract award.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES
H.2 OTHER REQUIREMENTS
KEY PERSONNEL
(a) The Contractor shall assign to this contract the following key personnel: Project Manager.
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
USE OF PREMISES
(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.
(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.
ARCHAEOLOGICAL OR HISTORIC SITES
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
CONTROL OF EROSION, SEDIMENTATION, AND POLLUTION
(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
(b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
(c) Mechanized equipment shall not be operated in flowing streams without written approval by the Contracting Officer.
INSURANCE COVERAGE
Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.
(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence. (2) The Contractor shall have property damage liability insurance shall be required in the amount of $100,000 per occurrence.
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses: https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at: https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
| 52.203-7 | Anti-Kickback Procedures (JUN 2020) |
| 52.203-12 | Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) |
| 52.203-19 | Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) |
| 52.204-2 | Security Requirements (MAR 2021) Alternate II (APR 1984) |
| 52.204-10 | Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) |
| 52.204-13 | System for Award Management Maintenance (OCT 2018) |
| 52.204-18 | Commercial and Government Entity Code Maintenance (AUG 2020) |
| 52.204-19 | Incorporation by Reference of Representations and Certifications (DEC 2014) |
| 52.204-23 | Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) |
| 52.204-25 | Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021) |
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) (If value exceeds $35,000)
| 52.209-10 | Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) |
| 52.215-8 | Order of Precedence—Uniform Contract Format (OCT 1997) |
| 52.222-3 | Convict Labor (JUN 2003) |
| 52.222-6 | Construction Wage Rate Requirement (AUG 2018) |
| 52.222-7 | Withholding of Funds (MAY 2014) |
| 52.222-8 | Payrolls and Basic Records (JUL 2021) |
| 52.222-9 | Apprentices and Trainees (JUL 2005) |
| 52.222-10 | Compliance with Copeland Act Requirements (FEB 1988) |
| 52.222-11 | Subcontracts (Labor Standards) (MAY 2014) |
| 52.222-12 | Contract Termination - Debarment (MAY 2014) |
| 52.222-13 | Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) |
| 52.222-14 | Disputes Concerning Labor Standards (FEB 1988) |
| 52.222-15 | Certification of Eligibility (MAY 2014) |
| 52.222-21 | Prohibition of Segregated Facilities (APR 2015) |
| 52.222-26 | Equal Opportunity (APR 2016) |
| 52.222-27 | Affirmative Action Compliance Requirements for Construction (APR 2015) |
| 52.222-36 | Equal Opportunity for Workers with Disabilities (JUN 2020) (If value exceeds $15,000) |
| 52.222-50 | Combating Trafficking in Persons (NOV 2021) |
| 52.222-55 | Minimum Wages for Contractor Workers under Executive Order 14026 (JAN 2022) |
| 52.222-62 | Paid Sick Leave under Executive Order 13706 (JAN 2022) |
| 52.223-2 | Affirmative Procurement of Biobased Products under Service and Construction Contracts (SEP 2013) |
| 52.223-3 | Hazardous Material Identification and Material Safety Data Alt 1 (FEB 2021) |
| 52.223-5 | Pollution Prevention and Right-to-Know Information (MAY 2011) |
| 52.223-15 | Energy Efficiency in Energy Consuming Products (MAY 2020) |
| 52.223-17 | Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (AUG 2018) |
| 52.223-18 | Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) |
| 52.225-13 | Restrictions on Certain Foreign Purchases (FEB 2021) |
| 52.227-4 | Patent Indemnity -- Construction Contracts (DEC 2021) |
| 52.228-5 | Insurance – Work on a Government Installation (JAN 1997) |
| 52.228-12 | Prospective Subcontractor Requests for Bonds (MAY 2014) (If value exceeds $35,000) |
| 52.232-5 | Payments under Fixed-Price Construction Contracts (MAY 2014) |
| 52.232-17 | Interest (MAY 2014) |
| 52.232-23 | Assignment of Claims (MAY 2014) |
52.232-27 Prompt Payment for Construction Contracts (JAN 2017)
| 52.232-33 | Payment by Electronic Funds Transfer – System for Award Management (OCT 2018) |
| 52.232-39 | Unenforceability of Unauthorized Obligations (JUN 2013) |
| 52.233-1 | Disputes (MAY 2014) Alt 1 (DEC 1991) |
| 52.233-3 | Protest after Award (AUG 1996) |
| 52.233-4 | Applicable Law for Breach of Contract Claim (OCT 2004) |
| 52.236-2 | Differing Site Conditions (APR 1984) |
| 52.236-3 | Site Investigation and Conditions Affecting the Work (APR 1984) |
| 52.236-5 | Material and Workmanship (APR 1984) |
| 52.236-6 | Superintendence by the Contractor (APR 1984) |
| 52.236-7 | Permits and Responsibilities (NOV 1991) |
| 52.236-8 | Other Contracts (APR 1984) |
| 52.236-9 | Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) |
| 52.236-10 | Operations and Storage Areas (APR 1984) |
| 52.236-11 | Use and Possession Prior to Completion (APR 1984) |
| 52.236-12 | Cleaning Up (APR 1984) |
| 52.236-13 | Accident Prevention (NOV 1991) |
| 52.236-14 | Availability and Use of Utility Services (APR 1984) |
| 52.236-17 | Layout of Work (APR 1984) |
| 52.236-21 | Specifications and Drawings for Construction (FEB 1997) |
| 52.243-5 | Changes and Changed Conditions (APR 1984) |
| 52.244-6 | Subcontracts for Commercial Products and Commercial Services (JAN 2022) (DEVIATION APR 2020) |
| 52.246-21 | Warranty of Construction (MAR 1994) |
| 52.249-1 | Termination for Convenience of the Government (Fixed-Price) (Short Form) (APR 1984) |
Alternate I (SEP 1996)
| 52.249-10 | Default (Fixed-Price Construction) (APR 1984) |
| 52.253-1 | Computer Generated Forms (JAN 1991) |
52.219-17 Section 8(a) Award (OCT 2019) (a)By execution of a contract, the Small Business Administration (SBA) agrees to the following:
(1) To furnish the supplies or services set forth in the contract according to the specifications and the terms and conditions by subcontracting with the Offeror who has been determined an eligible concern pursuant to the provisions of section8(a) of the Small Business Act, as amended (15 U.S.C.637(a)).
(2) Except for novation agreements, delegates to the USDA Forest Service the responsibility for administering the contract with complete authority to take any action on behalf of the Government under the terms and conditions of the contract; provided, however that the contracting agency shall give advance notice to the SBA before it issues a final notice terminating the right of the subcontractor to proceed with further performance, either in whole or in part, under the contract.
(3) That payments to be made under the contract will be made directly to the subcontractor by the contracting activity.
(4) To notify the USDA Forest Service Contracting Officer immediately upon notification by the subcontractor that the owner or owners upon whom 8(a) eligibility was based plan to relinquish ownership or control of the concern.
(5) That the subcontractor awarded a subcontract hereunder shall have the right of appeal from decisions of the cognizant Contracting Officer under the “Disputes” clause of the subcontract.
(b) The offeror/subcontractor agrees and acknowledges that it will, for and on behalf of the SBA, fulfill and perform all of the requirements of the contract and meets all of the criteria set forth in paragraph (a) of this clause.
(c)Any award resulting from this solicitation will be made to the Small Business Administration, which will subcontract performance to the successful 8(a) offeror selected through the evaluation criteria set forth in this solicitation.
(d) The 8(a) contractor will notify the USDA Forest Service Contracting Officer in writing immediately upon entering an agreement (either oral or written) to transfer all or part of its stock.
52.225-9 Buy American Act-Construction Materials (NOV 2021)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
____________None____________
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description Unit of Measure Quantity Price (dollars)* Item1:
| Foreign construction material | _______ | _______ | _______ | ||
| Domestic construction material | _______ | _______ | _______ |
Item2:
| Foreign construction material | _______ | _______ | _______ | |
| Domestic construction material | _______ | _______ | _______ |
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
52.228-11 Individual Surety - Pledge of Assets (FEB 2021) (DEVIATION APR 2020) (If value exceeds $35,000)
(a) The Contractor shall obtain from each person acting as an individual surety on a performance bond or a payment bond -
(1)A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and
(2) Standard Form 28, Affidavit of Individual Surety, [except that the words “being duly sworn, depose and say” on the Standard Form 28 are replaced with the word “affirm” and the Standard Form 28 is not required to be sworn and notarized in block 12].
(b)The Contracting Officer may release a portion of the security interest on the individual surety's assets based upon substantial performance of the Contractor's obligations under its performance bond. The security interest in support of a performance bond shall be maintained—
(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 (40 U.S.C. 3131). Until completion of any warranty period, or for 1 year following final payment, whichever is later.
(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.
(3) Other contracts not subject to the requirements of paragraph (b)(1) of this clause. Until completion of any warranty period, or for 90 days following final payment, whichever is later.
(c)A surety's assets pledged in support of a payment bond may be released to a subcontractor or supplier upon Government receipt of a Federal district court judgment, or a sworn statement by the subcontractor or supplier that the claim is correct along with a notarized authorization of the release by the surety stating that it approves of such release. The security interest on the individual surety's assets in support of a payment bond shall be maintained—
(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 which require performance and payment bonds (40 U.S.C. 3131). For 1 year following final payment, or until resolution of all pending claims filed against the payment bond during the 1-year period following final payment, whichever is later.
(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.
(3) Other contracts not subject to the requirements of paragraph (c)(1) of this clause. For 90 days following final payment.
(d)The Contracting Officer may allow the Contractor to substitute an individual surety, for a performance or payment bond, after contract award. The Contractor shall comply with the requirements of paragraph (a) of this clause within the timeframe established by the Contracting Officer.
52.228-13 Alternative Payment Protections (JUL 2000) (If value exceeds $35,000 but does not exceed $150,000)
(a) The Contractor shall submit one of the following payment protections:
| Payment Bond |
| Irrevocable Letter of Credit |
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (NOV 2021) (DEVIATION APR 2020) (a)[(1) In accordance with 31 U.S.C. 3903 and 10 U.S.C. 2307, upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract [in accordance with the accelerated payment date established], to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, [with a goal of 15 days] after receipt of a proper invoice and all other required documentation from the small business subcontractor [if a specific payment date is not established by contract.
(2) The Contractor agrees to make such payments to its small business subcontractors without any further consideration from or fees charged to the subcontractor].
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial products or commercial services.
52.252-6 Authorized Deviations in Clauses (NOV 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any Agriculture Acquisition Regulation (48 CFR __4___) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
J.1 ATTACHMENTS
| Attach |
| Title |
| Dated |
| Number/Pages |
| J.1 |
| Wage Determinations Coconino County AZ |
AZ20230030
| 06/09/2023 |
| 7 pages |
| J.2 |
| FM-66 Submittal Tracker |
| 7/11/2023 |
| Excel file |
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
K.1 PROVISIONS
52.204-8 Annual Representations and Certifications (JAN 2022) (DEVIATION JUL 2020)
(a) (1) The North American Industry Classification System (NAICS) code for this acquisition is 237130.
(2) The small business size standard is $39.5 million.
(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees if the acquisition - (i)Is set aside for small business and has a value above the simplified acquisition threshold;
(ii)Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or (iii)Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(b) (1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
(i) ☐ Paragraph (d) applies.
(ii) ☐ Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless–
(A) The acquisition is to be made under the simplified acquisition procedures in part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.204-26, Covered Telecommunications Equipment or Services-Representation. This provision applies to all solicitations.
(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation.
(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(x) 52.214-14, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.
(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xvi) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial products or commercial services.
(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA–designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA–designated items.
(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation. This provision applies to solicitations that include the clause at 52.204-7.)
(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xxi) 52.225-4, Buy American-Free Trade Agreements-Israeli Trade Act Certificate. (Basic, Alternates I, II and III.) This provision applies to solicitations containing the clause at 52.225-3.
(A) If the acquisition value is less than $25,000 $50,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) (B) If the acquisition value is $50,000 or more but is less than $92,319, the provision with its Alternate II applies.
(D) (C) If the acquisition value is $92,319 or more but is less than $100,000, the provision with its Alternate III applies.
(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan-Certification. This provision applies to all solicitations.
(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications. This provision applies to all solicitations.
(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
[Contracting Officer check as appropriate.] ☐ (i) 52.204-17, Ownership or Control of Offeror.
☐ (ii) 52.204-20, Predecessor of Offeror.
☐ (iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
☐ (iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment- Certification.
☐ (v) 52.222-52, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Certification.
☐ (vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA–Designated Products (Alternate I only).
☐ (vii) 52.227-6, Royalty Information.
☐ (A) Basic.
☐ (B) Alternate I.
☐ (viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The offeror has completed the annual representations and certifications electronically in SAM website accessed through https://www.sam.gov. After reviewing the SAM information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause # Title Date Change Any changes provided by the offeror are applicable to this solicitation only, and do not result in an updates to the representations and certifications posted on SAM.
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (OCT 2020) The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services—Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .